Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 08, 2010 FBO #3087
MODIFICATION

Y -- RECOVERY Non-Wilderness Log Trail Bridges

Notice Date
5/6/2010
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, EROC Northwest, 16400 Champion Way, Sandy, Oregon, 97055, United States
 
ZIP Code
97055
 
Solicitation Number
AG-0489-S-10-0316
 
Response Due
5/13/2010 11:59:00 PM
 
Archive Date
6/3/2010
 
Point of Contact
Patricia M. Mahurin, Phone: 5036681631, Jessica M. Wilson, Phone: 503-668-1707
 
E-Mail Address
pmahurin@fs.fed.us, jessicawilson@fs.fed.us
(pmahurin@fs.fed.us, jessicawilson@fs.fed.us)
 
Small Business Set-Aside
N/A
 
Description
Solicitation Amendment 0002 is written to: Change the magnitude of the construction project to read greater than $25,000 and less than $100,000. Extend the response due date to: May 19, 2010; 2pm Pacific Time Clarification to the details of the project as follows; Item one, Item one, Sill lengths: (a) Moffett Creek bridge, 72" sill length as Shown on Sheet 8. (b) Indian Henry bridge, utilize existing concrete sill. Shown on Sheet 9. It will not be necessary to remove existing sill or to fabricate a new sill. (c) All other bridges: Minimum length is "A+3" as Shown on Sheet 12. Item Two, Bulkhead dimensions (for all bridges where Bulkheads are specified): (a) Vertical dimension (height): The vertical extent of the bulkhead shall extend from the top of (and flush with) the decking to the center of the sill at minimum, (see Sheet 9). For most bridges, (see Sheet 13) the bottom edge of the bulkhead will extend to the bottom edge or elevation of the sill. (b) Horizontal dimension (length): The backwall (bulkhead) planks shall be sloped 1:1/4 to 1 or flatter (english notation) and shall be constructed in a manner that will protect the ends of the sills from contact with the approach fill. The overall length will depend on the height of the bulkhead and diameter of the stringer. Item Three, Thickness of Running Plank and Decking: Sheets 9 and 10 show 2x12 running plank thickness in plan view and 3x12 in end view. The correct dimension for running plank shall be 3x12 Rough Sawn. Sheet 12 does not show a dimension for decking plank thickness in the drawing. Decking planks shall be 3x12 Rough Sawn. All other information remains the same
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/ca2bdbaa9a1aaf0c8ce04859b73f2bca)
 
Place of Performance
Address: Mt. Hood National Forest, Sandy, Oregon, United States
 
Record
SN02141871-W 20100508/100506234537-ca2bdbaa9a1aaf0c8ce04859b73f2bca (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.