Y -- RECOVERY--Y--PROJECT NUMBER 22371, Rpr Components of Electrical Substation - Bd 1888 (DPW), PROJECT NUMBER 22554, Repair/Replace Components Feeders 6&7 (DPW), PROJECT NUMBER 22559, Repair/Replace Electrical Distribution System Feeders, (See Desc)

Notice Date
12/17/2009
 
Notice Type
Special Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
US Army Engineer District, Tulsa, ATTN: CESWT-CT, 1645 South 101st East Avenue, Tulsa, OK 74128-4609
 
ZIP Code
74128-4609
 
Solicitation Number
W9126G-06-R-0041-SWT01
 
Archive Date
3/17/2010
 
Point of Contact
tinacox, 9186697088
 
E-Mail Address
US Army Engineer District, Tulsa
(tina.cox@us.army.mil)
 
Small Business Set-Aside
N/A
 
Description
(Subject Continued) West Range, PROJECT NUMBER 30180, Replace 2 Each Back-Up Generators, Electrical Distribution System (DPW) RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO THOSE CONTRACTORS UNDER THE CURRENT CONRACT NUMBERS: MCC CONSTRUCTION CORPORATION, CONTRACT NUMBER W9126G-06-D-0041, SHAW ENVIRONMENTAL AND INFRASTRUCTURE, CONTRACT NUMBER W9126G-06-D-0042 AND THE ROSS GROUP, CONTRACT NUMBER W9126G-06-D-0043. THIS SUBJECT TASK ORDER IS FOR ELECTRICAL WORK AT MULTIPLE LOCATIONS, FORT SILL, OKLAHOMA IN ACCORDANCE WITH NAICS 263220. THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (ARRA) PROJECT - ELECTRICAL WORK AT MULTIPLE LOCATIONS AT FORT SILL IS A SINGLE PROJECT COMPRISED OF FOUR DIFFERENT ELECTRICAL PROJECTS LOCATED AT DIFFERENT LOCATIONS AT FORT SILL. THE DESCRIPTION AND PRINCIPAL ELEMENTS FOR EACH OF THE ELECTRICAL WORK ELEMENTS WITHIN IN THIS SINGLE CONTRACT INCLUDE: PROJECT NUMBER #1: ELECTRIC FEEDERS: REPAIR/REPLACE 6 & 7 GENERAL DESCRIPTION THE INTENT OF THIS PROJECT ELEMENT IS TO MODIFY THE FORT SILL ELECTRICAL DISTRIBUTION SYSTEMS FEEDERS 6 AND 7. THE OVERALL SCOPE IS TO REPLACE EXISTING WOOD POLES AND RESAGGING OF EXISTING ELECTRICAL CONDUCTORS. AREAS OF THE DISTRIBUTION SYSTEM WILL BE CONVERTED FROM OVERHEAD ELECTRIC TO UNDERGROUND ELECTRICAL. WORK PERFORMED SHALL BE AS DEFINED IN THE STATEMENT OF WORK 01 10 00 A - REPAIR AND REPLACE ELECTRIC FEEDERS 6 & 7. THE UNDERGROUND CONVERSION WORK WILL BE IN SCHEDULE 40 PVC ENCASED IN CONCRETE. MANHOLES WILL BE PROVIDED AS REQUIRED. WORK TO THIS ELEMENT COMPRISES SPECIALTY ELECTRICAL WORK AS REQUIRED FOR HIGH VOLTAGE AND OVERHEAD AND UNDERGROUND POWER DISTRIBUTION ELECTRICAL WORK. THE ELECTRICAL CONTRACTOR THAT PERFORMS THIS WORK SHALL BE EXPERIENCED IN THIS TYPE OF SPECIALIZED ELECTRICAL WORK. THE PRINCIPAL ELEMENTS OF THE PROJECT ARE: CONTRACTOR SHALL PROVIDE DESIGN, MATERIALS, EQUIPMENT, LABOR, AND MANAGEMENT TO PERFORM ALL THE REQUIRED WORK FOR THIS PROJECT. CONTRACTOR SHALL SUBMIT FOR APPROVAL A CONSTRUCTION SCHEDULE AND WORK PLAN. 1.PERFORM REQUIRED SITE VISIT(S) TO DETERMINE ACTUAL REQUIREMENTS FOR THE OVERHEAD AND UNDERGROUND CONVERSION WORK 2.REPLACE EXISTING WOOD ELECTRICAL POLES 3.CORRECT SAGGING CONDUCTORS 4.CONVERT ELECTRIC TO UNDERGROUND CONDUIT AND CONCRETE ENCASED DUCT BANKS 5.PROVIDE PAD MOUNTED SECTIONALIZED SWITCHES TO REPLACE EXISTING SECTIONALIZED SWITCHES 6.INSTALL GROUNDING SYSTEMS AND GROUND RODS 7.HIGH AND LOW VOLTAGE WORK 8.INSTALLATION OF HIGH POWER CONDUCTORS/REPLACEMENT 9.GUY ASSEMBLY WORK 10.FUSE WORK 11.BOOM TRUCK OPERATION WORK 12.WORK WITH POLE MOUNTED SURGE ARRESTERS 13.INSTALLATION OF ELECTRICAL RISERS 14.TREE TRIMMING 15.ELECTRICAL EQUIPMENT INSTALLATION 16.REESTABLISHMENT OF WORK AREAS AND GROUNDS 17.GENERAL PROJECT CLEANUP PROJECT NUMBER #2: ELECTRIC FEEDERS: WEST RANGE GENERAL DESCRIPTION THE INTENT OF THIS PROJECT ELEMENT IS TO MODIFY THE WEST RANGE ELECTRICAL DISTRIBUTION SYSTEM TO INCLUDE REPLACEMENT OF WOOD POLES, RELOCATION OF EXISTING AND INSTALLATION OF NEW POLE MOUNTED TRANSFORMERS. CONSTRUCTION OF NEW SECTIONS OF OVERHEAD DISTRIBUTION AT THE WEST RANGE. WORK TO BE PERFORMED AT THE WEST RANGE ARE IN THE VICINITIES OF THOMPSON HILL, ANTENNA HILL, AND LETRA. WORK PERFORMED SHALL BE AS DEFINED IN THE STATEMENT OF WORK 01 10 00 B - ELECTRIC FEEDERS: WEST RANGE. WORK TO THIS ELEMENT COMPRISES SPECIALTY ELECTRICAL WORK AS REQUIRED FOR HIGH VOLTAGE AND OVERHEAD AND UNDERGROUND POWER DISTRIBUTION ELECTRICAL WORK. THE ELECTRICAL CONTRACTOR THAT PERFORMS THIS WORK SHALL BE EXPERIENCED IN THIS TYPE OF SPECIALIZED ELECTRICAL WORK. THE PRINCIPAL NUMBER OF THE PROJECT ARE: CONTRACTOR SHALL PROVIDE DESIGN, MATERIALS, EQUIPMENT, LABOR, AND MANAGEMENT TO PERFORM ALL THE REQUIRED WORK FOR THIS PROJECT. CONTRACTOR SHALL SUBMIT FOR APPROVAL A CONSTRUCTION SCHEDULE AND WORK PLAN. 1.PERFORM REQUIRED SITE VISIT(S) TO DETERMINE ACTUAL REQUIREMENTS FOR THE OVERHEAD AND UNDERGROUND CONVERSION WORK 2.REPLACE EXISTING WOOD ELECTRICAL POLES 3.CHANGE POLE CONFIGURATIONS 4.CORRECT SAGGING CONDUCTORS 5.DISCONNECT SWITCHES 6.TRANSFORMER WORK 7.ELECTRIC POLE HARDWARE AND EQUIPMENT WORK 8.NEW DISTRIBUTION AND CONDUCTOR LINES. 9.TREE TRIMMING 10.INSTALL GROUNDING SYSTEMS AND GROUND RODS 11.HIGH AND LOW VOLTAGE WORK 12.INSTALLATION OF HIGH POWER CONDUCTORS/REPLACEMENT 13.GUY ASSEMBLY WORK 14.FUSE WORK 15.BOOM TRUCK OPERATION WORK 16.WORK WITH POLE MOUNTED SURGE ARRESTERS 17.INSTALLATION OF ELECTRICAL RISERS 18.ELECTRICAL EQUIPMENT INSTALLATION 19.REESTABLISHMENT OF WORK AREAS AND GROUNDS 20.GENERAL PROJECT CLEANUP PROJECT NUMBER #3: REPAIR COMPONENTS; ELEC. SUBSTATION AT BLDG 1888 GENERAL DESCRIPTION THE INTENT OF THIS PROJECT ELEMENT IS TO UPGRADE THE FORT SILL ELECTRICAL DISTRIBUTION SYSTEM SUBSTATION (REAL PROPERTY FACILITY NO. 1888) LOCATED NEAR THE INTERSECTION OF SHERIDAN ROAD AND CRAIG ROAD (HEREIN AFTER REFERRED TO AS THE NORTH SUBSTATION). ELECTRICAL WORK SHALL BE PERFORMED WITH MINIMUM OR NO POWER OUTAGES. CONTRACTOR SHALL REPLACE 8 EXISTING 1200A VACUUM CIRCUIT BREAKERS THAT SERVE AS FEEDER BREAKERS AND PERFORM OTHER ELECTRICAL WORK DEFINED IN THE STATEMENT OF WORK 01 10 00 C - BLDG 1888 ELECTRICAL SUBSTATION UPGRADE TO PROVIDED A FULLY FUNCTIONAL UPGRADED ELECTRICAL SUBSTATION THAT MEETS CURRENT AND DEFINED CODES AND REQUIREMENTS. WORK TO THIS ELEMENT COMPRISES SPECIALTY ELECTRICAL WORK AS REQUIRED FOR SUBSTATIONS, HIGH VOLTAGE WORK, CONTROL WIRING, AND SPECIALIZED RELAY AND SWITCH WORK. THE ELECTRICAL CONTRACTOR THAT PERFORMS THIS WORK