C -- RECOVERY--C--118339 APPROACH WALLS CHICKAMAUGA LOCK AND DAM MODIFICATION TO EXISTING DELIVERY ORDER.

Notice Date
2/2/2010
 
Notice Type
Special Notice
 
NAICS
541330 — Engineering Services
 
Contracting Office
USA Engineer District, Nashville, P.O. Box 1070, 801 Broad Street, Nashville, TN 37202-1070
 
ZIP Code
37202-1070
 
Solicitation Number
W912P5-08-D-0005
 
Archive Date
5/3/2010
 
Point of Contact
James Choate, 615-736-7946
 
E-Mail Address
USA Engineer District, Nashville
(James.E.Choate@LRN02.usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
SCOPE OF SERVICES FOR MODIFICATION TO TASK ORDER NO. 5 ARCHITECT-ENGINEERING SERVICES FOR APPROACH WALL PLANS AND SPECIFICATIONS UPDATES CHICKAMAUGA LOCK REPLACEMENT PROJECT CHATTANOOGA, TENNESSEE I.REFERENCES. A. This modification will be issued for Task Order No. 5 under IDC W912P5-08-D-0005. B. Original Scope of Services for Task Order No. 5, awarded 23 September 2009 under IDC W912P5-08-D-0005. II. GENERAL A.The general requirements of the original Scope of Services (dated September 10, 2009) shall still apply. B.The following additional requirements are for performing additional design on the approach wall skirts to allow connection to an existing dam pier as well as conducting additional consolidation drawing and specification revisions to finalize the Chickamauga Consolidation Package. III. ADDITIONAL REQUIREMENTS A.Drawing and Specification Revisions The quantity of drawing and specification revisions on the installation of the Miter Gates and Approach Walls has exceeded the assumptions set forth in the original scope of services. This situation will require additional A/E professional time to complete and document the plans and specifications. B.Additional Skirt Detailing The A/E shall accurately detail the location of two skirts on the upstream approach walls as directed by the Nashville District to prevent flow vortices from occurring during filling and emptying operations. Additionally the A/E shall provide a design adequate to support a skirt spanning between the upper guard wall and existing Dam Pier 5. The decision on the installation of this skirt will not be made until lock testing is conducted; however adequate detailing is needed to expedite a contractor modification if the need arises. IV. SUBMITTALS (Refer to applicable requirements in the original Scope of Services). V. COORDINATION OF WORK (Refer to applicable requirements in the original Scope of Services). VI. ADDITIONAL ASSUMPTIONS For purposes of this task order modification for additional engineering services, it is assumed that in addition to the assumptions set forth in the original scope of services, the additional plans and specifications updates will constitute at least 220 hours of additional professional engineers time. The assumed additional engineering time includes 24 hours for a Senior Structural Engineer to attend the 95% Consolidation Review Workshop in Chicago, IL the week of February 1-5, 2010. VII. REVISED SCHEDULE Design support services will continue to be performed for the duration the consolidation effort. The consolidation effort is currently scheduled for completion in the spring 2010. Therefore the revised Period of Performance is established as 30 April 2010.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA62/W912P5-08-D-0005/listing.html)
 
Record
SN02056206-W 20100204/100203000018-47f65c17dfde1f73e4963f79872ac4bc (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.