MODIFICATION
Z -- RECOVERY 2009 STIMULUS PROJECT for A/E Services for the Design and Construction of the San Juan FBI Building
- Notice Date
- 12/2/2009
- Notice Type
- Modification/Amendment
- NAICS
- 541310
— Architectural Services
- Contracting Office
- General Services Administration, Public Buildings Service (PBS), Project Management Acquisition Branch (2PCB), 26 Federal Plaza, Room 1639, New York, New York, 10278
- ZIP Code
- 10278
- Solicitation Number
- GS-02P-10-DT-C-0004
- Response Due
- 12/14/2009 3:00:00 AM
- Point of Contact
- Claudia Rivera, Phone: 212 264-5244, Claudia Y Rivera, Phone: 212 264-5244
- E-Mail Address
-
claudia.rivera@gsa.gov, claudia.rivera@gsa.gov
(claudia.rivera@gsa.gov, claudia.rivera@gsa.gov)
- Small Business Set-Aside
- N/A
- Description
- Request For Information (RFI) is hereby issued to answer the following questions: Question # 1 For Criteria 3) Lead Designer Profile: Can I submit 3 pages for each or do I need to fit all 3 of our lead designers onto 3 pages? ANSWER: Profile must not exceed 3 pages for each Lead Designer. Question # 2 I understand that we can submit 2 completed projects for each of them in Criteria 4) Lead Designer Portfolio. What about in Criteria 1) Past Performance on Design? Can we submit up to 5 projects for each of the 3 of our lead designers? ANSWER: For Criteria 1 no more than 5 projects can be submitted. Question # 3 I understand that we are to submit our SF330 Part II. Am I to assume that we can format the Submission Requirements and Evaluation Criteria in an 81/2 by 11 format and not in the SF330 Part I format? ANSWER: Yes, All documentation must be submitted in 8.5"X11" format. SF330 Part I is not required for the Stage I submission. Question # 4 Are the 358 structured parking spaces a part of the office building, or are they part of the parking structure that is being done by Gruzen Samton? ANSWER: No, the 358 structured parking spaces will be for the new FBI complex. Question # 5 The project description says that this project will ‘complete the second phase of the master plan design for the site.’ Can you describe what is included in the first phase and what is included in this second phase? ANSWER: Phase I consists of a new 500 car structured parking garage (designed by Gruzen Samton), a new entrance way for the existing Federico Degetau building (including a new bollard security line), and site work. Phase II includes a roadway connecting the Oneill street entrance with the Phase I work, site fencing, and surface parking for the existing federal building. The Phase II work is being done to complete the Degetau Federal Building Campus. Question # 6 Can we use 11x17 foldouts in an 8 ˝ x 11 vertical format? ANSWER: No.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/GSA/PBS/2PCB/GS-02P-10-DT-C-0004/listing.html)
- Place of Performance
- Address: 150 Carlos E. Chardon Street, Hato Rey, Puerto Rico 00918, San Juan, Puerto Rico, 00918, United States
- Zip Code: 00918
- Zip Code: 00918
- Record
- SN02014879-W 20091204/091202235619-f1d8ab11c651c151e96f65b6ee86052e (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |