Y -- RECOVERY Y--STIMULUS PROJECT/RECOVERY ACT (ADDITION): CONTRACT #: VA243-RA-0843 PROJECT # 630-08-101 Roof Replacement Phase II

Notice Date
3/30/2010
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of Veterans Affairs;James J. Peters VA Medical Center;130 West Kingsbridge Road;Bronx NY 10468-3904
 
ZIP Code
10468-3904
 
Solicitation Number
VA-243-10-RA-0174
 
Archive Date
4/25/2010
 
Point of Contact
U.S. Department of Veterans AffairsNew York Harbor Health Care Systems
 
E-Mail Address
EMAIL
(Vladimir.Stoyanov@va.gov)
 
Small Business Set-Aside
N/A
 
Award Number
VA243-RA-0843
 
Award Date
3/26/2010
 
Awardee
VETERANS CONTRACTING GROUP, INC.;526 FAYETTE AVE;MAMARONECK;NY;105432212
 
Award Amount
2,168,250.00
 
Line Number
1
 
Description
SCOPE OF WORK for CONSTRUCTION630-08-101 Repair Roof, Phase II 1.2 STATEMENT OF BID ITEMS (STATEMENT OF WORK) A.ITEM I, Repair Roof Phase II: The work scope is fairly well defined and the project will be a lump sum bids with the following work at a minimum required: 1.Replacement of roofing systems of Building #1, (Main Building): Chapel Roof, and Gymnasium Roof. 2.Replacement of existing roofing system of Building # 4, (A/C Building). 3.Replacement of existing roofing system of Building # 5, (Switchgear/ Chiller Building). 4.Replacement of existing roofing system of Building # 2 including lower roof over maintenance shops, (Annex Building). 5.Repair of main canopy at the entrance to Main Building # 1. 6.Extend Rear Parking Lot Security Booth entrance canopy. Walkway Bridges between Building # 1 & 3 and Building # 2 & 3. 7.Replacement of existing Exterior Ceiling System for Walkway Bridges between Buildings #1 & #3. 8. Provide and implement the Construction QA/QC and Safety Program as outlined in Item # 1.34 of this specification section. BASE BID PRICE $ ____________________________________________________ CALENDAR DAYS TO COMPLETE: Three Hundred Sixty Five (365) Calendar Days B.Base Bid and Alternates. This project includes the Base Bid and Alternates No.1, No. 2, No. 3, No.4, No. 5, No. 6, No.7, No. 8, No. 9, No.10, No. 11 and No. 12. The Base Bid includes all the work described in Article 1.2 A. Statement of Work. Each successive Alternate deletes work from the Base Bid as follows: 1. Base Bid includes work described in Article 1.2 A. Statement of Work. a.Alternate No. 1 This Alternate is the Base Bid minus the removal of the Gymnasium Roof from Item No. 1 of the Statement of Work. ALTERNATE #1 BID PRICE $______________________________________________ CALENDAR DAYS TO COMPLETE: Three Hundred Thirty Seven (337) Calendar Days b.Alternate No. 2 This Alternate is the Base Bid minus the removal of Item 6 of the Statement of Work in its entirety. ALTERNATE #2 BID PRICE $_______________________________________ CALENDAR DAYS TO COMPLETE: Three Hundred Nine (309) Calendar Days c.Alternate No. 3 - This Alternate is the Base Bid minus the removal of the Gymnasium Roof from Item No. 1 of the Statement of Work and the removal of Item 6 of the Statement of Work in its entirety. ALTERNATE #3 BID PRICE $_______________________________________ COMPLETION DATE: Two Hundred Eight One (281) Calendar Days________ d.Alternate No. 4 This Alternate is the Base Bid minus the removal of Switchgear / Chiller Building from Item 3 of the Statement of Work in its entirety. ALTERNATE #4 BID PRICE $____________________________________________ CALENDAR DAYS TO COMPLETE: Three Hundred Forty Five (345) Calendar Days e.Alternate No. 5 This Alternate is the Base Bid minus the removal of Annex Building from Item 4 of the Statement of Work in its entirety. ALTERNATE #5 BID PRICE $_______________________________________ COMPLETION DATE: Three Hundred Thirty Seven (337) Calendar Days_____ f.Alternate No. 6 This Alternate is the Base Bid minus the removal of Main Building #1 Canopy Entrance from Item 5 of the Statement of Work in its entirety. ALTERNATE #6 BID PRICE $_______________________________________ COMPLETION DATE: Three Hundred Forty Four (344) Calendar Days_______ g.Alternate No. 7 This Alternate is the Base Bid minus the removal of Walkway Bridges Exterior Ceiling System from Item 7 of the Statement of Work in its entirety. ALTERNATE #7 BID PRICE $_______________________________________ COMPLETION DATE: Three Hundred Fifty One (351) Calendar Days_______ h.Alternate No. 8 This Alternate is the Base Bid minus the item #2 Replacement of existing roofing system of Building # 4(A/C Building), minus the item #3 replacement of existing roofing system of Building # 5,(Switchgear/ Chiller Building) and minus the item #4 Replacement of existing roofing system of Building #2 including lower roof over maintenance shops (Annex Building). ALTERNATE #8 BID PRICE $_______________________________________ COMPLETION DATE: Two Hundred Ninety Five (295) Calendar Days_______ i.Alternate No. 9 This Alternate is the Base Bid minus the item #2 Replacement of existing roofing system of Building # 4(A/C Building), minus the item #3 replacement of existing roofing system of Building #5, (Switchgear/ Chiller Building), minus the item #4 Replacement of existing roofing system of Building #2 including lower roof over maintenance shops (Annex Building) and minus the item #5 Repair of main canopy at the entrance to Main Building # 1. ALTERNATE #9 BID PRICE $_______________________________________ COMPLETION DATE: Two Hundred Seventy Four (274) Calendar Days_____ j.Alternate No. 10 This Alternate is the Base Bid minus the item #2 Replacement of existing roofing system of Building #4 (A/C Building), minus the item #3 replacement of existing roofing system of Building #5 (Switchgear/ Chiller Building), minus the item #4 Replacement of existing roofing system of Building #2 including lower roof over maintenance shops (Annex Building), minus the item #5 Repair of main canopy at the entrance to Main Building #1, minus the item #6 Extend Rear Parking Lot Security Booth entrance canopy. Walkway Bridges between Building #1 & 3 and Building #2 & 3 and minus the item #7 Replacement of existing Exterior Ceiling System for Walkway Bridges between Buildings #1 & #3. ALTERNATE #10 BID PRICE $______________________________________ COMPLETION DATE: Two Hundred Four (204) Calendar Days_____________ k.Alternate No. 11 This Alternate is the Base Bid minus the item #2 Replacement of existing roofing system of Building #4 (A/C Building)and minus the item #3 replacement of existing roofing system of Building #5,(Switchgear/ Chiller Building). ALTERNATE #11 BID PRICE $______________________________________ COMPLETION DATE: Three Hundred Twenty Three (323) Calendar Days____ l.Alternate No. 12 - This Alternate is the Base Bid minus the item #5 Repair of main canopy at the entrance to Main Building #1, minus the item #6 Extend Rear Parking Lot Security Booth entrance canopy, Walkway Bridges between Building #1 & 3 and Building #2 & 3 and minus the item #7 Replacement of existing Exterior Ceiling System for Walkway Bridges between Buildings #1 & #3. ALTERNATE #12 BID PRICE $_____________________________________ COMPLETION DATE: Two Hundred Seventy Four (274) Calendar Days____ C. Contract Time. 1.Contractor shall achieve substantial completion of the work within Three Hundred Sixty Five (365) calendar days unless the period of completion is extended by the contract documents.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/BroVANAP/VAMD/Awards/VA243-RA-0843.html)
 
Record
SN02106866-W 20100401/100330235345-ab0b240e60a9f5247d24a7f3fd59010f (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.