Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 18, 2010 FBO #3128
SOLICITATION NOTICE

J -- REPAIR AND UPDATE RESISTANCE WELDER

Notice Date
6/16/2010
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
333992 — Welding and Soldering Equipment Manufacturing
 
Contracting Office
NASA/Glenn Research Center, 21000 Brookpark Road, Cleveland, OH 44135
 
ZIP Code
44135
 
Solicitation Number
NNC10343855Q1
 
Response Due
6/25/2010
 
Archive Date
6/16/2011
 
Point of Contact
Sandra A Brickner, Contract Specialist, Phone 216-433-6093, Fax 216-433-5489, Email sandra.a.brickner@nasa.gov
 
E-Mail Address
Sandra A Brickner
(sandra.a.brickner@nasa.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
This notice is a combined synopsis/solicitation for commercial items prepared inaccordance with the format in FAR Subpart 12.6, as supplemented with additionalinformation included in this notice. This announcement constitutes the onlysolicitation; offers are being requested and a written solicitation will not be issued. This notice is being issued as a Request for Quotations (RFQ) for a Qty 1, Repair andUpdate of an existing NASA/GRC owned Resistance Projection/Spot Welding Machinemanufactured by Sciaky, Inc.Statement of Work/Specifications:Repair and update Government owned Resistance Projection Spot Welder ModelEPTMP2-50-150-12, Serial Number 11369, manufactured by Sciaky, Inc. with a new responsecontroller. This service shall include installation and informal training of government operator andmaintenance personnel.The offerer shall be responsible for the travel and livingexpenses of field service personnel.A. Synchronous Micro-Processor Control - General Requirements:This control shall be synchronous and will employ solid state circuitry.1. The Controller shall include: NEMA Output safety relays Automatic power factor Power supply cabinet Microcomputer control systems 75 weld schedule memory Photo-optically isolated inputs Electronic memory, no batteries required Fault display and disables for transformer over temperature. Water saver circuit (conserves water and provides automatic shut off during tipreplacement) Six water-cooled SCR contactor panel 250 - 400 Amp three phase circuit breaker2. The control will be equipped with a two-stage foot pedal - the first stage to applyforce to the electrodes and the second stage to initiate the welding sequence.3. This control shall positively insure: Each operation cycle or pulse of secondary current shall be uniform in amplitude andtime duration, as programmed. The firing of the SCR's shall be in precise relation with the supply voltage toguarantee that no transient currents are produced on either the primary or secondary Timing control functions shall be programmed in cycles of the line frequency, withoutdeviation from the programmed value Touch pad switches shall be provided to program the timing and counting functions The system shall automatically direct the operator to program the proper functions forthe machine mode he requires4. The control shall display system status and any diagnostic messages of alarmconditions. At least the following diagnostic messages shall be included:a. Transformer over temperature.b Rectifier over temperature.c. Water not flowing.d. Emergency stop.e. Tip force is low5. The micro-processor shall have capability of storing up to 75 complete weld schedules.6. The micro-processor shall incorporate a quartz crystal timing reference for absoluteaccuracy of programmed functions.7. The micro-processor shall incorporate a back-up system that will retain the datastored in the memory, no batteries required, file if the machine is shut off or if thereis a main power supply failure.8. The control shall include anti-arcing circuitry, which will prevent arcing of theelectrode tips if very short 'hold' times are used.9. A complete drawing of all components and wiring for the update specific to thegovernment-owned welding machine shall be provided. B. Synchronous Micro-Processor Control - Specific Requirements:1. The micro-processor control shall provide for selection of sequence parameters andtiming functions. A display shall be provided to communicate with the operator andassist in programming the control.2. The control shall provide for programming of preparatory functions.The available force modes shall include constant Low force, constant high force, and variable force.3. The control shall provide pre-programmed automatic weld cycles using defaultparameters. 4. The control shall have the following functions, programmed over the ranges listed:Precompression - 0 to 99 cyclesSqueeze - 0 to 99 cyclesPreheat - 0 to 99 impulsesWeld - 0 to 99 impulsesQuench - 0 to 99 cyclesTemper - 0 to 99 impulsesHold - 0 to 99 cyclesOff - 0 to 99 cycles5. The following sub-functions shall be programmed to occur during the Preheat, Weld, andTemper Intervals:Cool - 0 to 99 cyclesHeat - 0 to 99 cyclesHeat Current Adjust - 0 to 99 percentCurrent Decay - 0 to 99 cyclesCurrent Decay Current Adjust - 0 to 99 percent6. The control shall have the following internal switch adjustments available toauthorized maintenance personnel:a. Automatic voltage control (AVC) - On or Offb. Valve delay - the actual mechanical delay in the operation of the forge valve shall beable to set (in milliseconds) to insure that the forge initiation point selected will beexactly as programmed.7. The rectifier cabinet shall contain water-cooled silicon controlled rectifiers, andassociated circuitry. 8. The SCR contactors shall contain over-current and over-voltage protective circuits toprevent SCR failure due to improper settings, operating on open circuit, or machinemalfunction.9. The unit shall maintain the welding current within plus or minus 2% for a variation ofthe line voltage of plus or minus 10%. C. General requirements:1. All wiring and sub-assembly units shall exhibit maximum accessibility.2. All control wiring shall be multi-stranded.3. All wiring shall be in accordance with the best commercial practice and comply withapplicable safety codes. 4. Two (2) operator manuals shall be furnished with the machine. This manual shallinclude schematic drawings, wiring lists, spare parts list, a technical description ofthe operation of the circuits in the control, as well as maintenance information andschedulesMust be delivered on or before September 15, 2010The provisions and clauses in the RFQ are those in effect through FAC 2005-41. This procurement is a total small business set-aside. See Note 1. The NAICS Code and the small business size standard for this procurement are 333992, and500 employees, respectively. The offeror shall state in their offer their size status forthis procurement. All responsible sources may submit an offer which shall be considered by the Agency. Allcontractural and technical questions must be in writing (e-mail or fax) to SandraBrickner not later than June 23, 2010. Telephone questions will not be accepted.Delivery to NASA Glenn Research, 21000 Brookpark Road, Cleveland, OH 44135 is required. The DPAS rating for this procurement is DO-C9. Offers for the items(s) described above are due by June 25, 2010, COB, and may be emailedto Sandra.A.Brickner@nasa.gov or faxed to (216) 433-5489 and must include, solicitationnumber, proposed delivery schedule, discount/payment terms, warranty duration (ifapplicable), taxpayer identification number (TIN), CAGE code, DUNS Number, identificationof any special commercial terms, and be signed by an authorized company representative. Offerors shall provide the information required by FAR 52.212-1 (JUNE 2008), Instructionsto Offerors-Commercial Items, which is incorporated by reference. If the end product(s) offered is other than domestic end product(s) as defined in theclause entitled 'Buy American Act -- Supplies,' the offeror shall so state and shall listthe country of origin. FAR 52.212-4 (MAR 2009), Contract Terms and Conditions-Commercial Items is applicable. FAR 52.212-5 (JUNE 2008), Contract Terms and Conditions Required To Implement Statutes orExecutive Orders-Commercial Items is applicable and the following identified clauses areincorporated by reference: 52.219-6 Notice of Total Small Business Set-aside 19.508(c),52.219-28 Post Award Small Business Program Representation 19.308(d), 52.222-3 ConvictLabor (JUN 2003) (E.O. 11755), 52.222-19 Child Labor -Cooperation with Authorities andRemedies (AUG 2007) (E.O. 13126), 52.222-21 Prohibition of Segregated Facilities (FEB1999), 52.222-26 Equal Opportunity (MAR 2007)(E.O. 11246), 52.222-50 CombatingTrafficking in Persons (AUG 2007) (Applies to all contracts), 52.225-1 Buy American Act-Supplies (JUN 2003) (41 U.S.C. 10a-10d), 52.225-13 Restrictions on Certain ForeighPurchases 25.1103(a), 52.232-33, Payment by Electronic Funds Transfer - CentralContractor Registration. The FAR may be obtained via the Internet at URL:http://www.acquisition.gov/far/index.html The NFS may be obtained via the Internet at URL:http://www.hq.nasa.gov/office/procurement/regs/nfstoc.htm All contractual andtechnical questions must be in writing (e-mail or fax) to the attention of SandraBrickner at NASA Glenn Research not later than June 23, 2010. Telephone questions willnot be accepted. Selection and award will be made to that offeror whose offer will be most advantageous tothe Government, with consideration given to the factors of proposed technical merit,price, delivery, and past performance. It is critical that offerors provide adequatedetail to allow evaluation of their offer. (SEE FAR 52.212-1(b)). Offerors must include completed copies of the provision at 52.212-3 (AUG 2009), OfferorRepresentations and Certifications - Commercial Items with their offer. These may beobtained via the internet at URL:http://rcb.cancer.gov/rcb-internet/SAP/52-212-3plusadd.pdf. Theserepresentations and certifications will be incorporated by reference in any resultantcontract. An ombudsman has been appointed -- See NASA Specific Note 'B'. Prospective offerors shall notify this office of their intent to submit an offer. It isthe offeror's responsibility to monitor the following Internet site for the release ofsolicitation amendments (if any):http://prod.nais.nasa.gov/cgi-bin/eps/bizops.cgi?gr=D&pin=22. Potential offerorswill be responsible for downloading their own copy of this combinationsynopsis/solicitation and amendments (if any). Any referenced notes may be viewed at the following URLs linked below. http://genesis.gsfc.nasa.gov/nasanote.html
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/NASA/GRC/OPDC20220/NNC10343855Q1/listing.html)
 
Record
SN02179377-W 20100618/100616235121-1921fa2af143d7b2b9d2f29cec2eb54e (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.