Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF OCTOBER 04, 2009 FBO #2871
AWARD

M -- RECOVERY--M--Project #111568 - Temporary Increase of O&M Staff to work on Project Maintenance Backlog

Notice Date
10/2/2009
 
Notice Type
Award Notice
 
NAICS
561210 — Facilities Support Services
 
Contracting Office
US Army Engineer District, Mobile, P. O. Box 2288, 109 Saint Joseph Street (zip 36602), Mobile, AL 36628-0001
 
ZIP Code
36628-0001
 
Solicitation Number
W91278-09-144-ARRA
 
Archive Date
11/5/2009
 
Point of Contact
Alisa C. Murray, (251) 441-5578
 
E-Mail Address
US Army Engineer District, Mobile
(alisa.c.murray@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W91278-09-144-ARRA
 
Award Date
9/29/2009
 
Awardee
MS Technology, Inc., (DUNS 877508770)137 Union Valley Rd, Oak Ridge, TN 37830-8097
 
Award Amount
$963,207.92
 
Line Number
0006 through 0020
 
Description
This contract action was not awarded as a fixed price type because uncertainties involved in contract performance did not permit costs to be estimated with sufficient accuracy to use any type of fixed price contract. As such, a cost-reimbursement type action was awarded (FAR 16.301-2). RECOVERY - PER FAR 5.7, THIS NOTICE IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO THE CONTRACTOR UNDER THE CURRENT CONTRACT NUMBER: MS TECHNOLOGY, INC., W91278-06-C-0052, Operations and Maintenance of Government Owned Facilities and Equipment at Carter's Lake Project Office in Oakman, GA. The U. S. Army Corps of Engineers awarded a modification P00036 against the basic Cost Plus Award Fee Contract W91278-06-C-0052. This contract action was not awarded as a fixed price type because uncertainties involved in contract performance did not permit cost to be estimated with sufficient accuracy to use any type of fixed price contract. As such, a cost reimbursement type action was awarded. Furthermore:) This modification will increase the level of effort required under the current contract, with major points being: 1) repair/replace waterlines at Doll Mountain, Woodring Branch, Harris Branch and between the Ranger building and emergency spillway 2) upgrade campsites 1-13 at Doll Mountain to safely accommodate larger RVs and to provide 50 amp service 3) Upgrade 8 additional sites at Doll Mountain and Woodring Branch to 50 amp service 4) Install low-flow toilets, energy efficient lighting and water heaters in 10 existing park toilet buildings/camper washhouses 5) Increase shoreline maintenance, erosion control and clean-up on lake 6) Re-route waterline to park attendant sites at Damsite Park. 7) Install concrete bins for secure collection of scrap 8) Replace 897 feet of guardrails 9) Harden/gravel areas around warehouses 10) Install park closures/gates in 8 areas 11) Repair 763 LF of sidewalks 12) Level out tri-level campsites at Harris Branch 13) Consolidate trash collection points and add recycling stations in parks 14) Add 3 volunteer campsites at Damsite Park 15) Replace PMO flagpole. Modification P00036 is funded by American Recovery and Reinvestment Act (ARRA) funds and all clauses apply.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA01/W91278-09-144-ARRA/listing.html)
 
Record
SN01979051-W 20091004/091002235058-8922bdc55a21fd097198e2a431dc29da (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.