Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 21, 2010 FBO #3070
SOLICITATION NOTICE

Z -- HVAC Maintenance/Repair at Dept. of Energy Forrestal and Germantown

Notice Date
4/19/2010
 
Notice Type
Combined Synopsis/Solicitation
 
Contracting Office
Office of HQ PS (HQ)U.S. Department of EnergyOffice of Headquarters ProcurementMA-641000 Independence Ave., S.W.WashingtonDC20585
 
ZIP Code
20585
 
Solicitation Number
DE-SOL-0001747
 
Response Due
5/14/2010
 
Archive Date
6/13/2010
 
Point of Contact
Kyle Martel, 202-287-1362, kyle.martel@hq.doe.gov
 
E-Mail Address
Kyle Martel
(kyle.martel@hq.doe.gov)
 
Small Business Set-Aside
N/A
 
Description
James E. Forrestal Building1000 Independence Ave, SWWashington, DC 20585 Statement of Work Provide all labor, material, equipment and supervision necessary to service and repair all dampers (pneumatic, electric and manual), air handlers, pumps, blowers, exhaust fans, air compressors, values, gauges and piping. Provide all repairs to ductwork and all refrigeration repairs (? Ton thru 100 Tons). Fabricate all ductwork and install A/C compressors. Effectively clean (vacuum and brush) air ducts, vents, coil, air intake pits, air handlers, and fan coil units. Provide balancing of moving equipment and perform ASME Certified welding. Perform vibration analysis, machine shop work and fabrication of parts. Perform steam fitting for high and low pressure steam systems. Install and repair domestic water and various other hydronic piping systems. Perform preventive maintenance to all equipment of Heating, Ventilating and Air Conditioning (HVAC) and plumbing systems. Insulate piping, air ducts, fitting, elbows, tees, etc., on an 'as needed' basis in machine rooms and b uilding corridors at the Forrestal facility. Insulation work shall possibly include, but not limited to the following: Insulate condensate lines and ducts. Insulate pipes on chilled water and steam lines and apply canvas. Insulate pipe off headers in Machine Rooms. All insulation shall be fiberglass board for duct work inside machine rooms, fiberglass wrap for ductwork located in corridor office spaces. Insulation for piping shall be pre-formed fiberglass board and/or rubber-tex and shall be a minimum of 1 ?" in thickness and shall be rated no lower than 850 degrees. Pipes needing insulation are steel schedule 40 & 80 and copper water piping and range from ?" to 20" for domestic, steam and chilled water piping systems. Provide other related heating and air conditioning equipment and or plumbing work located throughout the DOE Forrestal Building. All employees must wear uniforms identifying the company name and the first name of the employee. All employees must wear safety shoes. Preventive maintenance and normal service will be performed Monday through Friday during normal business hours (7:00 A.M. TO 4:00 P.M.), unless otherwise noted. Emergency service and repairs are subject to 24 hour call and require a 2 hour response time. Contractor to provide CFC Certifications for all HVAC Mechanics 15 days after award. Contractor is to provide all tools, ladders etc. necessary to perform the related work.. Insert insulation tables from last procurement. COR Forrestal Clint M. Cleveland 202 586-6944 Authorized Callers Clint M. ClevelandCharles KuzasJames MorrisonKelvin JamisonMichael WatkinsMichael E. Shincovich Re-insulation work per attached. Perform maintenance on the OPTIONAL line items per the attached General Services Administration (GSA) preventive maintenance guidelines for each item. (See Attachment ) Provide service representatives with a minimum of 5 years experience in performing maintenance and emergency service on the following OPTIONAL line items. Maintenance to be performed per the attached General Services Administration (GSA) preventive maintenance guidelines for each item. (See Attachment) Germantown Building19901 Germantown RoadGermantown, Maryland 20874 Statement of Work Provide all labor, material, equipment and supervision necessary to service and repair all dampers (pneumatic, electric and manual), air handlers, pumps, blowers, exhaust fans, air compressors, values, gauges and piping. Provide all repairs to ductwork and all refrigeration repairs (? Ton thru 750 Tons). Fabricate all ductwork and install A/C compressors. Effectively clean (vacuum and brush) air ducts, vents, coil, air intake pits, air handlers, and fan coil units. Provide balancing of moving equipment and perform ASME Certified welding. Perform vibration analysis, machine shop work and fabrication of parts. Perform steam fitting for high and low pressure steam systems. Install and repair domestic water and various other hydronic piping systems. Perform preventive maintenance to all equipment of Heating, Ventilating and Air Conditioning (HVAC), boiler and plumbing systems. Insulate piping, air ducts, fitting, elbows, tees, etc., on an 'as needed' basis in machine roo ms and building corridors at the Forrestal facility. Insulation work shall possibly include, but not limited to the following: Insulate condensate lines and ducts. Insulate pipes on chilled water and steam lines and apply canvas. Insulate pipe off headers in Machine Rooms. All insulation shall be fiberglass board for duct work inside machine rooms, fiberglass wrap for ductwork located in corridor office spaces. Insulation for piping shall be pre-formed fiberglass board and/or rubber-tex and shall be a minimum of 1 ?" in thickness and shall be rated no lower than 850 degrees. Pipes needing insulation are steel schedule 40 & 80 and copper water piping and range from ?" to 20" for domestic, steam and chilled water piping systems. Provide other related heating and air conditioning and boiler equipment and or plumbing work located throughout the DOE Germantown Complex. All employees must wear uniforms identifying the company name and the first name of the employee. All employees must wear safety shoes. Re-insulation work per attached. Preventive maintenance and normal service will be performed Monday through Friday during normal business hours (7:00 A.M. TO 4:00 P.M.), unless otherwise noted. Emergency service and repairs are subject to 24 hour call and require a 2 hour response time. Contractor to provide CFC Certifications for all HVAC Mechanics 15 days after award. Contractor is to provide all tools, ladders etc. necessary to perform the related work.. COR Germantown Michael Watkins 301 903-7050 Authorized Callers Drew SmithVirgil DenningJim DevilbissMichael WatkinsMichael E. Shincovich Perform maintenance on the OPTIONAL line items per the attached General Services Administration (GSA) preventive maintenance guidelines for each item. (See Attachment ) Provide service representatives with a minimum of 5 years experience in performing maintenance and emergency service on the following OPTIONAL line items. Maintenance to be performed per the attached General Services Administration (GSA) preventive maintenance guidelines for each item. (See Attachment )
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOE/PAM/HQ/DE-SOL-0001747/listing.html)
 
Record
SN02126209-W 20100421/100419235140-cc2adfa038c373ad8afb7a8381487ab2 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.