MODIFICATION
Y -- RECOVERY ACT: Beaver Pond Dam Design/Build on the White Mountain National Forest. Grafton County, New Hampshire
- Notice Date
- 12/15/2009
- Notice Type
- Modification/Amendment
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- Department of Agriculture, Forest Service, Eroc East, 1720 Peachtree Road NW, Atlanta, Georgia, 30309, United States
- ZIP Code
- 30309
- Solicitation Number
- AG-4419-S-10-0073
- Response Due
- 12/22/2009 5:00:00 PM
- Archive Date
- 1/29/2010
- Point of Contact
- Bruce M. Blackburn, Phone: 4142973800, Angela L Mitchell, Phone: 2709242096
- E-Mail Address
-
bmblackburn@fs.fed.us, almitchell@fs.fed.us
(bmblackburn@fs.fed.us, almitchell@fs.fed.us)
- Small Business Set-Aside
- N/A
- Description
- 1) Was the site visit mandatory? We did not attend but our engineering partner firm did attend. The site visit was not mandatory. 2) Does the 20 page limit for the technical proposal included resumes, schedule, organization chart and QC Plan, or are those items considered attachments to the proposal and not part of the 20-page limit? The 20-page limit includes all of these items. 3) Do you require a separately bound pirce and technical proposal? The price and technical do not need to be separated, but it would be a convenience to us if you do.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/notices/da5eb36ab607c165b9328db88b715cfd)
- Place of Performance
- Address: WHITE MOUNTAIN NATIONAL FOREST, GRAFTON COUNTY, NEW HAMPSHIRE, United States
- Record
- SN02024655-W 20091217/091215235403-da5eb36ab607c165b9328db88b715cfd (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |