Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF DECEMBER 09, 2009 FBO #2937
SOLICITATION NOTICE

Z -- RECOVERY--Z--PROJECT NUMBER 38921, Repairs Building. 63-110 Transite Roof

Notice Date
12/7/2009
 
Notice Type
Presolicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
RDECOM Contracting Center - Pine Bluff (RDECOM-CC), ATTN: CCRD-PB, 10020 Kabrich Circle, Pine Bluff, AR 71602-9500
 
ZIP Code
71602-9500
 
Solicitation Number
W911RP-10-T-0048
 
Response Due
1/11/2010
 
Archive Date
3/12/2010
 
Point of Contact
Pamela Burton, 870-540-4074
 
E-Mail Address
RDECOM Contracting Center - Pine Bluff (RDECOM-CC)
(pam.burton@us.army.mil)
 
Small Business Set-Aside
Competitive 8(a)
 
Description
RECOVERY - - THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPRTUNITY IS AVAILABLE TO CONTRACTORS UNDER W911RP10T0048. This requirement is limited to the following contractors and contract numbers: AMAX INC., 14001 Taylor Loop Rd., Little Rock, AR 72223-3430, Contract No. W911RP-09-G-0001; DON STEPHENS TRUCKING & CONSTRUCTION CO., 9526 Brittany Point Drive, Little Rock, AR 72206-1605, Contract No. W911RP-09-G-0002; CONVIARE INC., 23 Belle River Cir, Maumelle, AR 72113-7025; Contract No. W911RP-09-G-0003; PARAGRON INDUSTRIAL APPLICATIONS INC., dba PIA INC., 10012 West New Boston Road, Hooks, TX 75561-6593, Contract No. W911RP-09-G-0004; HENOCK CONSTRUCTION, LLC., 1882 S. Brazos, San Antonio, TX 78207-7006, Contract No. W911RP-09-G-0005. Summary of Work as follows: BASE BID: Removal and disposal of existing transite (asbestos) roof system and installation of new metal roof system including 24 gauge roof panels, roof insulation, rake & eave fascia, gutters & downspout, ridge vents, flashing, ridge caps, flashing, lightning protection system, and related items. Installation of two open framed canopies and three personnel door hanger rod supported canopies. Canopies also include relocation of electrical service that interferes with canopy work and installation of bollards. Replacement of overhead coiling door/frame/hardware including related electrical requirements for door motor/operator. All exterior concrete and earthwork including drainage control. ADDITIVE 0001: All exterior painting and window replacement and related work. Remove and replacement of exhaust fans within Compressor Room. ADDITIVE 0002: Personnel doors/frames/hardware replacement (two each) including related masonry work. and ADDITIVE 0003: All other work specified including but not limited to new interior finishes (refer to FINISH SCHEDULE on PBA Drawing A1), cabinetry, range with vent hood, kitchen sink, wainscot, interior painting, water heater room repairs, grille & diffuser replacement, etc. Electrical work includes interior light fixtures, switches, receptacles, and related electrical work. Subcontractors who have an interest in this requirement shall contact the prime contractors listed above.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/f2f880fd52dc6cac5e5c8b27f1d4236a)
 
Place of Performance
Address: RDECOM Contracting Center - Pine Bluff (RDECOM-CC) ATTN: CCRD-PB, 10020 Kabrich Circle Pine Bluff AR
Zip Code: 71602-9500
 
Record
SN02017833-W 20091209/091207234229-f2f880fd52dc6cac5e5c8b27f1d4236a (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.