Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MARCH 27, 2010 FBO #3045
AWARD

Z -- RECOVERY--Z--PROJECT NUMBER 33441, Repair Building 422 Finishes, Electrical, Plumbing, HVAC, Fire Protection, Doors

Notice Date
3/25/2010
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Fort Hood DOC, Directorate of Contracting, 761st Tank Battalion Avenue, Room W103, Fort Hood, TX 76544-5025
 
ZIP Code
76544-5025
 
Solicitation Number
W9115110B0006
 
Response Due
3/17/2010
 
Archive Date
4/24/2010
 
Point of Contact
Jennifer Parker, 254 287-9801
 
E-Mail Address
Fort Hood DOC
(jennifer.l.parker@us.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W9115110C0073
 
Award Date
3/24/2010
 
Awardee
LEETEX CONSTRUCTION LLC (124155685)<br> 6301 GASTON AVE STE 570<br> DALLAS, TX 75214-6272
 
Award Amount
$7,571,952.00
 
Line Number
0001-0010
 
Description
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Repair Building 422, Finishes, Electrical, Plumbing, HVAC, Fire Suppression, Doors RECOVERY TAS::21 2022::TAS PPS# 33441; Repair Building 422, Finishes, Electrical, Plumbing, HVAC, Fire Protection, Doors: Repair Bldg 422. THIS NOTICE IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. CONTRACT Number W91151-10-C-0073 WAS AWARDED TO Leetex Construction, LLC of Dallas Texas, DUNS No. 124155685, as a firm fixed price construction contract in the amount of $7,571,952.00. The repairs include architectural, civil, mechanical, electrical, communication and fire protection work in an approximately 80,000 square foot facility. The requirements include but are not limited to removing all asbestos, lead and mold from the building. The exterior windows and facade shall be replaced in accordance with the drawings to include new force protection windows and metal panel wall system. The floor plan shall be altered to support the requirements of the NEC. A new mechanical system that includes boilers, chillers, air handling units and digital controls shall be installed. Power and communication shall be provided to all equipment and work stations. A new fire protection system that includes fire alarm, mass notification and wet pipe sprinkler system shall be installed.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/2d151f41272aeb29e4cde20b243e11dc)
 
Record
SN02102950-W 20100327/100325235343-2d151f41272aeb29e4cde20b243e11dc (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.