SOLICITATION NOTICE
56 -- Repair Site Wide Damaged Insulation - Solicitation
- Notice Date
- 10/30/2009
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 238310
— Drywall and Insulation Contractors
- Contracting Office
- Department of the Army, U. S. Army Materiel Command, Anniston Chemical Agent Disposal Facility (ANCDF), 3580 MORRISVILLE ROAD, Anniston, Alabama, 36201, United States
- ZIP Code
- 36201
- Solicitation Number
- ANCDF-RFQ-W10-0252
- Archive Date
- 11/24/2009
- Point of Contact
- Ashley Rollins, Phone: 256-238-0721 x 131
- E-Mail Address
-
ashley.rollins@wancdf.com
(ashley.rollins@wancdf.com)
- Small Business Set-Aside
- N/A
- Description
- Solicitation 1. Re-insulate bare piping at both the inlet and outlet sides of LIC-PUMP-104as well as downstream of pump vertical run. Approx. 10 Ft. of 1" pipe. 4 90's 2. Install new standard foam valve covers on following chill water return and supply valves. Replace insulation on valves as needed. •§ 03-76-3/4-V-9461-SC •§ 03-76-3/4-V-9460-SC •§ 03-76-3/4-V-9497-SC •§ 03-76-3/4-V-9464-SC •§ 03-76-3/4-V-9443-SC •§ 03-76-3/4-V-9444-SC 3. Replace approx. 3 ft. section of SS lagging connection on PRW-TANK-101. The missing section is on plant west top side of PRW-TANK-101. Man lift required 4. Blast Attenuation Duct has covers slipping at expansion. Tighten loose covers on CE3 & CE4 5. Repair insulation / jacket on 1"-PW-2455-WI and 1"-DC-5422-P-ET lines and valves down to 23-FE-036/037. Location outside HDS Roll Off area. 6Ft. of Pipe-8 Tee's & 2 90's 6. Repair insulation / jacket on 3"-VT-6367-P-ET line in area of LAB-TANK-101. Presently covered with duct tape. 1 Ft. insulation and jacket at penetration. 6. At LAB-TANK-101 truck unload station remove insulation from 2"-SD-490-P-ET and 2"-SD-710-P-ET lines and 36-2"-V-12 and 36-2"-V-13 valves. Replace insulation and jacket. 8Ft. of 2" pipe-3 90's, 2 Tee's 7. Re-insulate decon line 1"-DC-5435-P. Location near door 072. approx.4' of 1" pipe insulation and jacket. 8. Install removable insulation blanket for 61-PSV-274 on secondary cooling water. Location in walk way outside MDB Door 072. 9. Insulate / Jacket 114-XV-094 Butterfly valve PHS-FILT-113/110. 26" Valve. 10. Re-insulate DFS Flue Gas line elbow. 2 (two) 44" FLG Elbow location near PCS Coolers 11. Re-insulate HWR line 9113 from 76-HEAT-754 in CHB, including valves 76-3/4"-V-9326 and 76-3/4"-V-9212. Approx. 5ft. pipe 1(one) 90 and 2 (two) valves. 12. Insulate 2 "city water backflow preventer. Location in CHB Hydraulic room. Approx 4 (four) ft. of 2" pipe and back flow preventer. 13. Remove and replace insulation on PMB Hot Water Boiler Discharge to entrance of Hot Water Supply Tanks. Approx. 5 (Five) ft. of 3(three) inch pipe valve and regulator, Approx. 2(two) ft. 1 ½ pipe. 14. Replace insulation on 114-XV-450 and 2 (two) Ft. above and below valves, on line 22" -FLG-091-K as shown on AN-6-P-520. Replace with removable insulation blanket. Approx. 6 (six) Ft. 15. Replace insulation on 114-XV-93 and 2 (Two) above and below valve on line 22" FLG-054-K as shown on AN-6-P-522. Replace with removable insulation blanket. 16. Replace insulation on 114-XV-449 and 2 (Two) above and below valve on line 36 " FLG-090-K-I as shown on AN-6-D-524 Replace with removable insulation blanket. 17. Insulate the "CAP" on the ITT Bell and Gossett Triple Duty Valve on the discharge side of both Chilled Water Pumps No.-1 ( 03-Lab-PUMP 301 ) and Chilled Water Pump No. 2 ( 03-Lab-Pump-302 ). Insulation for the caps needs to be removable to enable any maintenance requirements.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/notices/4bec3bd06641d7f944f7b1aa89d03f07)
- Record
- SN01995178-W 20091101/091030234919-4bec3bd06641d7f944f7b1aa89d03f07 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |