MODIFICATION
38 -- Purchase of Hydrostatic Asphalt Road Chip Spreader, Yellowstone National Park.
- Notice Date
- 3/17/2010
- Notice Type
- Modification/Amendment
- Contracting Office
- IMR - YELL - Yellowstone National Park P. O. Box 168 Mammoth Hot Springs WY 82190
- ZIP Code
- 82190
- Solicitation Number
- N1574102562
- Response Due
- 3/22/2010
- Archive Date
- 3/17/2011
- Point of Contact
- Andy H. Fox Constracting Officer 3073442149 andy_fox@nps.gov;
- E-Mail Address
-
Point of Contact above, or if none listed, contact the IDEAS EC HELP DESK for assistance
(EC_helpdesk@NBC.GOV)
- Small Business Set-Aside
- N/A
- Description
- Combined Synopsis/Solicitation No. N1574102562Amendment 0001March 17, 2010 Project Title: Purchase of Hydrostatic Asphalt Road Chip Spreader, Yellowstone National Park. Receipt of Offers: The hour and date for receipt of offers is changed to 2:00 pm local time on March 22, 2010. Description of Changes: This amendment provides for some changes to the existing combined synopsis/solicitation by replacing option lines 1, 13, 14, 18 and 19 for Line Item One to read as follows:"1. Hydrostatic drive (variable speed forward and reverse) or an automatic transmission with shuttle valve shift.""13. All walkways must have safety railing throughout (minimum walkway required on drivers side and passenger side to allow visibility of front hopper area).""14. Hopper must be of a size and width to accommodate industry standard 15 yard dump trucks and must have a hydraulic hopper clean out system. (Hopper capacity must be a 4 yard minimum)""18. Chip spreader must be equipped with an emergency and/or service brake.""19. The chip spreader must be equipped with a computer rate control to measure chip spread rate, and control gate operations to maintain pre-set LBS/Square Yard. Computer or manual controlled chip belt speed is acceptable." Also, add option line numbers 25 and 26 to read as follows:"25. Chip spreader must have a DOT approved ROPS (roll over protection) system over the operator station.""26. Awarded Contractor must provide training on the operations and safety systems upon delivery of equipment." Also please change the Period of Performance to read as follows:"Period of Performance: The hydrostatic asphalt road chip spreader shall be delivered FOB to Mammoth Hot Springs, WY no later than June 15, 2010." Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:a)Signing and dating this amendment and returning with offer;b)By acknowledging receipt of this amendment on each copy of the offer submitted; orc)By separate letter or telegram which includes a reference to the solicitation and amendment numbers.FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.If by virtue of the amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. Third Party: If you have given a copy of this Solicitation to someone else, please forward this amendment accordingly.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/NPS/APC-IS/N1574102562/listing.html)
- Place of Performance
- Address: Yellowstone National Park, WY.
- Zip Code: 82190
- Zip Code: 82190
- Record
- SN02094514-W 20100319/100317234505-bdd825e6fe48fbcb6f0463446d884a9d (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |