Z -- RECOVERY--Z--PROJECT CODE 2570, PLUG ONE SLUICE GATE TO REDUCE FUTURE MAINTENANCE, CANTON LAKE, OKLAHOMA

Notice Date
10/30/2009
 
Notice Type
Special Notice
 
Contracting Office
US Army Engineer District, Tulsa, ATTN: CESWT-CT, 1645 South 101st East Avenue, Tulsa, OK 74128-4609
 
ZIP Code
74128-4609
 
Solicitation Number
W912BV-09-D-2019
 
Archive Date
1/28/2010
 
Point of Contact
tinacox, 9186697088
 
E-Mail Address
US Army Engineer District, Tulsa
(tina.cox@us.army.mil)
 
Small Business Set-Aside
N/A
 
Description
RECOVERY - THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER THE CURRENT CONTRACT NUMBER W912BV-09-D-2019, DESIGN-BUILD (DB)PERFORMANCE ORIENTED CONSTRUCTION ACTIVITIES (POCA), EASKY CONSTRUCTION. THIS RECOVERY ACT APPROVED PROJECT IS A TASK ORDER FOR PLUG ONE SLUICE GATE TO REDUCE FUTURE MAINTENANCE, CANTON LAKE, OK LAHOMA IN ACCORDANCE WITH NAICS 237990. THE WORK REQUIRES THE CONSTRUCTION OF A CAST-IN-PLACE CONCRETE SLUICE PLUG DOWNSTREAM FROM THE GATE SLOTS IN LOW FLOW SLUICE NO. 2 AND RELOCATION OF SLUICE GATE, HOIST EQUIPMENT, AND CONTROLS. IN GENERAL, THE WORK CONSISTS OF THE FOLLOWING BUT IS NOT LIMITED TO: A. THE CONTROL ROOM ROOF SLABS ON SLUICE NOS. 2 AND 3 SHALL BE REMOVED TO ALLOW RELOCATION OF THE GATES AND HOISTS TO THEIR NEW LOCATIONS. B. A LINKBELT HTC-8670LB CRANE SHALL BE PROVIDED BY THE CONTRACTOR AND POSITIONED AS SHOWN ON THE DRAWINGS TO MOVE THE ROOF SLABS. ONLY THE SPECIFIED LINKBELT CRANE MAY BE USED. C. THE SERVICE GATE IN SLUICE NO. 2 SHALL BE MOVED TO THE EMERGENCY GATE SLOT IN SLUICE NO. 3. D. THE HOIST EQUIPMENT SHALL BE REMOVED FROM SLUICE NO. 2 AND INSTALLED IN SLUICE NO. 3 FOR THE OPERATION OF THE EMERGENCY GATE. E. THE SLUICE GATE HOISTS CONTROLS AND ELECTRICAL POWER SHALL BE RELOCATED FROM SLUICE NO. 2 TO SLUICE NO. 3, TESTED, AND RECALIBRATED. F. A STEEL PLATE COVER SHALL BE BOLTED TO THE VENT ON THE SLUICE NO. 2. G. A STEEL REINFORCED CONCRETE PLUG, INCLUDING ANCHORS AND WATERSTOPS, SHALL BE CONSTRUCTED DOWNSTREAM OF THE GATE SLOTS IN SLUICE NO. 2. H. AFTER RELOCATION OF THE GATES, HOISTS, AND CONTROLS, AND REPLACEMENT OF ROOF SLABS, NEW ETHYLENE PROPYLENE DIENE MONOMER (EPDM) ROOFING SHALL BE CONSTRUCTED ON SLUICE NOS. 2 AND 3 CONTROL ROOMS ROOFS. THE ESTIMATED COST RANGE IS LESS THAN $100,000.00. THE CONTRACT SPECIALIST FOR THIS ACTION WILL BE TINA COX, (918)669-7088, E-MAIL TINA.A.COX@USACE.ARMY.MIL.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA56/W912BV-09-D-2019/listing.html)
 
Record
SN01995465-W 20091101/091030235347-ac7b8645d705643d4cdce96e1669059f (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.