SOLICITATION NOTICE
Y -- RECOVERY: Dinkey Mill Barracks Project
- Notice Date
- 4/19/2010
- Notice Type
- Presolicitation
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- Department of Agriculture, Forest Service, EROC Southwest, 1323 Club Drive, Vallejo, California, 94592, United States
- ZIP Code
- 94592
- Solicitation Number
- RFP-AG-9702-S-10-0008
- Point of Contact
- Patrick J Gallegos, Phone: 559 297-0706 Ext. 4830, Gloria J. Taylor, Phone: (559) 297 0706 Ext. 4837
- E-Mail Address
-
pgallegos@fs.fed.us, gjtaylor@fs.fed.us
(pgallegos@fs.fed.us, gjtaylor@fs.fed.us)
- Small Business Set-Aside
- N/A
- Description
- RECOVERY: This project is funded by the American Recovery and Reinvestment Act of 2009 (ARRA) and is subject to the requirements of the act. The full solicitation contraining all information regarding this project will be posted at fedbizopps.gov on or about June 2, 2010. The Dinkey Mill Barracks project includes the construction of two Barracks Buildings (each approximately 2300 square feet) with all required utilities services (power, water, septic system, phone, etc.) The work includes but is not limited to the site preparation, site accessibility improvements, new building construction, and new interior furnishings with improvements, including all utility services and connections to existing utilities. Project Location: The project is located on the High Sierra Ranger District at the Dinkey Mill project site (old Pine Logging Camp) approximately 10 miles East of the community of Shaver Lake California along County Road M2442 (Dinkey Creek Rd). From Clovis, CA take State Highway 168 NE appox. 35 miles through the community of Prather, CA to the community of Shaver Lk, CA and the intersection of State Hwy 168 and County road M2442 (Dinkey Creek Rd), then proceed East along County Rd M2442 (Dinkey Creek Rd) approx. 10 miles to the entrance of the Dinkey Mill project site. The proposed Work Center is on the East side of the County Road. The project site is approximately 0.5 miles from the County Road traveling along the proposed Work Center roadway. Contract Time: Estimated start work date is July 1, 2010. All project work shall be completed by Sept. 5, 2011 Government Estimated Price Range: Between $1,000,000.00 to $5,000,000.00 Pre-Bid Tour: A pre-bid tgour will be conducted on May 18, 2010 at 10:00 a.m. We will meet at the Dinkey Mill Work Center project location. Bidders may request information about the tour by contacting Jim Madron, at 559-297-0706 ext. 4842, between the hours of 8:00 a.m. and 3:00 p.m. Monday through Friday.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/notices/80e236cf65998a1a8f6fb69f6b1f4c94)
- Record
- SN02125825-W 20100421/100419234837-80e236cf65998a1a8f6fb69f6b1f4c94 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |