Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MARCH 28, 2010 FBO #3046
MODIFICATION

W -- Light Sets

Notice Date
3/26/2010
 
Notice Type
Modification/Amendment
 
Contracting Office
TBD, Fort Irwin, CA 92310
 
ZIP Code
92310
 
Solicitation Number
10-06-0009
 
Response Due
3/31/2010
 
Archive Date
9/27/2010
 
Point of Contact
Name: Client Services, Title: Sourcing Agent, Phone: 1.877.9FEDBID, Fax: 703.442.7822
 
E-Mail Address
clientservices@fedbid.com;
 
Small Business Set-Aside
Total Small Business
 
Description
AMENDMENT NOTICE: This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, in conjunction with FAR 13.5, as applicable, and as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; bids are being requested and a written solicitation will not be issued. The solicitation number is 10-06-0009 and is issued as an invitation for bids (IFB), unless otherwise indicated herein. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2005-34. The associated North American Industrial Classification System (NAICS) code for this procurement is 335110 with a small business size standard of 1,000.00 employees. This requirement is a [ Small Business ] set-aside and only qualified offerors may submit bids. The solicitation pricing on www.FedBid.com will start on the date this solicitation is posted and will end on 2010-03-31 13:00:00.0 Eastern Time or as otherwise displayed at www.FedBid.com. FOB Destination shall be Multiple shipping information. The USA ACC MICC Fort Irwin requires the following items, Meet or Exceed, to the following: LI 001, FOB MIAMI Period of Performance. 13-30 APR 2010. The Light Towers must be equipped with a towing pintle capable of being attached to a standard military HMMWV (M998). The contractor can also use or provide an Interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than (NLT) the first day of Period of Performance (POP). The contractor shall ensure at least a minimum of 4 x 1,000 watt bulbs. Also, the contractor shall ensure the light bulbs have a total power output of not less than 4kW and a total power output for the generator of not less than 7kW. The contractor shall ensure the Light Towers run on JP-8. The contractor shall ensure all Light Towers are delivered with all necessary parts and generators must have a full tank of fuel. The contractor shall provide repair and/or replacement services for the leased equipment within 24 hours of a service call. The contractor shall have 24 hour emergency services and be capable of being onsite for repair within 8 hours of an emergency call. All backup units utilized in the event of primary failure shall be at no additional cost to the Government., 30, EA; LI 002, JSS ABAR LAYLA Period of Performance. 13-30 APR 2010. The Light Towers must be equipped with a towing pintle capable of being attached to a standard military HMMWV (M998). The contractor can also use or provide an Interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than (NLT) the first day of Period of Performance (POP). The contractor shall ensure at least a minimum of 4 x 1,000 watt bulbs. Also, the contractor shall ensure the light bulbs have a total power output of not less than 4kW and a total power output for the generator of not less than 7kW. The contractor shall ensure the Light Towers run on JP-8. The contractor shall ensure all Light Towers are delivered with all necessary parts and generators must have a full tank of fuel. The contractor shall provide repair and/or replacement services for the leased equipment within 24 hours of a service call. The contractor shall have 24 hour emergency services and be capable of being onsite for repair within 8 hours of an emergency call. All backup units utilized in the event of primary failure shall be at no additional cost to the Government., 3, EA; LI 003, FOB RENO Period of Performance. 13-30 APR 2010. The Light Towers must be equipped with a towing pintle capable of being attached to a standard military HMMWV (M998). The contractor can also use or provide an Interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than (NLT) the first day of Period of Performance (POP). The contractor shall ensure at least a minimum of 4 x 1,000 watt bulbs. Also, the contractor shall ensure the light bulbs have a total power output of not less than 4kW and a total power output for the generator of not less than 7kW. The contractor shall ensure the Light Towers run on JP-8. The contractor shall ensure all Light Towers are delivered with all necessary parts and generators must have a full tank of fuel. The contractor shall provide repair and/or replacement services for the leased equipment within 24 hours of a service call. The contractor shall have 24 hour emergency services and be capable of being onsite for repair within 8 hours of an emergency call. All backup units utilized in the event of primary failure shall be at no additional cost to the Government., 5, EA; LI 004, JSS AL JAFF Period of Performance. 13-30 APR 2010. The Light Towers must be equipped with a towing pintle capable of being attached to a standard military HMMWV (M998). The contractor can also use or provide an Interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than (NLT) the first day of Period of Performance (POP). The contractor shall ensure at least a minimum of 4 x 1,000 watt bulbs. Also, the contractor shall ensure the light bulbs have a total power output of not less than 4kW and a total power output for the generator of not less than 7kW. The contractor shall ensure the Light Towers run on JP-8. The contractor shall ensure all Light Towers are delivered with all necessary parts and generators must have a full tank of fuel. The contractor shall provide repair and/or replacement services for the leased equipment within 24 hours of a service call. The contractor shall have 24 hour emergency services and be capable of being onsite for repair within 8 hours of an emergency call. All backup units utilized in the event of primary failure shall be at no additional cost to the Government., 3, EA; LI 005, JSS AL SHARQ Period of Performance. 13-30 APR 2010. The Light Towers must be equipped with a towing pintle capable of being attached to a standard military HMMWV (M998). The contractor can also use or provide an Interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than (NLT) the first day of Period of Performance (POP). The contractor shall ensure at least a minimum of 4 x 1,000 watt bulbs. Also, the contractor shall ensure the light bulbs have a total power output of not less than 4kW and a total power output for the generator of not less than 7kW. The contractor shall ensure the Light Towers run on JP-8. The contractor shall ensure all Light Towers are delivered with all necessary parts and generators must have a full tank of fuel. The contractor shall provide repair and/or replacement services for the leased equipment within 24 hours of a service call. The contractor shall have 24 hour emergency services and be capable of being onsite for repair within 8 hours of an emergency call. All backup units utilized in the event of primary failure shall be at no additional cost to the Government., 6, EA; LI 006, JSS MMA Period of Performance. 13-30 APR 2010. The Light Towers must be equipped with a towing pintle capable of being attached to a standard military HMMWV (M998). The contractor can also use or provide an Interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than (NLT) the first day of Period of Performance (POP). The contractor shall ensure at least a minimum of 4 x 1,000 watt bulbs. Also, the contractor shall ensure the light bulbs have a total power output of not less than 4kW and a total power output for the generator of not less than 7kW. The contractor shall ensure the Light Towers run on JP-8. The contractor shall ensure all Light Towers are delivered with all necessary parts and generators must have a full tank of fuel. The contractor shall provide repair and/or replacement services for the leased equipment within 24 hours of a service call. The contractor shall have 24 hour emergency services and be capable of being onsite for repair within 8 hours of an emergency call. All backup units utilized in the event of primary failure shall be at no additional cost to the Government., 6, EA; LI 007, JSS MEDINA WASAL Period of Performance. 13-30 APR 2010. The Light Towers must be equipped with a towing pintle capable of being attached to a standard military HMMWV (M998). The contractor can also use or provide an Interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than (NLT) the first day of Period of Performance (POP). The contractor shall ensure at least a minimum of 4 x 1,000 watt bulbs. Also, the contractor shall ensure the light bulbs have a total power output of not less than 4kW and a total power output for the generator of not less than 7kW. The contractor shall ensure the Light Towers run on JP-8. The contractor shall ensure all Light Towers are delivered with all necessary parts and generators must have a full tank of fuel. The contractor shall provide repair and/or replacement services for the leased equipment within 24 hours of a service call. The contractor shall have 24 hour emergency services and be capable of being onsite for repair within 8 hours of an emergency call. All backup units utilized in the event of primary failure shall be at no additional cost to the Government., 6, EA; LI 008, JSS MEDINA JABAL Period of Performance. 13-30 APR 2010. The Light Towers must be equipped with a towing pintle capable of being attached to a standard military HMMWV (M998). The contractor can also use or provide an Interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than (NLT) the first day of Period of Performance (POP). The contractor shall ensure at least a minimum of 4 x 1,000 watt bulbs. Also, the contractor shall ensure the light bulbs have a total power output of not less than 4kW and a total power output for the generator of not less than 7kW. The contractor shall ensure the Light Towers run on JP-8. The contractor shall ensure all Light Towers are delivered with all necessary parts and generators must have a full tank of fuel. The contractor shall provide repair and/or replacement services for the leased equipment within 24 hours of a service call. The contractor shall have 24 hour emergency services and be capable of being onsite for repair within 8 hours of an emergency call. All backup units utilized in the event of primary failure shall be at no additional cost to the Government., 6, EA; LI 009, AKDAR Period of Performance. 13-30 APR 2010. The Light Towers must be equipped with a towing pintle capable of being attached to a standard military HMMWV (M998). The contractor can also use or provide an Interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than (NLT) the first day of Period of Performance (POP). The contractor shall ensure at least a minimum of 4 x 1,000 watt bulbs. Also, the contractor shall ensure the light bulbs have a total power output of not less than 4kW and a total power output for the generator of not less than 7kW. The contractor shall ensure the Light Towers run on JP-8. The contractor shall ensure all Light Towers are delivered with all necessary parts and generators must have a full tank of fuel. The contractor shall provide repair and/or replacement services for the leased equipment within 24 hours of a service call. The contractor shall have 24 hour emergency services and be capable of being onsite for repair within 8 hours of an emergency call. All backup units utilized in the event of primary failure shall be at no additional cost to the Government., 6, EA; LI 010, FASP Period of Performance. 13-30 APR 2010. The Light Towers must be equipped with a towing pintle capable of being attached to a standard military HMMWV (M998). The contractor can also use or provide an Interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than (NLT) the first day of Period of Performance (POP). The contractor shall ensure at least a minimum of 4 x 1,000 watt bulbs. Also, the contractor shall ensure the light bulbs have a total power output of not less than 4kW and a total power output for the generator of not less than 7kW. The contractor shall ensure the Light Towers run on JP-8. The contractor shall ensure all Light Towers are delivered with all necessary parts and generators must have a full tank of fuel. The contractor shall provide repair and/or replacement services for the leased equipment within 24 hours of a service call. The contractor shall have 24 hour emergency services and be capable of being onsite for repair within 8 hours of an emergency call. All backup units utilized in the event of primary failure shall be at no additional cost to the Government., 10, EA; LI 011, JSS AL ZOORAH Period of Performance. 13-30 APR 2010. The Light Towers must be equipped with a towing pintle capable of being attached to a standard military HMMWV (M998). The contractor can also use or provide an Interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than (NLT) the first day of Period of Performance (POP). The contractor shall ensure at least a minimum of 4 x 1,000 watt bulbs. Also, the contractor shall ensure the light bulbs have a total power output of not less than 4kW and a total power output for the generator of not less than 7kW. The contractor shall ensure the Light Towers run on JP-8. The contractor shall ensure all Light Towers are delivered with all necessary parts and generators must have a full tank of fuel. The contractor shall provide repair and/or replacement services for the leased equipment within 24 hours of a service call. The contractor shall have 24 hour emergency services and be capable of being onsite for repair within 8 hours of an emergency call. All backup units utilized in the event of primary failure shall be at no additional cost to the Government., 3, EA; For this solicitation, USA ACC MICC Fort Irwin intends to conduct an online competitive reverse auction to be facilitated by the third-party reverse auction provider, FedBid, Inc. FedBid has developed an online, anonymous, browser based application to conduct the reverse auction. An Offeror may submit a series of pricing bids, which descend in price during the specified period of time for the aforementioned reverse auction. USA ACC MICC Fort Irwin is taking this action in an effort to improve both vendor access and awareness of requests and the agency's ability