AWARD

Z -- RECOVERY--Z--PROJECT NUMBER 107887 The work consists of subaqueous removal of material within the harbor footprint and the subsequent placement of the reclaimed material at a designated location along the main channel of the Mississippi River.

Notice Date
1/29/2010
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
US Army Corps of Engineers, Memphis District, 167 North Main Street, Rm B202, Memphis, TN 38103-1894
 
ZIP Code
38103-1894
 
Solicitation Number
W912EQ-10-B0003
 
Response Due
1/19/2010
 
Archive Date
2/28/2010
 
Point of Contact
PRISCILLA G SWEENEY, 901/544-0770
 
E-Mail Address
US Army Corps of Engineers, Memphis District
(priscilla.g.sweeney@us.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912EQ-10-C-0004
 
Award Date
1/28/2010
 
Awardee
CHOCTAW TRANSPORTATION COMPANY, INC. (007771728)<br> 1311 E COURT ST<br> DYERSBURG, TN 38024-4810
 
Award Amount
$446,250.00
 
Line Number
2
 
Description
This work will be performed in the Mississippi River at Mile 899 on the left descending bank in the Northwest Tennessee Harbor just north of Tiptonville, TN. The work consists of subaqueous removal of material within the harbor footprint and the subsequent placement of the reclaimed material at a designated location along the main channel of the Mississippi River. The material will consist of revetment remnants (approximately 6 inches thick) and surrounding sediments. The removal area is approximately 1300 feet long, extends up to 41 feet below the water surface when the New Madrid gage is a 28, and conforms to the designed slope and grade provided on the plans. The estimated quantity of material to be removed is 21,000 cubic yards. Work shall be accomplished by floating plant using a hydraulic excavator with digging depth of 50 feet and a minimum 5 cubic yard bucket. All material shall be loaded onto a barge, transported to the designated site, and placed as reinforcement for an existing trail dike. All work shall be performed as soon as the New Madrid gage is 28 feet or less. The contractor shall perform and provide hydrographic surveys as necessary to insure proper grade and section in the removal area. The contractor shall mobilize within 10 days and complete all work within 30 days from notice to proceed subject to the 28 foot river stage limitation on the New Madrid Gage.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA66/W912EQ-10-B0003/listing.html)
 
Record
SN02053041-W 20100131/100129235207-1e693654eed47dc81bbab0b6fedb093c (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.