Loren Data's SAM Daily™

samdaily.us
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe

FBO#2883

Y - Construction of Structures and Facilities

AWARDS - October 16, 2009


  • W912PL-09-C-0026 - $958,335.00
    PRADO DAM, PHASE II, CORONA NATIONAL HOUSING TRACT, HABITAT RESTORATION, SANTA ANA RIVER MAINSTEM, RIVERSIDE COUNTY, CALIFORNIA
    CJW Construction, Inc., 841 East Washington Avenue, Suite B, Santa Ana, California 92701
     
  • W912PL-09-C-0037 - $13,749,732.10 Recovery, $2,862,495.95 Non-Recovery
    RECOVERY--Y--RECOVERY-LOWER SANTA ANA RIVER CHANNEL, REACH 9, PHASE 2B (ALONG GREEN RIVER GOLF COURSE), ORANGE AND RIVERSIDE COUNTIES, CALIFORNIA, PROJECT NO. 075354
    Harper Contracting, Inc., 8201 W. 5400 South, Magna, Utah 84044-0369
     
  • W912PL-09-C-0023 - 3175438.00
    DESIGN AND CONSTRUCT AN 11,200 SF NAF CHILD DEVELOPMENT CENTER (CDC) AT NELLIS AIR FORCE BASE, NEVADA
    United Construction Company, 5300 Mill Street, REno, Nevada 89502, United States
     
  • W912PL-09-C-0030 - $2,270,000.00
    OCEANSIDE HARBOR MAINTENANCE DREDGING, SAN DIEGO COUNTY, CALIFORNIA
    Manson Construction Company, 5209 E. Marginal Way South, Seattle, Washington 98134
     
  • W912PL09C0027 - 9858700.00
    CONSTRUCTION OF A NEW FLIGHT LINE FIRE STATION, CRASH RESCUE STATION, BASE EMERGENCY OPERATION CENTER AND BASE EMERGENCY COMMUNICATION CENTER AT DAVIS-MONTHAN AIR FORCE BASE, ARIZONA
    D.L. Withers Construction, 322 E. Harbour Drive<br />, Phoenix, , Arizona 85034, United States
     
  • W912PL-09-C-0029 - $2,250,500.00 Recovery, $38,500.00 Non-Recovery
    RECOVERY--Y--RECOVERY-SAN DIEGO RIVER AND MISSION BAY; MIDDLE JETTY REPAIR, SAN DIEGO COUNTY, CALIFORNIA, PROJECT NO. 015750
    Connolly-Pacific Co., 1925 Pier D Street, Long Beach, California
     
  • W912DQ10P0020 - $46,478.00
    RECOVERY--Y--CONSTRUCT ADA PARK ATTENDANT BOOTHS AND CONCRETE CONTRACTOR CAMP PADS AT WHEATLAND AND LIGHTFOOT PARKS, POMME DE TERRE LAKE PROJECT, NEAR HERMITAGE, MISSOURI
    HBR Construction LLC (DUNS #557069072)<BR>24504 Mackey Rd<BR>Edwards, MO 65326
     
  • W912PL-09-C-0033 - $3,200,000.00 Recovery, $34,316,000.00 Non-Recovery
    RECOVERY--Y--RECOVERY-PORT OF LONG BEACH (DEEPENING)AND OTHER LONG BEACH PROJECTS, LOS ANGELES COUNTY, CALIFORNIA PROJECT NO. 013274
    Manson Construction Co., 5209 E. Marginal Way S., Seattle, Washington 98134
     
  • W912PL-09-C-0032 - $13,378,960.00 Recovery; $459,500.00 Non-Recovery
    RECOVERY--Y--RECOVERY-UPPER NEWPORT BAY, ECOSYSTEM RESTORATION, PHASE 2, ORANGE COUNTY, CALIFORNIA, PROJECT NO. 76163
    RDA Contracting, Inc., 2900 Main Street, Suite 106, Alameda, California 94501
     
  • AG-9702-C-10-0002 - $269,341.00
    RECOVERY - CORONADO NF, AZ MT. GRAHAM THE REMOVAL & INSTALLATION OF BUILDINGS AND TOILETS.
    Marsh Development, Inc., P.o. Box 502, Sonoita, Arizona 85637-0502, United States
     
  • AG-9702-C-10-0001 - $292,946.17
    RECOVERY - CORONADO NF-SPENCER CANYON REMOVE & INSTALL TOILETS AND BUILDINGS.
    Pima Paving, Inc., 5180B North La Cholla, Tucson, Arizona 85705-1257, United States
     
  • FA4661-09-P-0141 - $77020.00
    MSA GATES
    M.E. Tafoya, 5304 Alameda Ave<br />, El Paso, Texas 79905, United States
     
  • C6066090028 - 208354
    THE REHABILITATION OF A SEWAGE LAGOON INCLUDING REPLACING THE EXISTING LAGOON LINER IN CELLS #1 AND #2, INLET PIPING, CLEANOUTS, INTERCELL TRANSER PIPING, GATEVALVES, REMOVING SLUDEGE IN CELLS AND DISPOSAL
    AMERICAN RESOURCE SOLUTIONS INC,52 W DOWNER PL STE 207 ,AURORA IL 605066107
     
  • AG-05G2-C-09-0101 - $195,150.00
    ROAD 2400 M.P. 4.7 NOMAD CREEK BOX CULVERT PROJECT
    Arriba Construction, 309 Washington ST NE, Olympia, Washington 98501, United States
     
  • VA249-RA-0770 - 397,649.00
    RECOVERY Y--RECOVERY ACT CONSTRUCTION PROJECT REPLACE SWITCH BOARD
    ATS FIDELIS GROUP, INC.;3300 CUMBERLAND BLVD STE 300;ATLANTA;GA;303393169
     
  • VA241-RA-1472 - 1,415,600.00
    RECOVERY Y--RECOVERY ACT - UPGRADE ELEVATORS
    LEGION CONSTRUCTION, INC.;248 MILL RD STE 1;CHELMSFORD;MA;018241616
     
  • VA243-RA-0704 - 417,000.00
    RECOVERY Y--RECOVERY ACT -REPLACE AND UPGRADE HEATING, VENTILATION AND AIR CONDITIONING COMPONENTS AND CONTROLS CONSTRUCTION PROJECT # R630-08-409-02
    VETERANS CONTRACTING GROUP, INC.;526 FAYETTE AVE;MAMARONECK;NY;105432212
     
  • VA786A-RA-0206 - 78,201.00
    RECOVERY Y--R-CSD-138-MH04 PRE-ENGINEERED METAL STORAGE BUILDING, JEFFERSON BARRACKS NATIONAL CEMETERY, MO.
    GREENLEAF RESOURCES, LLC;10185 CR 2020;ROLLA;MO;654017832
     

This Issue's Index  |  Today's FBO Daily Index Page |
Created on 14-Oct-2009 by Loren Data Corp. -- info@fbodaily.com
What's the Hubbub at LD.com? ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.