FBO#3044
Z - Maintenance, Repair or Alteration of Real Property
AWARDS - March 26, 2010
- 10181RC420 - 99999
RECOVERY - LITTLE WHITE SALMON/WILLARD NFH, ADULT FISH ELECTRO-ANESTHESIA SYSTEM FOR THE SPAWNING FACILITYAMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) PROJECT: 4151-R1QDTAS::14 1610::TASAWARDEE: SMITH-ROOT INC (DUNS: 027473040)
SMITH-ROOT, INC.,14014 NE SALMON CREEK AVE ,VANCOUVER WA 986861610
- N4008410P0806 - Y1,450,000
REPLACE EXISTING VENTILATION FAN AT BLDG 3826
NIKKAI CORPORATION
- W912CN10C0019 - $762,179.33
RECOVERY--Z--PROJECT NUMBER , OWS UPGRADE 21 21022:TAS -- B QUAD RENOVATIONS, PER FAR 5.7, NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY.
TMGE LLC (829149819)<br> 11303 INDUSTRIAL RD STE 212<br> MANASSAS, VA 20109-3961
- GS-08P-10-JA-C-0012(Group1)_GS-08P-10-JA-C-0036(Group3)_GS-08P-10-JA-C-0037(Group4) - Group 1: $2,821,805.35, Group 3: $1,031,342.24, Group 4: $1,538,831.16
RECOVERY-PLUMBING, HEATING, AND AIR-CONDITIONING
NM Industrial Services, LLC, 8890 Federal Blvd, Unit 58 D, Federal Heights, Colorado 80260-5838, United States
- GS-P-08-10-JB-0004 - $598,708.19
RECOVERY: DAVID SKAGGS RESEARCH CENTER CHILLER REBUILD PROJECT
Trane U.S. Inc. , 3600 Pammel Creek Rd., La Crosse, Wisconsin 54601-7511, United States
- GS09P09KSD0238GSP0910KL5011 - $1,206,877.00
RECOVERY - "ENERGY UPGRADES"
Gwinn Construction, Inc., 11860 Kemper Rd<br />, Ste B, Auburn, California 95603, United States
- GS-P-08-10-JB-5021 - $308,300
RECOVERY: FORT COLLINS FEDERAL BUILDING ECM CONSTRUCTION PROJECT
Roche Constructors, Inc. , 361 71st Ave, Greeley, Colorado 80634-9782, United States
- GS-P-08-JB-5025 - $1,816,992.35
RECOVERY: DAVID SKAGGS RESEARCH CENTER ECM CONSTRUCTION PROJECT
PCL Construction Services, Inc., 2000 Colorado Blvd. #2-500, Denver, Colorado 80222-7928, United States
- GS-P-08-10-JB-5025 - $1,232,277.00
RECOVERY: JC O'MAHONEY FEDERAL BUILDING ECM CONSTRUCTION
PCL Construction Services, Inc. , 2000 S Colorado Blvd. #2-500<br />, Denver, Colorado 80222-7928, United States
- NNJ09JA26CB - 624
RECOVERY - REPAIR OF BUILDING 9 SOUTH ROOF
SIA Construction, Inc., 1350 NASA Pkwy, Ste. 250, Houston, TX 77058
- R10PX6A125 - 21850
BOYSEN DAM GARAGE ROOF
BAIRCO CONSTRUCTION, INC.,213 E 3RD ST ,LOVELL WY 824312110
- VA263-RA-0930 - 492,316.00
RECOVERY Z--(AWARD)(RECOVERY ACT) UPDATE/RENOVATE INTERIOR FINISHES, BLDG. 1, PHASE 1
COVENANT CONSTRUCTION SERVICES;2202 WOLF WAY;WEST DES MOINES;IA;502654221
- AG-0489-C-10-0134 - $815,344.00
RECOVERY KMRD ROAD STORAGE SOUTH - BID ABSTRACT
S & S General Contractors, PO Box 1440, Sitka, Alaska 99835, United States
- FA8601-10-C-0028 - $39,000.00
RECOVERY--PROJECT NUMBER ZHTV080002A, PROVIDE SPRINKLER SYSTEM F/30163
DALMATIAN FIRE, INC. (DUNS 362930638), 5670 W 73rd St<br />, Indianapolis, Indiana 46278-1738, United States
- S10PC00196 - $57000
RANDY TAYLOR ROCKFALL (CONST) KY-10-007
ALPHA RECLAMATION CONTRACTING, INCC/O JAMES W. LESTER PLLCPIKEVILLEKY41501-9331US
- GSP0610GZ5009-Modification13 - $6,939,300.95
RECOVERY - BUILDING 110 RENOVATION - MODIFICATION 13
John Oke-Thomas + Associates, 1972 East Chestnut Expressway, Springfield, Missouri 65802, United States
- AG-82B1-C-10-0124 - $28,803.00
RECOVERY: LOST CREEK CULVERT REPLACEMENTS
Woodring Brothers, Kalispell, Montana 59901, United States
- VA241-C-0600 V650-C00278 - 1,820,088.00
RECOVERY Z--RECOVERY - CONVERT HIGH PRESSURE STEAM BOILERS TO LOW PRESSURE BOILERS, PHASE 2
BRICAN, INC.;155 STATE ST;SPRINGFIELD;MA;011031908
- AG-0281-C-10-0002 - $39,682.38
IDAHO PANHANDLE NF - CD'A NURSERY PAVING
Poe Asphalt Paving co., PO Box 449, Lewiston , Idaho 83501, United States
- AG-9702-C-10-0048 - $75,077.00
RECOVERY-VISTA GRANDE WATER TANK REPLACEMENT
JC Palomar Construction, 2627 S Main Street<br />, Santa Ana, California 92707, United States
- W912EK-10-C-0070 - $212,270.00
RECOVERY--Z--PROJECT NUMBER 185021, IA RVR, IA CITY, JOHNSON CO., IA
DELONG CONSTRUCTION, INC. (829061972)<br> 1320 N 8TH AVE<br> WASHINGTON, IA 52353-2751
- GS05P10SAC0002 - $37,700.00
OFFICE RECONFIGURATION, INTERNAL REVENUE SERVICE, LA CROSSE, WI
Peter Nelson and Son Inc, 1701 Miller St<br />, La Crosse, Wisconsin 54601, United States
- VA263-RA-0931 - 359,100.00
RECOVERY Z--(AWARD)(RECOVERY ACT) UPGRADE INTERIOR FINISHES, BLDG. 1, 3RD FLOOR
MDM CONSTRUCTION SUPPLY, LLC;2303 CHARLES STREET;ROCKFORD;IL;611041578
- GS-10P-08-LT-D-0123-GS-P-10-10-LT-5050 - $532,500
RECOVERY: ENERGY CONSERVATION UPGRADES PROJECT AT THE SEATTLE FEDERAL OFFICE BUILDING IN SEATTLE, WA – GSA, NORTHWEST/ARCTIC REGION
Cherokee General Corporation, 255 Depot Street, Suite A, Fairview, Oregon 97024, United States
- VA263-RA-0927 - 991,000.00
RECOVERY Z--(AWARD)(RECOVERY ACT) TUCKPOINTING, BLDG. 1, PHASE IV
JDM LLC;1701 W GOLF RD TOWER 3 STE L24;ROLLING MEADOWS;IL;600084227
- C1720100403 - 164767
COLD STORAGE VAULT RENOVATION PROJECT AWARD
EUGENE RICCIARDELLI INC,856 SALEM ST ,LYNNFIELD MA 019401529
- W91248-08-D-0001-0078 - $83,794.85
RECOVERY--Z--PROJECT NUMBER CJ-10003-8J-8, REPAIR CAMPBELL ARMY AIRFIELD PAVEMENT (PHASE I) - EXPANSION JOINT AT FREEDOM RAMP
Rogers Group, Inc. (DUNS 057913287)<BR>421 Great Circle Road<BR>Nashville, TN 37228-1495<BR>United States
| This Issue's Index | Today's FBO Daily Index Page |
Created on 25-Mar-2010 by Loren Data Corp. -- info@fbodaily.com