MODIFICATION
35 -- Ingersoll Rand 20 HP Rotary Screw Air Compressor and components
- Notice Date
- 6/28/2010
- Notice Type
- Modification/Amendment
- NAICS
- 333912
— Air and Gas Compressor Manufacturing
- Contracting Office
- Department of the Air Force, Air Mobility Command, 60th CONS, 350 Hangar Ave. Bldg 549, Travis AFB, California, 94535-2632, United States
- ZIP Code
- 94535-2632
- Solicitation Number
- F3ZT900119A002
- Archive Date
- 7/15/2010
- Point of Contact
- Elizabeth A Squires, Phone: 707-424-7761, Josephine G Cobb, Phone: (707) 424-7720
- E-Mail Address
-
elizabeth.squires@travis.af.mil, josephine.cobb@travis.af.mil
(elizabeth.squires@travis.af.mil, josephine.cobb@travis.af.mil)
- Small Business Set-Aside
- N/A
- Description
- This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. The solicitation number is F3ZT900119A002; this solicitation is a request for quotation. This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular Fac 2005-41, Effective 13 May 2010 and Defense DCN 20100608 Last Update: 8 June 2010, and the Air Force Acquisition Circular 2010-0402 Effective 2 April 2010. This acquisition will be a brand name purchase for Ingersoll Rand, please see attached letter. North American Industry Classification System (NAICS) code is 333912. The Federal Supply Class (FSC) is 4310. The Standard Industrial Classification (SIC) is 3563. All items must be delivered, installed, invoiced and paid no later than midnight on 30 September 2010. 0001 -0002: 2 EA: Ingersoll Rand 20 HP Rotary Screw Air Compressor with the following components; capacity 83cfm @ 125 PSIG (165 cfm total); maximum operating pressure 125 PSIG; outlet size 1.0" NPT 52"x 36" x 42.5" Baseplate (installation and wiring included in turnkey installation cost). 0003-0004: 1 EA: Ingersoll Rand X41 Controller with the following components; Single point pressure control, Programmable sequence, schedule and pressure profile, Priority sequence control Multiple pressure profiles, Real time programming, Anti-cycling control, Standby and system pre-fill functionality Power outage restart Controls up to 4 rotary or reciprocating compressors, Controls IntelliSys, non-IntelliSys and non-Ingersoll Rand Compressors, Controls from one common system pressure, Universal interface: 1 per compressor Manages Nirvana 7.5 - 40 hp (5.5 - 30 kW) VSD compressors, NEMA 12 / IP54 Enclosure, 50/60 Hz standard (Installation and wiring included in turnkey installation cost) 0005-0006: 1 EA: Air Tank with the following components; 120 Gallon, Design Pressure: 200 Psi Dimensions: (Dia x L) - 24" x 69" 120 Gallon, 200 Psig Vertical Tank, 1 PNLD16 Kit,.5" 200PSI @ 457CFM Safety Relief Valve, Pressure Gauge, and Pneumatic No-Loss Drain, Valve included. (Installation and wiring included in turnkey installation cost) 0007-0008: 1 EA: Breathing Air Purifier with the following components; Purification Stages 6,Inlet Flowrate @ 7 bar g (100psi g) 40 l/s, 88cfm, Outlet Flowrate @ 7 bar g (100psi g) 33 l/s, 70 cfm Complies with USA standard CGA G7.1-1997, OSHA Grade D breathing air(Installation and wiring included in turnkey installation cost) 0009-0010: 1 EA: Electrical wiring, Relays, breathing air piping, interconnections, decals, supports. 0011-0012: 1 EA: Freight for materials delivery 0013-0014: 7 EA: Hazard notification: Lights and alarms sets (requires 7 sets) Yellow strobe lights suitable for hazardous locations, explosion proof. One light per paint booth (4 paint booths), one light per blast room, one light paint mixing room and one light located in the supervisors office. (Installation and wiring included in turnkey installation cost) 0015-0016: 7 EA: Hazard Notification: Audible alarms suitable for hazardous locations. One device per paint booth (4 paint booths), one per blast room, one device paint mixing room and one device located in the supervisor's office. (Installation and wiring included in turnkey installation cost) 0017-0018: 1 EA: Breathing Air Calibration kit: Kit for vendor specific calibration of breathing air system. 0019-0020: 1 EA: Carbon Monoxide Monitor: Digital carbon monoxide monitor continuous monitoring of the sample air, continuous LCD display of gas and vapor concentrations, menu driven operational and maintenance controls, menu driven calibration procedure, audio and visual alarms indicate unsafe conditions, alarm relay contacts available on terminals, a fault relay and visual fault alarm, low air flow fault indication and display, alarm acknowledgement capability including audio defeat, mA outputs for each target gas. (Installation and wiring included in turnkey installation cost) 0021-0022: 16 EA: Breathing Air Hose 25 foot air hose (4-reels each large drive through paint booths, 2-each small equipment paint booths, 2-each blast room, 2-each paint mixing room.). These air hoses specifically designed for breathing air with dedicated coupler fittings for breathing air only. (Installation and wiring included in turnkey installation cost). 0023-0024: 16 EA: Breathing Air Hose Reel sets Spring Rewind hose reels (4-reels each large drive through paint booths, 2-each small equipment paint booths, 2-each blast room, 2-each paint mixing room.). These reels are specifically designed for breathing air with dedicated coupler fittings for breathing air only. (Installation and wiring included in turnkey installation cost). 0025-0026: 5 EA: Bullard Blast helmet for protection during plastic media blasting. Wide-angle face shield lens and headband suspension positioned for optimum visibility Translucent yellow helmet so workers don't experience a closed-in feeling, Optional climate control assemblies can warm or cool incoming air to maximize comfort and improve productivity, No fit testing Assigned Protection Factor (APF) of 1,000 Available with a wide variety of capes. 0027-0028: 150 EA: Provide breathing air adaptering connectors that will connect to 3M 7800 series respirator. 3M 7800 Respirator Part sets: 3M Breathing Tubes 0029-0030: 150 EA: Provide breathing air adaptering connectors that will connect to 3M 7800 series respirator. 3M 7800 Respirator Part sets: 3M Adapters W-3188. 0031-0032: 350 EA: Provide breathing air adaptering connectors that will connect to 3M 7800 series respirator. 3M 7800 Respirator Part sets: 3M Full Face Plugs 7890 0033-0034: 150 EA: Need Bullard CC20 Series Hoods for painting operations. Approved by NIOSH for use in Type C applications OSHA Assigned Protection Factor (APF) of 1,000 No fit testing required. 0035-0036: 1 EA: Inline Filters and connection manifolds: Supply all inline filters and connection manifolds at each booth and at compressor. (Installation and wiring included in turnkey installation cost). 0037-0038: 1 EA: Freight and shipping for airline respirator hoods, adapters, filters. Cost split between C-5 & C-17 Cost Centers. 0039-0040: 1 EA: Complete the turn key installation of the above equipment. The installation includes the following: All labor, equipment, piping, fittings, hardware, concrete pad (compressor location), compressor cover, and electrical to complete the installation. Air sampling and training on all equipment. Complete installation as stated and in the Statement of Work. 0041-0042: 1 EA: Freight for Air Pumps 0043-0044: 2 EA: Portable Breathing Air Unit: Pneumatic driven, oil-less ambient air breathing pumps. Features a corrosion resistant, stainless steel air motor. Overall Dimensions: Length 21" Width 13" Height 16" Unit Weight: 90 lbs. Minimum Compressed Air Supply required: 40 cfm at 80 psi Ambient Air Delivery: 12 cfm at 12 psig, Air Filtration: HEPA Rated (Particulate), Metal Base Frame and Enclosure for Protection, Manually adjusted Air Regulator Valve, De-Icing Motor Exhaust Muffler and Outlet Manifold Color-Coded Air Pressure Gauge, Factory set Pop-off Relief Valve prevents over-speeding Built-in Storage Mount for detachable Inlet Filter Extension Direct Drive Motor and Pump connection. No Belt adjustment. Built-in Lifting Slots for single person transport Large Instruction Decals Tough Powder Coated Finish Inlet Compressed Air Filter with Manual Drain Valve. The Air Pumps would require the use of the USAF inventoried MC-7 Portable Air Compressor to supply power. (Installation and wiring included in turnkey installation cost). 0045-0046: 1 EA: Portable Breathing Air Unit Trailer: The trailer is, four wheeled, two axle automotive type steering vehicle capable of transporting loads up to 5,700 pounds. The trailer is designed for temporary transportation of a variety of equipment. The portable unit will be supplied with a protective cover that is easily removable. The unit will supply breathing air for up to 4 people and have 4-breathing air hose reels with 100 feet of breathing air line for each operator. 0047-0048: 1 EA: Freight For portable breathing air system trailer. 0049-0050: 4 EA: Breathing Air Hose Reel sets Spring Rewind hose reels for 100 feet of air line hose These reels are specifically designed for breathing air with dedicated coupler fittings for breathing air only. (Installation and wiring included in turnkey installation cost). 0051-0052: 1 EA: Freight for Breathing Air hose reels. 0053-0054: 4 EA: Breathing Air Hose 100 foot of breathing air quality air hose with dedicated couplers. These air hoses specifically designed for breathing air with dedicated coupler fittings for breathing air only. (Installation and wiring included in turnkey installation cost). 0055-0056: 1 EA: Carbon Monoxide Monitor: Continuous monitoring of the sample air, continuous LCD display of gas and vapor concentrations, menu driven operational and maintenance controls, menu driven calibration procedure, audio and visual alarms indicate unsafe conditions, alarm relay contacts available on terminals, a fault relay and visual fault alarm, low air flow fault indication and display, alarm acknowledgement capability including audio defeat, mA outputs for each target gas. Will have both visual and audible alarms, once triggered airflow would cease. (Installation and wiring included in turnkey installation cost). 