SOLICITATION NOTICE
R -- Financial Auditing Services
- Notice Date
- 3/25/2010
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 541211
— Offices of Certified Public Accountants
- Contracting Office
- U.S. Commission on Civil Rights, U.S. Commission on Civil Rights, U.S. Commission on Civil Rights, 624 Ninth Street, NW, Suite 550, Washington, District of Columbia, 20425
- ZIP Code
- 20425
- Solicitation Number
- CCR-10-0001
- Archive Date
- 5/27/2010
- Point of Contact
- Pamela A. Dunston, Phone: 202-376-8105, TinaLouise Martin, Phone: 202-376-8364
- E-Mail Address
-
pdunston@usccr.gov, tmartin@usccr.gov
(pdunston@usccr.gov, tmartin@usccr.gov)
- Small Business Set-Aside
- N/A
- Description
- Due to space limitations, the complete Solicitation is not posted here. The complete Solicitation may be requested via email to Pdunston@usccr.gov. Please reference the Solicitation Number, CCR-10-0001, in your email. This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. Solicitation CCR-10-0001 is not a small business set aside and will be awarded as a firm fixed-price contract. Scope of Work A. The Contractor shall be required to conduct a full scope financial audit of the U.S. Commission on Civil Rights' (the Commission) annual financial statement for the fiscal year ending September 30, 2010. The audit shall be performed in accordance with generally accepted government auditing standards (GAGAS), as specified in the most current version of the GAO's Government Auditing Standards (GAS), and additional audit requirements of the OMB. In conducting the audit, the methodology used shall be at a minimum, consistent with the most current version of the GAO/President's Council on Integrity and Efficiency (GAO/PCIE) Financial Audit Manual (FAM). Should there be any deviations from the methodology set forth in the FAM, the Contractor must provide documentation to the COTR on a timely basis, demonstrating how the Contractor's methodology satisfies the requirements of the FAM. The COTR shall be notified immediately of any significant deviations from the FAM. B. With respect to internal control, the Contractor shall obtain an understanding of the components of internal control and assess the level of control risk relevant to the assertions embodied in the classes of transactions, account balances, and disclosure components of the financial statements. The Contractor shall also obtain an understanding of the components of internal control relating to the existence and completeness assertions relevant to the performance measures included in Management's Discussion and Analysis (MD&A). With respect to MD&A, the Contractor shall assess whether the information and manner of its presentation in the MD&A of the Reporting Entity is materially consistent with the information in the principal statements. In performing this assessment, the Contractor shall consider this required supplementary information and shall follow the guidelines presented in the American Institute of Certified Public Accountants' (AICPA) AU Section 551, Codification of Statements on Auditing Standards, and shall perform the procedures described in the AICPA's AU Section 558, Codification of Statements on Auditing Standards. In addition, the Contractor shall obtain an understanding of the design of internal controls relating to the existence and completeness assertions over performance measures and determine whether they have been placed in operation, as required by OMB Bulletin 07-04, as amended, or the most current OMB audit guidance. With respect to Required Supplementary Stewardship Information (RSSI) and Required Supplementary Information (RSI), the Contractor shall assess whether the information and its presentation is materially consistent with the information in the principal statements. In performing this assessment the Contractor shall follow the guidelines presented in the AICPA's AU Section 551, Codification of Statements on Auditing Standards, and shall perform procedures consistent with AICPA's AU Section 558, Codification of Statements on Auditing Standards. With respect to Other Accompanying Information, the Contractor shall assess whether the information and its presentation is materially consistent with the information in the principal statements. In performing this assessment, the Contractor shall follow the guidelines presented in AICPA's AU Section 551, Codification of Statements on Auditing Standards, and shall perform procedures consistent with AICPA's AU Section 550, Codification of Statements on Auditing Standards. C. As part of the USCCR FY10 Financial Statement Audit, the Contractor shall perform procedures to assess the effectiveness of the information system control environment. The procedures will focus on evaluating the adequacy of information systems controls over the following GAO's Federal Information System Controls Audit Manual (FISCAM) general control areas: •· Entity-wide Security Program Planning and Management, •· Access Controls (including mainframe system logical security and data center physical security), •· Segregation of Duties (for data center management and operations), •· Application Software Development and Change Control, •· System Software Controls and Modification, and •· Service Continuity. This work will also be utilized by other USCCR personnel with respect to the Federal Information Security Management Act (FISMA) requirements. Thus, the information system control environment review performed shall be coordinated with the COTR to ensure the work is completed timely enough for other USCCR personnel to use in performing their audits. D. The Contractor shall review the consolidated interim, draft, and final financial statement packages for compliance with USCCR requirements. The Contractor shall document each review in the workpapers and notify the COTR of the results within seven (7) working days of the review. Notification shall be in writing, through e-mail, or by fax. E. Audit Documentation All audit documentation shall be prepared in accordance with GAS and contain the required elements prescribed by GAS. The contractor shall also consult the GAO/PCIE FAM for specific audit documentation contents. At a minimum, audit documentation should include a summary memorandum documenting the conclusions reached on each significant internal control cycle, account balance, lead schedule, phase of the audit, audit adjustments, and on the overall audit. Adequate indexing and cross referencing must exist. The contractor shall also ensure that audit documentation contains the audit completion checklist FAM 1003. The Commission shall have ongoing access to auditors and audit documentation at all times. USCCR will accept electronic work papers and adequately cross-referenced hard-copy