Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 18, 2010 FBO #3067
AWARD

Y -- RECOVERY--Y--PROJECT NUMBER 114785, SRINGFIELD MILL RACE ECO RESTORATION PHASE II

Notice Date
4/16/2010
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
USACE District, Portland, Contracting Division (CECT-NWP), P.O. Box 2946, Portland, OR 97208-2946
 
ZIP Code
97208-2946
 
Solicitation Number
W9127N-09-R-0085
 
Archive Date
5/16/2010
 
Point of Contact
Trevor Laughter, 503-808-4613
 
E-Mail Address
USACE District, Portland
(trevor.laughter@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W9127N-10-C-0024
 
Award Date
4/16/2010
 
Awardee
JUST BUCKET EXCAVATING, INC. (791892651)<br> 324 SW 29TH AVE<br> ALBANY, OR 97322-3899
 
Award Amount
$2,082,957.09
 
Line Number
7001, 002, 003
 
Description
Contract Award Amount equals $1,279,175.34 Recovery Funds, and $803,781.75 Non-Recovery Funds. This contract action was accomplished using other than competitive procedures because a statute exists that expressly authorizes or requires that the acquisition be made from a specific source or through another agency (FAR 6.302-5); specifically, Sole source awards under the 8(a) Program. Per FAR 6.302-5 a J&A is not required for this award. This project will restore the Springfield Mill Race back to a stream and remove the existing pond. The contract will includ the replacement of the diversion culverts and sluice gates to Gorrie Creek and the installation of fish screens; Placing fill material to reduce bank slope and channel width between F Street Bridge and the Mill Pond to match the rest of the Mill Race channel and provie a buffer from the lumber mill; Removal of the Mill Dam and bridge and associated sheet piling, fill, fish ladder, and retaining walls; Cutting back storm drain outfalls near the Mill Dam and routing existing subsurface vault outlets into two storm water detention basins designed to treat storm water from the Booth-Kelly site prior to discharge into the Mill Race; Excavation and grading of a new Mill Race channel through the Mill Pond and creation of wetlands and backwater sloughs.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA57/Awards/W9127N-10-C-0024.html)
 
Record
SN02123889-W 20100418/100416234659-2552c12f451bd73011b6e3f15b163548 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.