SPECIAL NOTICE
R -- RECOVERY--R--PROJECT NUMBER 8450, Jim Woodruff Lock and Dam, Lake Seminole, FL, AL & GA Sedimentation and Erosion Analysis Report
- Notice Date
- 3/17/2010
- Notice Type
- Special Notice
- NAICS
- 541990
— All Other Professional, Scientific, and Technical Services
- Contracting Office
- USACE District, Mobile, P. O. Box 2288, 109 Saint Joseph Street (zip 36602), Mobile, AL 36628-0001
- ZIP Code
- 36628-0001
- Solicitation Number
- W91278-10-161-ARRA
- Archive Date
- 6/15/2010
- Point of Contact
- Alisa C. Murray, (251) 441-5578
- E-Mail Address
-
USACE District, Mobile
(alisa.c.murray@usace.army.mil)
- Small Business Set-Aside
- N/A
- Description
- RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Bowhead Science and Technology, LLC, W91278-10-D-0001, Scientific & Technology Support for Mobile District Using recovery Act funding, the Mobile District Corps of Engineers intends to issue a Task Order against Contract number W91278-10-D-0001, a Sole Sourced 8(a) awarded as a Fixed Price Indefinite Delivery Indefinite Quantity Contract for Scientific and Technology Support for the Mobile District Corps of Engineers awarded to Bowhead Science and Technology, LLC, 7851 Dolleys Court, King George, VA 22485. North American Industry Classification System (NAICS) code 541990 applies to this contract award. DESCRIPTION OF WORK: This effort is in support of a Sedimentation Survey Analysis for USACE Mobile District projects. The contractor will process hydrographic and lidar data along with aerial photography in support of efforts to perform a sedimentation and erosion analysis for Jim Woodruff Lock and Dam. The existing contract must be used for the following reason: 1) The work to be performed is within scope of the original contract. 2) The incumbent contract has the management, technical and administrative skills to efficiently and effectively accomplish this work. 3) This contract enables the work to begin immediately. Contract clauses required for project involving Recovery Act funds have been incorporated into the existing contract. The American Recovery and Reinvestment Act (ARRA) contain specific acquisition requirements that must be met when using Recovery Act funds, including compliance with the Federal Acquisition Regulation.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA01/W91278-10-161-ARRA/listing.html)
- Record
- SN02094809-W 20100319/100317234812-d774a9c91b9b360100c407cbd84c6329 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |