Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 30, 2010 FBO #3079
AWARD

C -- RECOVERY-C-PROJECT CODE: 4990, UPDATE OF INUNDATION MAPS AS REQUIRED FOR FLOOD RISK REDUCTION PURPOSES.

Notice Date
4/28/2010
 
Notice Type
Award Notice
 
NAICS
541310 — Architectural Services
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, San Francisco, ATTN: CECT-SPN, 1455 MARKET ST., 17TH FL, San Francisco, California, 94103-1398, United States
 
ZIP Code
94103-1398
 
Solicitation Number
W91238-10-D-0001-CP02
 
Point of Contact
James E Hallman, Phone: 4155036974
 
E-Mail Address
james.e.hallman@usace.army.mil
(james.e.hallman@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W91238-10-D-0001-CP02
 
Award Date
4/27/2010
 
Awardee
McMillen, LLC (184758055), 910 Main St Ste 258, Boise, Idaho 83702-5750, United States
 
Award Amount
$129,752.96
 
Description
The purpose of the study is to evaluate the adequacy of the Warm Spring Dam Spillway. The analysis shall determine the downstream inundation caused by both with and without failure analysis of the dam for the Probably Maximum Flood (PMF), as well as the 50-, 100-, 200-, and 500-year frequency based storms and a sunny day failure scenario. The District just completed a similar study for Coyote Valley Dam in July 2009; the same mythology shall be used in this study. This report shall be made available to the contractor prior to the Fee Proposal due date. The Coyote Valley Dam study routed the flood hydrographs from Coyote Valley Dam, thru the Russian River watershed (1400 square miles) to it's terminus at the Pacific Ocean. The Russian River hydrology model developed for the Coyote Valley Dam study shall be used for this study, with modifications to the Dry Creek watershed (270 square miles). The Russian River hydrology model, as well as the flow data, precipitation data, GIS data, land use data, hydrologic models, and other data generated as part of the Coyote Valley Dam study shall be provided to the contractor for use in this study. Again, only the Dry Creek watershed shall require a detailed analysis, the existing Russian River hydrology model shall be used for the Russian River portion of the modeling effort. The hydrology model (HEC-HMS) will be calibrated and validated to the same historic data as the Coyote Valley Dam Study. Calibrated models will be used to model all of the events. The models will be run for with and without failure analysis of the dam for the 50-yr, 100-yr, 200-yr, 500-yr, and PMF events and a Sunny day failure scenario.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACAW07/Awards/W91238-10-D-0001-CP02.html)
 
Record
SN02134954-W 20100430/100428235403-539dc251910d9c202b84a42eecf42c25 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.