AWARD
Z -- RECOVERY--Z--PROJECT NUMBER 29225, Replace Windows/Repair Insulation, Exterior Fatade, and Vapor Barrier, VOLAR Barracks, Building 2109, PROJECT NUMBER 35588, Replace Windows/Repair, Insulation, Exterior Fatade and Vapor Barrier, VOLAR (See Desc)
- Notice Date
- 3/22/2010
- Notice Type
- Award Notice
- NAICS
- 236210
— Industrial Building Construction
- Contracting Office
- Fort Belvoir DOC, Directorate of Contracting, 9410 Jackson Loop, Suite 101, Fort Belvoir, VA 22060-5116
- ZIP Code
- 22060-5116
- Solicitation Number
- W91QV109R0042
- Archive Date
- 4/21/2010
- Point of Contact
- Maria Belino-Coffeen, 703-806-3869
- E-Mail Address
-
Fort Belvoir DOC
(maria.belinocoffeen@us.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W91QV1-10-C-0008-P00001
- Award Date
- 3/22/2010
- Awardee
- PONTIAC DRYWALL SYSTEMS INC. (808213370)<br> 53 1/2 W HURON STE STE 219<br> PONTIAC, MI 48342-2121
- Award Amount
- $2,183,000.00
- Line Number
- 0001 and 0002
- Description
- (Subject Continued) Barracks, Building 2111 ARRA #29225 Replace Windows/Repair Insulation, Exterior Facade & Vapor Barrier,BLDG 2109 - $ 1,139,000.00 - ARRA #35588 Replace Windows/Repair Insulation, Exterior Facade & Vapor Barrier, BLDG 2111 - $1,044,000.00 The contractor shall provide all materials, labor, equipment, transportation, and services to design and build the replacement of windows and exterior walls at buildings 2109 and 2111, Fort Belvoir, Virginia. The work shall include, but not limit to, the following: 1.Replace all windows in the building to include the living units, hallways, dayrooms, laundry room and electrical room. New windows must meet the attached specification section 08 51 13 and force protection standard UFC 4-010-01 dated 8 October 2003. A copy of the standard can be found at http://www.wbdg.org/ccb/DOD/UFC/ufc_4_010_01.pdf. New windows should be Peerless Products Inc. to match existing or approved equal too. 2.Replace all exterior walls with new Exterior Insulation and Finish System (EIFS) meeting the attached specification section 07 24 00. Finishes must match existing or architecturally compatible with surrounding buildings which is brick. New EIFS should be Dryvit or approved equal too. 3.For 2109: Install new rubber treads with non-slip strips and raised radial disk on all stair steps and landings. For 2111: Epoxy painting and install new rubber treads with non-slip strips and raised radial disk on all stair steps and landings 4.All works must be done while the building is occupied. Minimize inconveniences to the occupants by phasing the work and/or provide appropriate protection, separation and/or shielding of work site.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/notices/e859d7665662ba7f835e0ce0b4a2e037)
- Record
- SN02099145-W 20100324/100322234750-e859d7665662ba7f835e0ce0b4a2e037 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |