AWARD
Z -- RECOVERY--Z--PROJECT NUMBER 13370, Optima Lake, OK
- Notice Date
- 4/16/2010
- Notice Type
- Award Notice
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- USACE District, Tulsa, ATTN: CESWT-CT, 1645 South 101st East Avenue, Tulsa, OK 74128-4609
- ZIP Code
- 74128-4609
- Solicitation Number
- W912BV-09-R-1008
- Archive Date
- 5/16/2010
- Point of Contact
- Stephanie Murphree, 918-669-7041
- E-Mail Address
-
USACE District, Tulsa
(stephanie.murphree@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912BV-09-D-1003-0005
- Award Date
- 4/15/2010
- Awardee
- HDB CONSTRUCTION, INC. (144525003)<br> 729 SE WEAR AVE<br> TOPEKA, KS 66607-1769
- Award Amount
- $145,800.02
- Line Number
- 1-13
- Description
- RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Silver Spur Construction, W912BV-09-D-1002; HDB Construction, W912BV-09-D-1003; Trend Construction, W912BV-09-D-1004; and Tri-City Seal, W912BV-09-D-1005 INCLUDED IN THE MAINTENANCE, REPAIR, AND RESTORATION (MRR), LAKE OFFICE PROJECTS AND CIVIL WORKS WITHIN TULSA DISTRICT BOUNDARIES INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) CONTRACT, HUBZONE SMALL BUSINESS MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) POOL. THE INTENT OF THIS ARRA PROJECT IS TO DEMOLISH THE STRUCTURES AT THE FIVE LAKE RECREATION SITES AND INSTALL A GATE TO CLOSE THE ROAD OVER TH DAM. WORK INCLUDES DEMOLISH CAMPSITES. ANY ABOVE GROUND STRUCTURES AT CAMPSITES SHALL BE DEMOLISHED AND ALL RUBBLE SHALL BE DISPOSED OF IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. STRUCTURES MAY INCLUDE BUT ARE NOT LIMITED TO PICNIC TABLES, AWNINGS, AND WALLS. DEMOLISH RESTROOMS. ABOVE GROUND STRUCTURES SHALL BE DEMOLISHED AND ALL RUBBLE SHALL BE DISPOSED OF IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. SEPTIC TANKS SHALL BE PUMPED FREE OF ALL LIQUID WASTE AND LARGE DEBRIS SHALL BE REMOVED. HOLES SHALL BE PUNCHED IN THE BOTTOM OF THE SEPTIC TANK TO ALLOW PROPER DRAINAGE OF FUTURE RAIN WATER WHICH MAY ENTER THE TANK. THE SEPTIC TANK SHALL THEN BE FILLED WITH SAND. THE TANK SHALL THEN BE FLOODED WITH WATER TO COMPACT THE SAND AND CHECK THE DRAINAGE OF THE TANK. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY PERMITS NECESSARY TO PERFORM THIS WORK AND ENSURING THAT THE WORK COMPLIES WITH ANY APPLICABLE REGULATIONS AND STANDARDS. TRAILER DUMP STATIONS. ANY ABOVE GROUND STRUCTURES AT THE TRAILER DUMP STATIONS SHALL BE DEMOLISHED AND ALL RUBBLE SHALL BE DISPOSED OF IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. SEPTIC TANKS SHALL BE PUMPED FREE OF ALL LIQUID WASTE AND LARGE DEBRIS SHALL BE REMOVED. HOLES SHALL BE PUNCHED IN THE BOTTOM OF THE SEPTIC TANK TO ALLOW PROPER DRAINAGE OF FUTURE RAIN WATER WHICH MAY ENTER THE TANK. THE SEPTIC TANK SHALL THEN BE FILLED WITH SAND. THE TANK SHALL THEN BE FLOODED WITH WATER TO COMPACT THE SAND AND CHECK THE DRAINAGE OF THE TANK. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY PERMITS NECESSARY TO PERFORM THIS WORK AND ENSURING THAT THE WORK COMPLIES WITH ANY APPLICABLE REGULATIONS AND STANDARDS. OTHER ABOVE GROUND STRUCTURES EXIST AT THE LAKE WHICH SHALL BE DEMOLISHED AND ALL RUBBLE SHALL BE DISPOSED OF ACCORDING TO THE CONTRACT DOCUMENTS.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA56/Awards/W912BV-09-D-1003-0005.html)
- Record
- SN02124615-W 20100418/100416235610-cd18b011851afa17c74c0b01dd262c0b (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |