Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 18, 2010 FBO #3067
AWARD

Z -- RECOVERY--Z--PROJECT NUMBER 13370, Optima Lake, OK

Notice Date
4/16/2010
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
USACE District, Tulsa, ATTN: CESWT-CT, 1645 South 101st East Avenue, Tulsa, OK 74128-4609
 
ZIP Code
74128-4609
 
Solicitation Number
W912BV-09-R-1008
 
Archive Date
5/16/2010
 
Point of Contact
Stephanie Murphree, 918-669-7041
 
E-Mail Address
USACE District, Tulsa
(stephanie.murphree@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912BV-09-D-1003-0005
 
Award Date
4/15/2010
 
Awardee
HDB CONSTRUCTION, INC. (144525003)<br> 729 SE WEAR AVE<br> TOPEKA, KS 66607-1769
 
Award Amount
$145,800.02
 
Line Number
1-13
 
Description
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Silver Spur Construction, W912BV-09-D-1002; HDB Construction, W912BV-09-D-1003; Trend Construction, W912BV-09-D-1004; and Tri-City Seal, W912BV-09-D-1005 INCLUDED IN THE MAINTENANCE, REPAIR, AND RESTORATION (MRR), LAKE OFFICE PROJECTS AND CIVIL WORKS WITHIN TULSA DISTRICT BOUNDARIES INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) CONTRACT, HUBZONE SMALL BUSINESS MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) POOL. THE INTENT OF THIS ARRA PROJECT IS TO DEMOLISH THE STRUCTURES AT THE FIVE LAKE RECREATION SITES AND INSTALL A GATE TO CLOSE THE ROAD OVER TH DAM. WORK INCLUDES DEMOLISH CAMPSITES. ANY ABOVE GROUND STRUCTURES AT CAMPSITES SHALL BE DEMOLISHED AND ALL RUBBLE SHALL BE DISPOSED OF IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. STRUCTURES MAY INCLUDE BUT ARE NOT LIMITED TO PICNIC TABLES, AWNINGS, AND WALLS. DEMOLISH RESTROOMS. ABOVE GROUND STRUCTURES SHALL BE DEMOLISHED AND ALL RUBBLE SHALL BE DISPOSED OF IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. SEPTIC TANKS SHALL BE PUMPED FREE OF ALL LIQUID WASTE AND LARGE DEBRIS SHALL BE REMOVED. HOLES SHALL BE PUNCHED IN THE BOTTOM OF THE SEPTIC TANK TO ALLOW PROPER DRAINAGE OF FUTURE RAIN WATER WHICH MAY ENTER THE TANK. THE SEPTIC TANK SHALL THEN BE FILLED WITH SAND. THE TANK SHALL THEN BE FLOODED WITH WATER TO COMPACT THE SAND AND CHECK THE DRAINAGE OF THE TANK. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY PERMITS NECESSARY TO PERFORM THIS WORK AND ENSURING THAT THE WORK COMPLIES WITH ANY APPLICABLE REGULATIONS AND STANDARDS. TRAILER DUMP STATIONS. ANY ABOVE GROUND STRUCTURES AT THE TRAILER DUMP STATIONS SHALL BE DEMOLISHED AND ALL RUBBLE SHALL BE DISPOSED OF IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. SEPTIC TANKS SHALL BE PUMPED FREE OF ALL LIQUID WASTE AND LARGE DEBRIS SHALL BE REMOVED. HOLES SHALL BE PUNCHED IN THE BOTTOM OF THE SEPTIC TANK TO ALLOW PROPER DRAINAGE OF FUTURE RAIN WATER WHICH MAY ENTER THE TANK. THE SEPTIC TANK SHALL THEN BE FILLED WITH SAND. THE TANK SHALL THEN BE FLOODED WITH WATER TO COMPACT THE SAND AND CHECK THE DRAINAGE OF THE TANK. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY PERMITS NECESSARY TO PERFORM THIS WORK AND ENSURING THAT THE WORK COMPLIES WITH ANY APPLICABLE REGULATIONS AND STANDARDS. OTHER ABOVE GROUND STRUCTURES EXIST AT THE LAKE WHICH SHALL BE DEMOLISHED AND ALL RUBBLE SHALL BE DISPOSED OF ACCORDING TO THE CONTRACT DOCUMENTS.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA56/Awards/W912BV-09-D-1003-0005.html)
 
Record
SN02124615-W 20100418/100416235610-cd18b011851afa17c74c0b01dd262c0b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.