Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 01, 2010 FBO #3080
AWARD

Z -- RECOVERY--Z--PROJECT NUMBER 17530, Stillhouse Hollow Dam, TX Construct to Dewater Stilling Basin, Stillhouse Hollow Lake, TX

Notice Date
4/29/2010
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
USACE District, Fort Worth, PO Box 17300/819 Taylor Street, Fort Worth, TX 76102-0300
 
ZIP Code
76102-0300
 
Solicitation Number
W9126G-10-R-0053
 
Archive Date
7/12/2010
 
Point of Contact
ELIZABETH KELLEY, 817-886-1044
 
E-Mail Address
USACE District, Fort Worth
(elizabeth.j.kelley2@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912G-10-C-0048
 
Award Date
4/29/2010
 
Awardee
TTG UTILITIES, LP (835893439)<br> 231 MEMORIAL DR<br> GATESVILLE, TX 76528-1028
 
Award Amount
$58,826.00
 
Line Number
7001
 
Description
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): TTG Utilities, LP, W9126G-10-C-0048 This contract action was accomplished using other than competitive procedures because a statute exists that expressly authorizes or requires that the acquisition be made from a specific source or through another agency (FAR 6.302-5); specifically, Sole source awards under the 8(a) Program. Per FAR 6.302-5 a J&A is not required for this award. This is a special notice to inform the public of the use of the Recovery Act funds. RECOVERY: THIS NOTICE IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO 8(a) CONTRACTOR: TTG Utilities LLC This contract action was accomplished using Other Than Full and Open Competition under the authority of FAR 6.302-5(b)(4), Sole source awards under the 8(a) Program15 U.S.C. 637 and the Partnership Agreement dated 29 December 2009 between the U.S. Small Business Administration (SBA) and the Department of Defense (DoD). In an effort to preempt repairs this project is designed to facilitate inspection of the Stilling Basin and reduce risk of Basin failures. The contractor shall provide all labor, supervision, tools, transportation, equipment, and materials necessary to construct a watertight enclosure placed or constructed in waterlogged soil or under water and pumped dry so that construction or repairs can proceed under normal conditions and remove debris within the Stilling Basin and dewatered area at Stillhouse Hollow Lake, Texas. US Army Corps of Engineers 819 Taylor Street, Room 2A19 Fort Worth, Texas 76102-0300
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA63/W9126G-10-R-0053/listing.html)
 
Record
SN02135695-W 20100501/100429234709-7a516650791aae8640ec77feaa1ac9f7 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.