Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF NOVEMBER 22, 2009 FBO #2920
AWARD

Z -- RECOVERY--Z--Project Number AR0676 - Wall Repair, Building 697, Devens, MA

Notice Date
11/20/2009
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
US Army Engineer District, New England, 696 Virginia Road, Concord, MA 01742-2751
 
ZIP Code
01742-2751
 
Solicitation Number
W912WJ09R0018
 
Archive Date
12/20/2009
 
Point of Contact
Brad Schweitzer, 978-318-8022
 
E-Mail Address
US Army Engineer District, New England
(brad.a.schweitzer@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912WJ-09-C-0013-P00001
 
Award Date
11/19/2009
 
Awardee
KALLIDUS TECHNOLOGIES, INC (185964371)<br> 585 MIDDLESEX ST #2<br> LOWELL, MA 01851-1404
 
Award Amount
$254,063.00
 
Line Number
CLIN 0003
 
Description
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): KALLIDUS TECHNOLOGIES, INC, Contract number W912WJ-09-C-0013 The work of this project consists of the replacement of the roof and wall repairs to Building 697 at Fort Devens in Devens, Massachusetts. Building 697 has a roof constructed of three separate areas with a total area of 11,413 square feet. The Contractor shall remove the existing roof system, including gutters and downspouts, to the structural deck. After the existing roof has been removed, the Contractor shall survey and inspect the deck for deterioration. The Contractor shall provide a written report of the conditions found. Upon approval of the Contracting Officer, the Contractor shall repair the roof deck as necessary. The existing roofing materials have been previously identified as potential asbestos containing materials (ACM). The Contractor shall construct a complete new standing seam roof on top of the existing concrete deck. This includes all blocking, metal framing, wall panels, roof panels, insulation, flashings, fascia, gutters, soffits, and associated items. The Contractor shall provide a new seamless gutter and downspout system to match the style and size of the existing system, with screens to prevent debris from entering the gutter system. The Contractor shall also provide extensions for existing roof apputenances, new roof hatch access way, new electrical lighting and power outlets, and a new lightning protection system.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA33/Awards/W912WJ-09-C-0013-P00001.html)
 
Record
SN02008392-W 20091122/091120235928-d01a9fe966c1f5c39cef93f7d8d05dc7 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.