SOLICITATION NOTICE
Y -- RECOVERY Harris River Restoration Phase 3
- Notice Date
- 3/23/2010
- Notice Type
- Presolicitation
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- Department of Agriculture, Forest Service, EROC Northwest, 16400 Champion Way, Sandy, Oregon, 97055, United States
- ZIP Code
- 97055
- Solicitation Number
- AG-0489-S-10-0427
- Point of Contact
- Tonya R Rymer, Phone: 503-668-1703, Jessica M. Wilson, Phone: 503-668-1707
- E-Mail Address
-
trymer@fs.fed.us, jessicawilson@fs.fed.us
(trymer@fs.fed.us, jessicawilson@fs.fed.us)
- Small Business Set-Aside
- HUBZone
- Description
- THIS IS AN AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) PROCUREMENT. The purpose of this announcement is to make notice that the Forest Service contemplates releasing a solicitation numbered AG-0489-S-10-0427 on or about April 6, 2010, for the RECOVERY Harris River Restoration Phase 3 project. If the solicitation is released, it will be released through this FedBizOpps website, and prospective bidders should visit this FedBizOpps website from time to time on or after April 6, 2010 to obtain a copy of the solicitation. This notice meets the requirements of FAR 5.201. However, the Forest Service reserves the right not to release a solicitation. PROJECT DESCRIPTION. Work includes furnishing all materials, equipment, and labor required to rehabilitate 3 miles of stream corridor and the adjoining floodplain. Work includes clearing, excavation, material (rock, logs, rootwads,etc) gathering, material haul, reconstruction of roads, construction of access roads, construction of log and rock structures, hauling, placement of borrow materials, dewatering, construction and placement of erosion control devices, construction of trail bridges, replacement of trail tread, surfacing roads and parking areas, supplying equipment rental with operator(s) and labor to perform the work. The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with the drawings, specifications, and provisions of the contract. The Government estimate is between $500,000 and $1,000,000 (Base and Option Items). PROJECT LOCATION. The Harris River Restoration Phase 3 project is located on the Craig Ranger District on Prince of Wales Island along the Hollis State Highway 924 and Hydaburg State Highway 913. The Hydaburg Highway 913 System terminus is located approximately 10 miles west of the City of Hollis on the Craig/Klawock/Hollis State Highway 924. PARTICIPATION. This project is a Total HUB-ZONE Business Set-Aside. All responsible sources may submit an offer which shall be considered. FOR MORE INFORMATION. The point of contact for this acquisition is Tonya Rymer, (503) 668-1703 (Fax 503-668-1621), U. S. Forest Service, EROC Northwest, 16400 Champion Way, Sandy, OR 97055. REGISTRATIONS. In order to receive any contract award, a vendor must be registered in the Central Contractor Registration (CCR) and Online Representations and Certifications Application (ORCA). To register a firm in the CCR system, visit http://www.bpn.gov or call 888.227.2423 or 269.961.5757. To register a firm in the ORCA system, visit http://www.bpn.gov. The USDA is an equal opportunity provider and employer.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/notices/ac8e485c937358aead1d3ccf32203ce7)
- Place of Performance
- Address: Tongass National Forest, Alaska, United States
- Record
- SN02099828-W 20100325/100323235341-ac8e485c937358aead1d3ccf32203ce7 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |