FBO DAILY ISSUE OF APRIL 24, 2010 FBO #3073
AWARD

Z -- RECOVERY--Z--PROJECT NUMBER 4100, Council Grove Lake, KS, PROJECT NUMBER 510, Mcclellan-Kerr Arkansas River Navigation System, OK, PROJECT NUMBER 5360, Elk City Lake, KS, PROJECT NUMBER 75012, Arcadia Lake, OK

Notice Date
4/22/2010
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
USACE District, Tulsa, ATTN: CESWT-CT, 1645 South 101st East Avenue, Tulsa, OK 74128-4609
 
ZIP Code
74128-4609
 
Solicitation Number
W912BV-09-R-2024-0002
 
Response Due
3/23/2010
 
Archive Date
5/22/2010
 
Point of Contact
Daniel Foyil, 918-669-7045
 
E-Mail Address
USACE District, Tulsa
(daniel.a.foyil@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912BV-10-D-2021-0002
 
Award Date
4/22/2010
 
Awardee
DOWNEY CONTRACTING, L.L.C. (157942041)<br> 3217 NE 63RD ST<br> OKLAHOMA CITY, OK 73121-1205
 
Award Amount
$1,633,150.20
 
Line Number
1-27
 
Description
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Asset Group, Downey Contracting, Southwind Construction, and The Ross Group Construction Co.; Contract Numbers W912BV-10-D-2020, 2021, 2022, & 2023 under the Tulsa District Small Business MATOC Pool. This project consist of Chouteau L&D Bridge Repairs - Replace steel rocker and fixed bearings with elastomeric bearing pads; Repair and modify concrete bridge deck joints Concrete overlay of portions of bridge deck and sidewalk; prep and paint steel girders of the bridge. Elk City Bridge Repair Corbels - Rehab corbels through the use of high strength tensioning steel rods that are drilled through corbel and anchored on either end by galvanized steel plates. Ends are capped to prevent corrosion. Elk City Paint Bulkhead and Repair Gate Liners 1 - Work on corbel must be completed before conducting this work. Crane shall be utilized on the bridge to lift out the bulkhead. Bulkhead shall be prepped and painted. Also there will weld repair of damaged areas on bulkhead. Bulkhead shall be placed upstream of emergency gate slot. Sluice shall be dewatered. The emergeny gate liner shall be weld repaired and prepped for paint. Council Grove Bridge Repair Corbels - Rehab corbels in a similar fashion to Elk City Bridge Corbels. Aracdia Bridge Repair Corbels - Rehab corbels in a similar fashion to Council Grove and Elk City Bridges.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA56/W912BV-09-R-2024-0002/listing.html)
 
Record
SN02129668-W 20100424/100422235029-4111d9e2bbbcb3a1772e146a30055492 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.