MODIFICATION
60 -- Network Cable Infrastructure Installation
- Notice Date
- 6/10/2010
- Notice Type
- Modification/Amendment
- NAICS
- 238210
— Electrical Contractors and Other Wiring Installation Contractors
- Contracting Office
- Department of Justice, Justice Management Division, Executive Office for the United States Attorneys-EOUSA, 600 E Street, Suite 2400, Washington, District of Columbia, 20530
- ZIP Code
- 20530
- Solicitation Number
- DOJ-REQ-EOA02-10-0091
- Archive Date
- 6/29/2010
- Point of Contact
- Tony Russell,
- E-Mail Address
-
tony.russell@usdoj.gov
(tony.russell@usdoj.gov)
- Small Business Set-Aside
- N/A
- Description
- Another question has come up in reference to clarification of the following SOW. Please ensure that everything that is require a cost is applicable to your pricing and please total up your cost in all of the pricing remember your pricing should come from GSA schedule 70. Question: Approximately 15 - 35 USAOs relocate or undergo major renovations each year. Offices can range in size from a small branch office servicing as few as four (HOW DO YOU GIVE A COST ESTIMATE IF THIS IS UNKNOWN)or five users to entire headquarters offices supporting several hundred users.(AGAIN SAME SITUATION) Some relocation tasks are very large efforts and some are small but all relocations are complex, requiring extensive planning, solid analysis and effective cost control. All require coordination and the ability to meet the needs and schedules of the USAO’s. The contractor must be prepared to execute, often on short notice, the relocations or cable requirements in the specified time frame to ensure that no delay in the USAO project schedule occurs. Contractors cannot price the above statement because it’s not clear as to size. Quantify which one are small and which ones are large can’t price because it’s undetermined. Should the contractor give a cost for 15 or 30 it’s unclear. I want to ensure that we are doing apples to apples and everyone is on the same sheet of music as to what is required. Answer: Suggest using 1 large city say West Coast 1 Med city ( East) and 1 overseas site.. doesn’t really matter the site or the drop numbers as long as everyone prices the same site/equipment and drops So say for example LA Site consisting of expansion of 3 floors with 1 IDF ( which means a RACK and fiber to the MDF, and Patch Panel(s)) Say 250 drops V and D Longest drop 282 ft Fiber run approx 153 feet thru chase in internal to USAO space telephone closet Avg drop length is 122 feet IDF has 200 drops going to 2 racks in IDF 1 V and 1 Data. Need 2 96 port patch panels and another 24pt. All drops are run thru conduit above ceiling. I don’t know off the top of my head if union labor is required in LA.. I am guessing it is. … you know than do the same for 2 other diverse places and see what the cost for doing them are
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOJ/JMD/EOUSA-FMSS/DOJ-REQ-EOA02-10-0091/listing.html)
- Place of Performance
- Address: Multiple Locations, United States
- Record
- SN02174512-W 20100612/100610235432-70f277b12ec1d9fec723258d56d4bbad (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |