Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF DECEMBER 19, 2009 FBO #2947
SPECIAL NOTICE

Y -- RECOVERY--Y--PROJECT NUMBER 14793, Replace HVAC controls; connect bldg 4584 to Utility Management Control System (UMCS), PROJECT NUMBER 14794, Connect bldg 1377 to Utility Management Control System (UMCS), PROJECT NUMBER 22353, Repair Heat (See Desc)

Notice Date
12/17/2009
 
Notice Type
Special Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
US Army Engineer District, Fort Worth, PO Box 17300/819 Taylor Street, Fort Worth, TX 76102-0300
 
ZIP Code
76102-0300
 
Solicitation Number
W9126G-10-R-0046
 
Archive Date
3/17/2010
 
Point of Contact
Barbara Jean Walker, 817-886-1161
 
E-Mail Address
US Army Engineer District, Fort Worth
(barbara.j.walker@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
(Subject Continued) Distribution Lines, Bldg 2248, PROJECT NUMBER 38959, Repair Water System Controls Repair Water Systems Controls, Connect Bldg 1377 to Utility Management Control Systems (UMCS), Repair Heat Distribution Lines, Bldg 2248, Replace HVAC controls; connect bldg 4584 to UMCS, Ft Sam Houston, TX THIS NOTICE IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO 8(a) CONTRACTOR JAMCO VENTURES, LLC This contract action will be accomplished using Other Than Full and Open Competition under the authority of FAR 6.302-5(b)(4). Sole source awards under the 8(a) Program 15 U.S.C. 637 and the Partnership Agreement dated 28 February 2007 between the U.S. Small Business Administration (SBA) and the Department of Defense (DOD). The work to be performed is the Utility Monitoring & Control System (UMCS) Phase IV project for replacement of existing building Energy Monitoring and Control System (EMCS) with Fort Sam Houston (FSH) Industrial Grade Direct Digital Control System (IGDDCS) for full integration into existing Postwide UMCS & Front End Upgrade to include Screen Building for 28 existing Building EMCS to be incorporated into the existing UMCS. For Building 2225 the project will provide a new building EMCS. The system shall be the FSH IGDDCS to include all programming and commissioning. Building 2248 will have the Heat Distribution line required due to old equipment and will be incorporated into the existing UMCS. The Water System Controls portion of the project will provide Chlorine Feed Equipment in multiple buildings, a Supervised Control and Data Acquisition (SCADA) monitoring system, replacement of faulty components in the system, and testing of the system. Points of Contact: Contracting - Ms. Barbara J. Walker (817)886-1161
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA63/W9126G-10-R-0046/listing.html)
 
Record
SN02026543-W 20091219/091217235027-54541db60fe3ff6a42be1a400c20423f (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.