Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 11, 2010 FBO #3151
SOURCES SOUGHT

99 -- Modular Exhibit Display System

Notice Date
7/9/2010
 
Notice Type
Sources Sought
 
Contracting Office
US Army, Army Contracting Command, Joint Munitions and Lethality (JM&L) Contracting Center, Picatinny Arsenal, New Jersey 07806-5000
 
ZIP Code
07806-5000
 
Solicitation Number
W15QKN-10-X-0366
 
Response Due
7/23/2010
 
Archive Date
8/22/2010
 
Point of Contact
Anthony Michael, Contract Specialist, (973)724-3432
 
E-Mail Address
Anthony Michael
(michael.anthony7@us.army.mil)
 
Small Business Set-Aside
N/A
 
Description
The U.S. Army Joint Munitions & Lethality Contracting Center, Army ContractingCommand, Picatinny Arsenal, NJ in support of Armament Research, Development, and Engineering Center (ARDEC), Picatinny Arsenal is currently seeking qualified sources to provide the following: A modular system that can be reconfigured time after time to graphically and physically support multiple venues as required. The ability to create (3) 10 x 10 displays or (1) 30 x30 or 20 x 20 display(s) from the same system is required. All basic framing must be lightweight (round or square) and have a channel-style construction that lends itself to multiple uses and functions and must be easy to assemble/disassemble. All materials must be considered reliable, durable and known to reflect a professional, high tech, and polished image. Modularity multiple exhibit configurations must be achievable by this single system of modules. Standard heights must be attainable by the system to comply with normal convention center event standards. Back wall modules, counter modules, storage modules, graphics modules; lighting options, media support options, islands, shelves, fabric canopies/rotating marquis(only on 20 x 20 or 20 x 30 or 30 x 30) all must be reconfigurable to support exhibit sizes including: 10 x 10,10 x 20, 20 x 20, 20 x 30,10 x 30, and 30 x 30. Storage Compartments/Modules exhibit system must include at least (2) event storage areas that can accommodate excess literature, standard size posters, supplies, giveaways, etc. Multimedia support exhibit system must be able to support (4) 46 LCD TVs that will include power and wire management and sustain the appropriate weights for LCD TVs within that standard dimension. Additionally, the exhibit system must be able to support or be configured to allow for (4) computer kiosks for interactive uses. Shelving reconfigurable, high quality, durable shelving is required to support static displays with options for variable/multiple heights and multiple lengths. Islands (2) light weight, graphic supportable islands that are sturdy and have the options for different colors and shapes are required. Chairs (6) chairs to include (4) standard height and (2) high-table chairs are to be provided in colors and designs that match the exhibit. Literature Racks and Giveaway Bins (12) matching literature racks are to be provided and (3) giveaway bins of various sizes. Lighting: Multiple lighting options are requested to support multiple configurations with a preference placed upon LED lighting options. All lights must meet current fire codes and shall include the appropriate light bulb spares and wiring extensions to support multiple configurations. Carpeting/Padding: Carpeting and Padding options to support all reconfigurable options must be included in system. Rotating Marquis/Fabric Canopies/Fabric Structures exhibit system must include at least (1) graphically supportable rotating marquis (for use on 20 x 20, 20 x 30 or 30 x 30), and multiple canopy or structure options. Spares - all parts considered to be consumable or easily lost must be identified as such and an adequate inventory (list) of spares must established and provided. Replacement Parts - All parts/components of the system must be able to be replaced within (2) working days if broken or lost within the standard warranty time limits. Training Complete training on all uses, configurations, operations, assembly, disassembly, maintenance, packing, and shipping is required prior to delivery or acceptance of system. A complete and comprehensive training manual or brief is required. Storage and Service Options Display system storage options at a vendor-owned facility must be available w/in a 20 mile radius of Picatinny Arsenal, NJ and be able to access Picatinny Arsenal with onsite support/service as needed. This effort requires a company that has a full service trade show booth manufacturer both locally and has international presence. Company must be ISO 14001 certified. Graphics Quality Fabric graphics must be supportable in the form of dye-sublimination using quality processes and industry standard or better fabrics. Future Expansion the display system must have an open architecture for future improvements and new styles of display technology. Customer Support - Graphics must have a (15) working day turnaround (delivery) after art proof approval on all display configuration sizes. Graphics must be easily installed when practicable. Easy assembly and disassembly instructions must accompany the display system for each configuration provided. Intuitive assembly/disassembly instructions must be reproducible by the US Army at no cost. The product must be assembled and disassembled using a single T-Handle tool for the modular system. All parts must be clearly labeled by part and packaging and water resistant labeling is required. Assembly of a 10 x 10 display must be accomplished by a 2-person team in under two hours. The modular exhibit and display system and all of its components must be packaged using commercially acceptable and professional-grade packing materials designed for repeated use and ease. The storage system must be organized, protective, lightweight, match or exceed industry norms for size and adhere to all standard freight dimensions and standards. All information is to be submitted at no cost or obligation to the Government; information provided will not be returned. Firms with the capability of provided the above described Modular System should provide a summary of their companies abilities to provide such a system including a description of their facilities, personnel and past performance to this requirement via email, no later than COB 23 July 2010. Telephone inquiries will not be accepted. The point of contact for this action is Mr. Michael Anthony, Contract Specialist, CCJM-CA, 973-724-3432. Email your questions to michael.anthony7@us.army.mil. This is a sources sought/market survey announcement only and should not be construed as a request for proposal or a commitment by the U.S. Government. The U.S. Government does not intend to award a contract on the basis of this market survey. A formal solicitation is anticipated and a solicitation notice will be published at a later date with more detailed requirements provided.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/f7f1313e012d673299dc07cddf35ebde)
 
Record
SN02201300-W 20100711/100709235336-f7f1313e012d673299dc07cddf35ebde (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.