0057-0058: 1 EA: Freight for breathing Air Hose and CO monitor. 0059-0060: 1 EA: Delivery for equipment mounted and breathing air trailer. 0061-0062: 1 EA: Turnkey installation of all componants on trailer. Equipment mounting, cover for equipment, piping, mounting bracket fabrication, wiring and msc materials. This award will be made aggregate all or none. The following provisions and/or clauses apply to this acquisition. Offerors must comply with all instructions contained in FAR 52.212-1 Instructions to Offerors -- Commercial Items. FAR 52.212-2 Evaluation -- Commercial Items (Jan 1999): (a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers: 1: technical capability of the item offered to meet the Government requirement as stated in the above item descriptions 2:Price. FAR 52.212-3 Alt I Offeror Representations and Certifications - Commercial Items. FAR 52.212-4 Contract Terms and Conditions - Commercial Items will be incorporated into any resultant Purchase Order by reference. FAR 52.212-5 (Dev) Contract Terms and Condition Required to Implement Statues or Executive Orders-Commercial Items (Deviation). FAR 52.222-21 Prohibition of Segregated Facilities; FAR 52.222-26 Equal Opportunity; FAR 52.222-36 Affirmative Action for Workers with Disabilities. FAR 52.222-35 Equal Opportunity for Disabled Veterans; FAR 52.222-37 Employment Reports on Special Disabled Veterans; FAR 52.203-6 Restrictions on Subcontractors (Alt I); FAR 52.204-4 Printed on Copied Double Sided or Recycled Paper; FAR 52.219-8 Utilization of Small Business Concerns; DFARS 252.225-7012 Preference for Certain Domestic Commodities; DFARS 252.209-7001 Disclosure of Ownership or Controlled by the Gov't; DFARS 252.209-7004 Subcontracting with Firms That Are Owned or Controlled by the Government of a Terrorist Country; DFARS 252.212-7000 Offeror Representations & Certifications - comm'l Items. FAR 52.222-50 Combating Trafficking in Persons. FAR 52.233-4 Applicable Law for Breach of Contracts. DFARS 252.204-7003 Control of Government Personnel Work Products. DFARS 252.211-7003 Item Identification and Validation. DFARS 252.225-7001 Buy American Act and Balance of Payment Program. DFARS 252.225-7002 Qualifying Country Sources as Subcontractors.DFARS 252.232-7003 Electronic Submission of Payment Request. DFARS 252.247-7023 Alt III Transportation of Supplies by Sea, Alternate III.FAR 52.222-41 Service Contract Act of 1965 FAR 52.222-42 Statement of Equivalent Rates for Federal Hires Statement of Equivalent Rates for Federal Hires (May 1989) In compliance with the Service Contract Act of 1965, as amended, and the regulations of the Secretary of Labor (29 CFR Part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5332. This Statement is for Information Only: It is not a Wage Determination Employee Class Monetary Wage -- Fringe Benefits 25190 Ventilation Equipment Tender-WG-5 Step 1 $20.51 + 34.35% The wage determination used for this procurement can be found at http://www.wdol.gov/. The revision used is WD 05-2069 Rev.8 date 2 June 2009. FAR 52.204-9 Personal Identity Verification of Contractor Personnel FAR 52.219-28 Post-Award Small Business Program Representation. FAR 52.203-3 - Gratuities FAR 52.252-2 Clauses Incorporated by Reference, with the following two fill-ins: http://www.arnet.gov/far and http://farsite.hill.af.mil. FAR 52.252-6 with the following fill-in: Defense Federal Acquisition Regulation 48 CFR Chapter 2. DFARS 252.212-7001 (Dev) Contract Terms and Conditions Deviation. AFFARS 5352.223-9000 Elimination of Use of Class I Ozone Depleting Substance. AFFARS 5352.201-9101 Ombudsman. Clauses may be accessed electronically in full text through http://farsite.hill.af.mil. Contractors must be actively registered with the Central Contractor Registration (CCR) at http://www.ccr.gov, at Wide Area Work Flow (WAWF) at http://wawf.eb.mil, and at Online Representations and Certifications Application (ORCA) at http://orca.bpn.gov. Please send any questions to elizabeth.squires@travis.af.mil or fax to 707-424-5189 NO LATER THAN 16 June 2010, 4:30 PM, PST and offers NO LATER THAN 30 June, 12:00 PM, PST. Alternate POC is Josephine Cobb, Contracting Officer, telephone 707-424-7720. Verbal requests will not be accepted. Offerors must provide written acknowledgement of any and all amendments to this solicitation with your offer. Otherwise, offer may not be considered for award.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AMC/60CONS/F3ZT900119A002/listing.html)
- Place of Performance
- Address: 60th Maintenance Squadron, Travis AFB, California, 94535, United States
- Zip Code: 94535
- Zip Code: 94535
- Record
- SN02190300-W 20100630/100628235313-851c08eebbdd0c02d12ee9612b31602c (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)