Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF DECEMBER 09, 2009 FBO #2937
MODIFICATION

56 -- RECOVERY-REPLACEMENT OF HVAC EQUIPMENT

Notice Date
12/7/2009
 
Notice Type
Modification/Amendment
 
Contracting Office
NER - Acquisition Philadelphia Office National Park Service200 Chestnut Street, 3rd Floor Philadelphia PA 19106
 
ZIP Code
19106
 
Solicitation Number
I1760090003
 
Response Due
12/7/2009
 
Archive Date
12/7/2010
 
Point of Contact
Diemhong Walters Contract Specialist 2155974623 Diemhong_walters@nps.gov;
 
E-Mail Address
Point of Contact above, or if none listed, contact the IDEAS EC HELP DESK for assistance
(EC_helpdesk@NBC.GOV)
 
Small Business Set-Aside
Competitive 8(a)
 
Description
This Amendment 2 under I1760090003 is to sysnopsis a Replacement of HVAC Equipment project for Fort Stanwix National Monument-Rome-New York under National Park Service-US Department of the Interior. This project is RECOVERY and NAICS is 238220. The work of this contract consists of the replacement and modifications to the existing HVAC equipment and systems at Fort and Maintenance Shop located at Fort Stanwix National Monument. Contractor will be required to provide all labor, supplies, equipment, tools, materials, all supplementary or miscellaneous items, appurtenances and devices incidental to or necessary to perform work. GENERAL REQUIREMENT A. FORT 1.Disconnect and remove existing Split System, Cooling only 3 (three) Air Handling Units and 2 (two) associated Condensers, refrigerant piping, and all appurtenances. Furnish and install 3 (three) new high efficiency Split System (Cooling only) Air Handling units and 2 (two) associated condensers, refrigerant piping, and all appurtenances, disconnects, controls, wiring, and miscellaneous items necessary for complete and operational HVAC Systems in place of the removed ones. 2.Reclaim and dispose of used refrigerant as required by applicable laws and regulations. B. MAINTENANCE SHOP 1.Furnish and install new ductless Split Type, Tri-Zone (3 Indoor Units/1 Outdoor Unit) 27,000 BTUH total capacity Heat Pump System complete with refrigerant piping and all components and accessories. Outdoor Unit shall be located in wooden shed on the Office side of Maintenance Shop. Furnish and install three (3) new ceiling-mounted high efficiency gas-fired unit heaters including all appurtenances. 2.Disconnect and remove three (3) existing ceiling-mounted gas-fired unit heaters including all related accessories. 3.Restore heating system to fully functional working order. C. PERIOD OF PERFORMANCE Contractor will be required to complete all work within ninety (90) calendar days after receipt of notice to proceed. D. DEMOLITION 1. Disposal of removed equipment and materials shall be the Contractor's responsibility. E. Magnitude of this project is between $25,000 to $100,000.00. F. This procurement is 8(a) set aside competition. Should you have any questions concerning about this project, feel free to submit your questions to Diemhong_Walters@nps.gov.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/NPS/APC-IS/I1760090003/listing.html)
 
Place of Performance
Address: FORT STANWIX NATIONAL MONUMENT-ROME-NEW YORK
Zip Code: 13440
 
Record
SN02018024-W 20091209/091207234504-5d2d7490cadcea8e3a76bfa5503a3d8b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.