files to meet this requirement. These documents shall become the property of USCCR and shall not be disclosed outside of USCCR, unless required by statute or regulation, without the prior consent. Audit documentation may also be subject to review by other Government auditors such as the GAO, therefore, the contractor shall make audit documentation available to the GAO or any other federal entity conducting a review or audit of USCCR. Based on the results of these reviews, the contractor may be required by the COTR to perform corrective action and/or additional work within the scope of the contract necessary to support its audit conclusions, if necessary. Audit documentation shall be retained and safeguarded for a minimum of 2 years by the Contractor at no additional cost. Written approval must be obtained from the Commission's Office of General Counsel prior to destruction of any audit documentation. It is imperative that the Contractors protect all audit documentation from unauthorized access. Only Contractor staff with a need to know shall have access to audit documentation. Deliverables The Contractor shall provide the following deliverables: (1) a staffing list; (2) a statement in accordance with the Conflict of Interest Statement; (3) a Detailed Audit Planning Document; (4) audit program guides; monthly progress reports; (5) Notification of Findings and Recommendations (NFR); (6) status and other meetings documentation; (7) a Summary of Unadjusted Differences; (8) a review of financial statements to ensure compliance with USCCR requirements; (9) a summary memorandum documenting the conclusions reached on each significant internal control cycle, account balance, lead schedule, audit adjustments, and on the overall audit; (10) a Financial Statement Audit Completion Checklist (FAM 1003) and the Checklist for Federal Accounting, Reporting, and Disclosures (FAM 1050); (11) a consolidated report on the principal financial statements, internal control, and compliance with selected laws and regulations, including FFMIA, and applicable agreed-upon procedures; and (12) a Management Letter. See Section III, Scope of Work for further detail. Furthermore, all Contractor reports (both draft and final reports) shall be submitted to the Staff Director and the COTR. The period of performance for this task shall be from the date of award through November 16, 2010, with two 30-day extensions, if needed and four option years.Request to exercise any 30 days options must be requested in conformance with section XVII below. Offers will be evaluated in accordance with FAR 52-212.2 "Evaluation - Commercial Items, which is incorporated into this solicitation with addendum to paragraph (a) as follows: the following factors shall be used to evaluate offers: (1) technical proposal, (2) past performance, and (3) price. The Technical factors are significantly more important than cost or price. USCCR may select a proposal with superior non-price factors even if it results in a higher price. The Government will make award to the responsible contractor whose offer conforms to the requirements herein and represents the best value to the Government. Technical Proposal: The technical proposal shall include the following information (1) technical approach, (2) resumes for key personnel and other proposed personnel, detailing their qualifications and experience (3) description of the contractor's qualifications including number of years in business, experience providing financial statement audit services to Federal agencies, and experience with small Federal agencies. Technical proposals will be evaluated on their technical approach, qualifications of personnel, and contractor qualifications. Past performance: The quote shall include a minimum of three (3) references with a brief description of previous projects of similar size and complexity. Each example of past performance shall include: contract number; contract description; contract amount and type of contract; period of performance; name, address, Email address, telephone number, fax number (if Govt contract, provide the name, telephone number of contracting officer and the COR or if commercial, provide the technical and contracting equivalent); size and complexity of the project; and whether all options were exercised. Pricing: The quote shall include the following information: (1) a breakdown of labor categories, fully burdened hourly rates for all proposed personnel under each effort as outlined in the Statement of Work, (2) a breakdown of the number of proposed hours in sufficient detail to allow the Government a good understanding of your planned technical approach and the ability to review the consistency between the planned technical approach and the proposed pricing. The proposal shall not exceed 25 pages - resumes excluded. The following Federal Acquisition Regulation (FAR) provisions and clauses in effect through FAC 2005-03, dated April 2005 are applicable to this procurement: 52.212-1, Instructions To Offerors-Commercial Items; 52-212-4 Contract Terms and Conditions-Commercial Items; 52.212-5 Contract Terms and Conditions Required to Implement Statues or Executive Orders-Commercial Items including subparagraphs (b) (1), (17), (18), and (19), which are applicable to commercial services. 52.227-17 Rights in Data-Special Works and the Key Personnel Clause is applicable as well. The offeror shall submit with their quote a completed copy of FAR 52.212-3, Offeror Representations and Certifications-Commercial Items. The award will be based on the best value to the Government, price and other factors included. Submit three (3) copies of your quotes to Pamela Dunston, U.S. Commission on Civil Rights, Acquisition Office, Room 550, 624 Ninth Street, NW, Washington, DC 20425. Quotes will be accepted by Email, or hand-delivered. Proposals are due by May 12, 2007 at 12:00 Noon. The Government shall not pay for any costs associated with the preparation of the proposal. All RFQs received in aquistions@usccr.gov must be received by the deadline specified on http://www.usccr.gov. USCCR accepts no liability for the problems that are encountered by your email system. Please check for any viruses or security problems with your system before sending an email to this account. We will not accept any RFQs after the posted deadline. Point of Contact: Pamela Dunston Place of Performance: Washington, DC
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USCCR/USCCR/USCCR1/CCR-10-0001/listing.html)
- Place of Performance
- Address: 624 9th Street, NW, Washington, District of Columbia, 20425, United States
- Zip Code: 20425
- Zip Code: 20425
- Record
- SN02102343-W 20100327/100325234751-668ddebbbeb3f5ae684690b93b341bfe (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |