Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 11, 2010 FBO #3121
SOLICITATION NOTICE

Z -- RECOVERY: Lochsa Powell Pavement Rehabilitation, Clearwater NF

Notice Date
6/9/2010
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, EROC Intermountain, 740 Simms Street, Golden, Colorado, 80401, United States
 
ZIP Code
80401
 
Solicitation Number
AG-82B1-S-10-0440
 
Point of Contact
Rita J. Loper, Phone: 2087657497, Chuck Fowlds, Phone: 208.476-8369
 
E-Mail Address
rloper@fs.fed.us, cfowlds@fs.fed.us
(rloper@fs.fed.us, cfowlds@fs.fed.us)
 
Small Business Set-Aside
N/A
 
Description
THIS IS AN AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) PROCUREMENT. The resulting contract will utilize funds provided by the AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) OF 2009. Interested parties are notified that the inclusion of unique provisions required in implementing the Act, including those for significant reporting and transparency, will be required of the successful bidder. The purpose of this announcement is to make notice the Forest Service contemplates releasing an Invitation for Bid (IFB) on or about June 24, 2010. If the IFB is released, it will be released through this FedBizOpps website, and prospective vendors should visit this FedBizOpps website from time to time on or after June 24, 2010 to obtain a copy of the solicitation. This requirement is being solicited as an IFB under FAR Part 14. Bids are due at July 23, 2010; 12:00 P.M. (MT). A single firm-fixed price type contract will be awarded to the responsible bidder based upon price and price related factors. ALL Sealed Bid SHOULD BE MAILED TO: USDA/FOREST SERVICES ATTN: PHYLLIS R. COBURN-HARRIEL 740 SIMMS ST GOLDEN, CO 80401 REF SOL#: AG-82B1-S-10-0424 PROJECT DESCRIPTION. This project consists of asphalt repair with surface preparation and asphalt placement. Work includes skin patch, repair potholes and crack sealing with and without routing. Install corrugated metal pipe, including excavation, removal and disposal of unsuitable material. Chip seal, and asphalt pavement sealcoat. The magnitude of this project IAW FAR 36.204 (c) is between $500,000 and $1,000,000. There will not be a pre-bid meeting/site visit held on this project. Projected start date is July 2010 with completion not later than October 30, 2010 Performance and Payments will be required per the Miller Act and Davis-Bacon wage rates will apply. PROJECT LOCATION. Project #1, Powell Ranger Station is located at MP – 161.78 off US Highway 12. From Orofino, Idaho travel east on highway 12 to mile post 161.78 and junction of Powell Ranger station. Follow signs to ranger station (approximately 1 mile). Project #2, Powell Access Road is Located at MP – 161.78 off US Highway 12. Project #3, Powell Campground is located off the Powell Ranger Station road. Project #4, Wendover Campground is located at MP – 158.22 on US Highway 12 on the right. Project #5, Wilderness Gateway Campground is located at MP – 122.63 on US Highway 12. (Additive Item ) Whitehouse Campground is located at MP – 158.50 on US Highway 12.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/812fcfeff36975bddf0617c2617d781e)
 
Place of Performance
Address: Powell and Lochsa Ranger Districts, Clearwater National Forest, United States
 
Record
SN02172933-W 20100611/100609235356-812fcfeff36975bddf0617c2617d781e (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.