AWARD
Y -- RECOVERY-Y-PROJECT CODE 4230, Upgrade of 50 year old recreation facilities for the health and safety of visitors. Upgrades include repairs to wastewater plant tanks, replacement leach field, and relocation of wastewater lift station, Coyote Valley Dam, CA
- Notice Date
- 12/10/2009
- Notice Type
- Award Notice
- NAICS
- 237110
— Water and Sewer Line and Related Structures Construction
- Contracting Office
- Department of the Army, U.S. Army Corps of Engineers, USACE District, San Francisco, ATTN: CESPN-CT, 1455 MARKET STREET, San Francisco, California, 94103-1399, United States
- ZIP Code
- 94103-1399
- Solicitation Number
- W912P7-09-R-0025
- Point of Contact
- James E Hallman, Phone: 4155036974
- E-Mail Address
-
james.e.hallman@usace.army.mil
(james.e.hallman@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912P7-10-C-0002
- Award Date
- 12/9/2009
- Awardee
- Newland Entities, Inc. (052373714), 3818 Railroad Ave Ste B, Yuba City, California 95991-9724, United States
- Award Amount
- $548,231.00
- Description
- Proposed work for this project consists of furnishing all labor, materials and equipment to perform the services required for the construction and implementation of the project. This means removal of vegetation and other obstructions where necessary to excavate and/or bring in equipment. The contractor shall perform any construction and installation in relation to the proposed lift station as shown in the report to the full completion and satisfaction of the system requirements. Clean up should consist of replacing all vegetation and structures moved for the purpose of the construction work performed. The government shall not provide assistance for any of the work performed. This Lift-Station construction project shall be completed as shown on Design Drawings (AutoCAD 07 or 10, D-size) contained in Appendix C: "MENDO SS PUMP STA V4R12 (Sheet 1)"; "MENDO SS PUMP STA V4R14 (Sheet 2)" and "MENDO SS PUMP STA V4R16 (Sheet 3)." In the event of a conflict between the Drawings and Specifications, the Drawings shall govern. Major project features include: a) New 10-foot inside diameter (I.D.) Main Lift-Station with 2 each, 40-horsepower chopper pumps, 480-VAC power supply, and pertinent Controls. Two x 200 lineal feet of trenching for installation of power and water supply. b) 250 lineal feet of trenching for Main Lift-Station tie-in to effluent supply line at existing manhole. c) 1,700 lineal feet of trenching for installation of new 8" HDPE pressurized effluent pipe, from Main Lift-Station to existing wastewater treatment plant. d) Submersible Pumps, 2 each, 2 Hp, in existing manhole, with 4" HDPE pipe, 325 ft to Main Lift-Station, for existing Pomo "C" Comfort Station. 75 lineal feet of trenching for tie-in to power at Comfort Station.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACAW07/Awards/W912P7-10-C-0002.html)
- Record
- SN02020699-W 20091212/091210234503-708d7a42732f706df1c2828015965a28 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |