Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF DECEMBER 19, 2009 FBO #2947
AWARD

M -- RECOVERY--M--PROJECT NUMBER 220, Allatoona Lake, GA Increase Costs associted with Upgrading Selected Campsites to 50 AMP Electrical Service, Operation and Maintenance of Government-Owned Facilities and Equipment, Allatoona Lake, Cartersville, Georgia

Notice Date
12/17/2009
 
Notice Type
Award Notice
 
NAICS
561210 — Facilities Support Services
 
Contracting Office
US Army Engineer District, Mobile, P. O. Box 2288, 109 Saint Joseph Street (zip 36602), Mobile, AL 36628-0001
 
ZIP Code
36628-0001
 
Solicitation Number
W91278-10-051-ARRA
 
Archive Date
2/25/2010
 
Point of Contact
Helene Mitchell, 2514416531
 
E-Mail Address
US Army Engineer District, Mobile
(helene.s.mitchell@sam.usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W91278-08-C-0013 P00020
 
Award Date
12/17/2009
 
Awardee
R & D MAINTENANCE SERVICES, INC (037982410)<br> 409 N MAIN ST<br> HENNESSEY, OK 73742-1017
 
Award Amount
$87,855.96
 
Line Number
0006
 
Description
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): R&D Maintenance Services, Inc., W91278-08-C-0013 This contract action was not awarded as a fixed price type because uncertainties involved in contract performance did not permit costs to be estimated with sufficient accuracy to use any type of fixed price contract. As such, a cost-reimbursement type action was awarded (FAR 16.301-2). Furthermore, the existing contract must be used for the following reasons: 1) The contractor is already in the midst of the job and this modification is to add funding needed to complete the job as a result of unforeseen site conditions. 2) A detailed scope of work can not be prepared. The extent of the work and the resources needed can not be fully determined prior to starting the work, because conditions are different at each individual site. 3) The contractor is responsible for the complete inspection, maintenance, and repair of all project buildings and structures in the Allatoona recreation area. 4) The scheduling, coordination, quality assurance, and/or subcontracting for the work to be performed are within the scope of the original contract technical provisions and must be accomplished under the terms of the existing contract. The incumbent contractor not only has the management, technical, and administrative skills to efficiently accomplish this work at a reasonable cost, but also the advantage of the flexibility to readily adjust to any unforeseen obstacles encountered during installation. 5) This contract enables repairs to begin immediately after and during inspections without a detailed scope of work and thus minimizes the time the facilities are closed and the impact on public assess to camping and recreation during the busiest season of the year.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA01/W91278-10-051-ARRA/listing.html)
 
Record
SN02026813-W 20091219/091217235318-9fcab3b69386b036c2bd2e5073964aae (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.