to gather multiple, competed, real-time bids. All responsible Offerors that respond to this solicitation MUST submit the pricing portion of their bid using the online exchange located at www.FedBid.com. There is no cost to register, review procurement data or make a bid on www.FedBid.com. Offerors that are not currently registered to use www.FedBid.com should proceed to www.FedBid.com to complete their free registration. Offerors that require special considerations or assistance may contact the FedBid Helpdesk at 877-9FEDBID (877-933-3243) or via email at clientservices@fedbid.com. Offerors may not artificially manipulate the price of a transaction on www.FedBid.com by any means. It is unacceptable to place bad faith bids, to use decoys in the www.FedBid.com process or to collude with the intent or effect of hampering the competitive www.FedBid.com process. Should offerors require additional clarification, notify the point of contact or FedBid at 877-9FEDBID (877-933-3243) or clientservices@fedbid.com. Use of FedBid: Buyers and Sellers agree to conduct this transaction through FedBid in compliance with the FedBid Terms of Use. Failure to comply with the below terms and conditions may result in offer being determined as non-responsive. New Equipment ONLY; NO remanufactured or "gray market" items. All items must be covered by the manufacturer's warranty. Bid MUST be good for 30 calendar days after close of Buy. Shipping must be free on board (FOB) destination CONUS (Continental U.S.), which means that the seller must deliver the goods on its conveyance at the destination specified by the buyer, and the seller is responsible for the cost of shipping and risk of loss prior to actual delivery at the specified destination. Offeror must be registered in the Central Contractor Registration (CCR) database before an award can be made to them. If the offeror is not registered in the CCR, it may do so through the CCR website at http://www.ccr.gov. Delivery must be made within 3 days or less after receipt of order (ARO). The offeror must provide within its offer the number of days - not to exceed 3 - required to make delivery after it receives a purchase order from the buyer. The selected Offeror must comply with the following commercial item terms and conditions, which are incorporated herein by reference: FAR 52.212-1, Instructions to Offerors - Commercial Items, applies to this acquisition; FAR 52.212-3, Offeror Representations and Certifications - Commercial Items - the selected offeror must submit a completed copy of the listed representations and certifications; FAR 52.212-4, Contract Terms and Conditions - Commercial Items; FAR 52.212-5, Contract Terms and Conditions Required To Implement Statutes or Executive Orders-Commercial Items, paragraph (a) and the following clauses in paragraph (b): 52.222-21, 52.222-26, 52.222-35, 52.222-36, 52.222-37, 52.225-13, 52.232-34. The full text of the referenced FAR clauses may be accessed electronically at http://www.acqnet.gov/far. In accordance with DFARS 252.232-7003, "Electronic Submission of Payment Requests and Receiving Reports", the contractor shall submit their payment request electronically using the WAWF. The WAWF website is located at https://wawf.eb.mil. There is no charge to use WAWF. Contractors must register to use WAWF at this website and ensure an electronic business point of contact (POC) is designated in the Central Contractor Registration (CCR) site at http://www.ccr.gov within ten (10) calendar days after award of this contract. Contractor training is available at the website home page under "about WAWF". Contractors may contact the WAWF Customer Support for assistance toll free at 866-618-5988; commercial: 801-605-7095; Fax commercial: 801-605-7453 or CSCASSIG@CSD,DISA.MIL. The Government reserves the right to vary quantities by +/- 30% due to operational requirements and to make multiple awards to meet said requirements. Sellers must present their representations and certifications, upon request, through the Online Respresentatives and Certifications Application (ORCA) at http://orca.bpn.gov The Government intends to award to the responsible offerors whose offers conforming to the solicitation that will be the most advantageous to the Government based upon Best value. Offerors will be avaluated based on price and availability with all factors being equal. The government incurrs no additional charges for early return of leased equipment. The government maintains the right to award to multiple vendors.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/6c1f9345b65fdaa4200865fdd25a93a2)
 
Place of Performance
Address: Multiple shipping information.
Zip Code: Multiple
 
Record
SN02103627-W 20100328/100326234624-6c1f9345b65fdaa4200865fdd25a93a2 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.