Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MAY 29, 2010 FBO #3108
MODIFICATION

Z -- RECOVERY-CNF Wastewater Improvements - Amendment 3

Notice Date
5/27/2010
 
Notice Type
Modification/Amendment
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
Department of Agriculture, Forest Service, EROC Southwest, 1323 Club Drive, Vallejo, California, 94592, United States
 
ZIP Code
94592
 
Solicitation Number
AG-9702-S-10-0383
 
Response Due
6/2/2010 2:00:00 PM
 
Point of Contact
Maria Yvonne Crist, Phone: (707) 562-8828
 
E-Mail Address
mycrist@fs.fed.us
(mycrist@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
Att 5 Specification - Concrete Reinforcement Att 4 Specification - Concrete Formwork Att 3 Specification - Demolition Attachment 2 Specification - Mobilization Att 1 - Revised Schedule of Items Amendment 3 SF 30 RECOVERY (ARRA) - The work consists of the Installation of four separate septic systems at the El Cariso Hot Shot Camp and the Replacement of the existing septic tank at the Silverado Fire Station. This project is funded by the American Recovey & Reinvestment Act (ARRA). Amendment 3 is included with this posting and Attachments 1 - 3. The purpose of this Amendment 3 is to 1) Revise and Replace the Schedule of Items (Att 1), 2) add Specification Section 01505 - Mobilization (ATT 2); Specification Section 02050 - Demolition (Att 3); Specification Section 03100 - Concrete Formwork (Att 4); and Specification Section 03200 - Concrete Reinforcement (Att 5) of this Amendment, add to the Request for Quote Documentation; and 3) Answers to Vendor's Questions that follow: Q)Can you tell me how the material testing and special inspections will be handled for the Recovery Cleveland National Forest Wastewater Improvements Project? Via the owner or the Contractor? A)All material testing and special inspections and quality control will be the responsibility of the contractor. Q)Are your requiring cleanouts every 50 feet? A)Cleanouts will be required to be installed AS SHOWN ON CONTRACT DRAWINGS and where the Uniform Plumbing Code 2006 with California amendments, requires they be installed for this type of sewer installation. BID SUBMITTAL DATE IS CHANGED FROM: June 2, 2010, 2:00 PM Pacific Time TO: June 4, 2010, 2:00 PM Pacific Time PLEASE FOLLOW SECTION L BID SUBMITTAL INSTRUCTIONS IN THE REQUEST FOR QUOTE PACKAGE. THE ONLY INFORMATION CHANGE IS THE BID SUBMITTAL DATE. BE SURE AND SUBMIT AMENDMENTS 1-3 SIGNED AND DATED WITH YOUR BID PACKAGE DOCUMENTS. Period of Performance: 06/15/2010 to 08/20/2010
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/453be258415a65e41e21b2a71b1d73d2)
 
Place of Performance
Address: Cleveland NF, 10845 Rancho Bernado Rd Ste 200, San Diego, California, 92127, United States
Zip Code: 92127
 
Record
SN02161786-W 20100529/100527234805-453be258415a65e41e21b2a71b1d73d2 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.