SHALL BE EXPERIENCED IN THIS TYPE OF SPECIALIZED ELECTRICAL WORK THE PRINCIPAL ELEMENTS OF THE PROJECT ARE: CONTRACTOR SHALL PROVIDE DESIGN, MATERIALS, EQUIPMENT, LABOR, AND MANAGEMENT TO PERFORM ALL THE REQUIRED WORK FOR THIS PROJECT. CONTRACTOR SHALL SUBMIT FOR APPROVAL A CONSTRUCTION SCHEDULE AND WORK PLAN. 1.PERFORM REQUIRED SITE VISIT(S) TO DETERMINE ACTUAL REQUIREMENTS FOR THE ELECTRICAL SUBSTATION WORK 2.REPLACE 1200A VACUUM BREAKERS (VCB) WITH SIMILAR VCB TO SOUTH SUBSTATION 3.MODIFY CONCRETE EQUIPMENT PADS 4.REMOVE SPARE VCB'S 5.MODIFY EXISTING CHAIN LINK FENCE AND COORDINATE WITH PSO 6.MODIFY EXISTING OVERHEAD BUS 7.PERFORM TIE BREAKER W 8.PROVIDE NEW OVERHEAD DISCONNECT SWITCHES 9.DESIGN FOR AND PROVIDE NEW CONTROL CIRCUITS 10.RELOCATE ELECTRICAL RELAYS 11.PROVIDE NEW DATA ACQUISITION SYSTEM FOR MONITORING 12.PROVIDE NEW ELECTRICAL PTS, CTS, SURGE ARRESTORS, AND STATION SERVICE TRANSFORMERS 13.CLEAN AND SERVICE EXISTING OVERHEAD SWITCHES 14.REPLACE EXISTING SUBSTATION BACKUP POWER SYSTEM 15.INSPECTION, TESTING, CALIBRATION, AND ADJUSTMENT OF ELECTRICAL SYSTEM AND EQUIPMENT 16.REPAIR CRACKS IN THE CONTROL BUILDING WALLS AND LEAKS IN THE CONTROL BUILDING ROOF. 17.PAINT THE CONTROL BUILDING 18.MASONRY CMU WORK AS REQUIRED (OPTION 4) 19.GENERAL PROJECT CLEANUP PROJECT NUMBER #4: REPLACE BACKUP GENERATORS IN ELEC. DISTRIBUTION SYSTEM GENERAL DESCRIPTION THE INTENT OF THIS PROJECT ELEMENT IS TO REPLACE AN EXISTING GENERATOR, INSTALL NEW GENERATORS, REPLACE EXISTING AUTOMATIC TRANSFER SWITCHES (ATSS), AND INTERCONNECT THE NEW AND EXISTING GENERATORS INTO AN EMERGENCY POWER GRID THAT IS ALSO TIED TO THE NORMAL POWER GRID. WORK TO BE PERFORMED IS DEFINED IN THE STATEMENT OF WORK 01 10 00 D - REPLACE BACKUP GENERATORS TO PROVIDE GENERATOR WORK IN VARIOUS BUILDINGS AS OUTLINED IN PROVIDED TABLE. WORK TO THIS ELEMENT COMPRISES SPECIALTY ELECTRICAL WORK AS REQUIRED FOR GENERATOR WORK. THE ELECTRICAL CONTRACTOR THAT PERFORMS THIS WORK SHALL BE EXPERIENCED IN THIS TYPE OF SPECIALIZED ELECTRICAL WORK THE PRINCIPAL ELEMENTS OF THE PROJECT ARE: CONTRACTOR SHALL PROVIDE DESIGN, MATERIALS, EQUIPMENT, LABOR, AND MANAGEMENT TO PERFORM ALL THE REQUIRED WORK FOR THIS PROJECT. CONTRACTOR SHALL SUBMIT FOR APPROVAL A CONSTRUCTION SCHEDULE AND WORK PLAN. 1.PERFORM REQUIRED SITE VISIT(S) TO DETERMINE ACTUAL REQUIREMENTS FOR THE ELECTRICAL SUBSTATION WORK 2.NATURAL AND DIESEL GENERATORS WORK 3.PIPE FITTING AND GAS WORK 4.STANDARD EQUIPMENT WORK AND RIGGING FOR GENERATORS 5.PROVISION OF TRAILER MOUNTED GENERATORS 6.HARDWARE, FIRMWARE, AND SOFTWARE WORK TO CONTROL GENERATORS 7.ALL ELECTRICAL TIE-IN WORK AS REQUIRED. 8.GENERAL PROJECT CLEANUP THE NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE IS 236220. THE SMALL BUSINESS SIZE STANDARD IS $33.5 MILLION. THE CONTRACT SPECIALIST FOR THIS ACTION WILL BE TINA COX, (918)669-7045, E-MAIL TINA.A.COX@USACE.ARMY.MIL.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA56/W9126G-06-R-0041-SWT01/listing.html)
 
Record
SN02026314-W 20091219/091217234749-7be3812c81671f8c0e14f50f057becb3 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.