Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF NOVEMBER 12, 2009 FBO #2910
MODIFICATION

59 -- Circuit Boards

Notice Date
11/10/2009
 
Notice Type
Modification/Amendment
 
NAICS
334418 — Printed Circuit Assembly (Electronic Assembly) Manufacturing
 
Contracting Office
RDECOM Contracting Center, Aberdeen Installation Contracting (RDECOM-CC), Directorate of Contracting, 4118 Susquehanna Avenue, Aberdeen Proving Ground, MD 21005-3013
 
ZIP Code
21005-3013
 
Solicitation Number
W91ZLK-10-T-0013
 
Response Due
11/16/2009
 
Archive Date
1/15/2010
 
Point of Contact
Susan Sowa, 410-278-0888
 
E-Mail Address
RDECOM Contracting Center, Aberdeen Installation Contracting (RDECOM-CC)
(susan.sowa@us.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
Amendment W91ZLK-10-T-0013 0001 is issued to provide answers to questions, clarifications and to upload updated additional files (Attachment 3). Attached zip file contains the Gerber and NC Drill files. The closing date of the solicitation has been extended through November 16, 2009 @ 5:00 PM Eastern Standard Time. Please SUBMIT YOUR QUOTATIONS to Ms. Sowa at the RDECOM Contracting Center Aberdeen Installation Contracting Division, 4118 Susquehanna Avenue, Aberdeen Proving Ground, MD 21005-3013. Quotations may be submitted via email to: susan.sowa@us.army.mil or Fax 410-306-3726. Quotations must be signed, dated, and received by the closing date. For questions concerning this Request for Quotations contact Susan Sowa Contracting Specialist @ email susan.sowa@us.army.mil Additional questions must be received no later than November 10, 2009 @ 3:00 PM. Question 1: Gerber files for PCB- part number 5-15-32420. Answer: Attached zip file contains the Gerber and NC Drill files for the PCB- Part Number 5-15-32420 (Attachment 3) is uploaded under Additional Info in this Amendment 0001. Question 2: On the BOM, there is reference to Notes- i.e.: on Item #2 it says SEE NOTE 7. I dont see the notes that are referenced here. Answer: The BOM goes together with drawing # 5-15-32419; therefore note 7 refers to note 7 on 5-15-32419. Question 3: On the BOM, Items 18 thru 33 are referring to wire- I need to know where that goes on the assembly. Answer: One end of the wire will be soldered to the board, as shown in 5-15-32419. Leave the other end untouched; please twist each set of wires as described in 5-15-32419. Question 4. In the description in the email you sent, you refer to 4 mounting holes that will not be conformally coated. Is there a spec saying it needs to be conformally coated? And with what kind of coating? Answer: Note 4 in drawing 5-15-32419 conveys the material use for coating using item 35 in PL5-15-32419. Please also cover the mounting holes during conformal coating. Question 5. In the description, it also refers to and XP Power part that needs to have an 8 week lead time. Where is this part on the BOM? Answer: That is the DSF200LV filter from XP Power. If this item is not in stock, the standard lead time is 12 weeks. However, there is an expedited fee that XP charges to shorten the lead time to 8 weeks.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/e75e014447f9c7cc44ea18eccbfd61b7)
 
Place of Performance
Address: RDECOM Contracting Center, Aberdeen Installation Contracting (RDECOM-CC) Directorate of Contracting, 4118 Susquehanna Avenue Aberdeen Proving Ground MD
Zip Code: 21005-3013
 
Record
SN02001656-W 20091112/091110235519-e75e014447f9c7cc44ea18eccbfd61b7 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.