Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF NOVEMBER 15, 2009 FBO #2913
AWARD

Y -- RECOVERY--Y--PROJECT NUMBER 5850, Ferrells Bridge Dam, Lake O' The Pines, TX CONSTRUCT STORAGE FACILITY AT PINEY WOODS REGIONAL OFFICE, LAKE OF THE PINES PROJECT OFFICE

Notice Date
11/13/2009
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
US Army Engineer District, Fort Worth, PO Box 17300/819 Taylor Street, Fort Worth, TX 76102-0300
 
ZIP Code
76102-0300
 
Solicitation Number
W9126G-10-C-0005
 
Archive Date
12/13/2009
 
Point of Contact
Allen R. Bassett, 817-886-1051
 
E-Mail Address
US Army Engineer District, Fort Worth
(allen.r.bassett@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W9126G-10-C-0005
 
Award Date
11/13/2009
 
Awardee
PARAGON INDUSTRIAL APPLICATIONS, INC. (827896411)<br> 10012 W NEW BOSTON RD<br> HOOKS, TX 75561-6593
 
Award Amount
$743,300.00
 
Line Number
0001
 
Description
This contract action was accomplished using other than competitive procedures because a statute exists that expressly authorizes or requires that the acquisition be made from a specific source or through another agency (FAR 6.302-5); specifically, Sole source awards under the 8(a) Program. Per FAR 6.302-5 a J&A is not required for this award. DESCRIPTION: This is a special notice to inform the public of the use of the Recovery Act funds. RECOVERY: THIS NOTICE IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO 8(a) CONTRACTOR PARAGON INDUSTRIAL APPLICATIONS, INC. The Contract Specialist for this action is Allen R. Bassett at 817-886-1051; or by e-mail at Allen.R.Bassett@usace.army.mil This contract action was accomplished using Other Than Full and Open Competition under the authority of FAR 6.302-5(b)(4), Sole source awards under the 8(a) Program15 U.S.C. 637 and the Partnership Agreement dated 1 February 2002 between the U.S. Small Business Administration (SBA) and the Department of Defense (DoD). The contractor shall provide all labor, supervision, tools, transportation, equipment, and materials necessary to construct a storage facility at the Lake of the Pines Project Office. Work entails site preparation, to include surveying, concrete foundation, plumbing, and electricity, for the erection of a pre-engineered metal building. Additionally, interior framing, drywall, painting, electrical, HVAC, flooring, and rollup doors are required work elements. Contract Award Amount: $743,300.00. Contractor:Paragon Industrial Applications, Inc. 10012 W. New Boston Rd Hooks, Texas 75561-6593 DUNS: 827896411 POINT OF CONTACT: Allen R. Bassett 817-886-1051 US Army Corps of Engineers 819 Taylor Street, Room 2A19 Fort Worth, Texas 76102-0300
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA63/Awards/W9126G-10-C-0005.html)
 
Record
SN02003366-W 20091115/091113235428-237d2e49bed3e361a8647f2aa8b6d429 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.