Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 02, 2010 FBO #3112
SOLICITATION NOTICE

Z -- RECOVERY: MUSSELLSHELL WORK CENTER -WATER SYSTEM IMPROVEMENTS PROJECT

Notice Date
5/31/2010
 
Notice Type
Presolicitation
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
Department of Agriculture, Forest Service, EROC Intermountain, 740 Simms Street, Golden, Colorado, 80401, United States
 
ZIP Code
80401
 
Solicitation Number
AG-82B1-S-10-0429
 
Archive Date
6/30/2010
 
Point of Contact
Elenita A. Siozon, Phone: 3032755752, William M. Pfeifer, Phone: 3039083120
 
E-Mail Address
easiozon@fs.fed.us, wpfeifer@fs.fed.us
(easiozon@fs.fed.us, wpfeifer@fs.fed.us)
 
Small Business Set-Aside
HUBZone
 
Description
RECOVERY: This contract action is being offered under the AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA). The resulting contract will utilized funds provided by the American Recovery and Reinvestment Act (ARRA) of 2009; interested parties are notiefied that the inclusion of unique provisions required in implementing the Act, including those for significant reporting and transparency, will be requiered of the successful bidder. The purpose of this announcement is to make notice that the USDA-Forest Service contemplates relasing a Solicitation Numbered AG-82B1-S-10-0429 on or about 15 June 2010 for the 3 Admin Water Supply Line Replacement-Musselshell Water Systems at Mussellshell Work Center, Idaho County, IDAHO-in the Clearwater National Forest. Contractor shall furnish all labor, materials, equipment, supervision, and transportation necessary to remove an existing building and the interior plumbing. Major items of work are as follows: (1) remove & dispose of an existing wooden bldg. & all interior plumbing, (2) install galvanized steel pipe, ball valves, unions, pressure gauge, pressure switch, vacuum valve, water meter, sample tap, hose bibb, check valv, captive air tank, iron filtration system, including the filter drain & appurtenances inside the contrete bldg. (3) install a 10'X14' GFP contrete bldg. (4) Install new HDPE & galvanized pipe to the existing distribution system. (5) and, Iinstall of electrical service conductors & interiror electrical system. The contractor shall install a concrete utility bldg., that will house a new captive air tanks, iron filtration systems, controls, valving, piping and electrical control to operate the existing well pump. PROJECT LOCATION: Mussellshell Work Center is located approximately 39 miles east of Orofino, Idaho. From Orofino, ID travel about 8 miles via Hwy 12 to Greer, ID then about 18 miles via Hwy 11 to Weippe, ID tehn approx 13 miles to the work center by Forest Hwy 100 & 535. GOVT COST ESTIMATE: Between $25,00 thru $100,000. PRE-BID/SITE VISIT: Mandatory for all Bidders; for more information call: Susan R. Graves at (208) 476-8207. All responsible sources may submit a quote which will be considered by the Government. In accordance with FAR 4.1102(a), prospective Offeror/Contractor(s) must be registered in the Central Contractor Registration (CCR) Data Base prior to award of the contract. SOLICITATION PACKAGE AND DRAWINGS WILL BE POSTED ON OR BEFORE 15 DAYS AFTER THIS PRE-SOLICITATION POSTING.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/e5bccbbb81b48eb42580f11071b4aeb7)
 
Place of Performance
Address: MUSSELLSHELL WORK CENTER, CLEARWATER NATIONAL FOREST, 12730 HIGHWAY 12, OROFINO, Idaho, 83544, United States
Zip Code: 83544
 
Record
SN02164403-W 20100602/100531233026-e5bccbbb81b48eb42580f11071b4aeb7 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.