Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 17, 2010 FBO #3157
SOLICITATION NOTICE

J -- CORRISION INSPECTION OF TWIN OTTER AIRCRAFT N48RF

Notice Date
7/15/2010
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
488190 — Other Support Activities for Air Transportation
 
Contracting Office
Department of Commerce, National Oceanic and Atmospheric Administration (NOAA), Eastern Region Acquisition Division-KC, 601 East 12th Street, Room 1756, Kansas City, Missouri, 64106, United States
 
ZIP Code
64106
 
Solicitation Number
WC133M-10-RQ-0801
 
Archive Date
8/13/2010
 
Point of Contact
Sharon Clisso, Phone: 816-426-7471
 
E-Mail Address
Sharon.Clisso@noaa.gov
(Sharon.Clisso@noaa.gov)
 
Small Business Set-Aside
N/A
 
Description
This is a combined synopsis/solicitation for commercial services prepared and processed in accordance with the Federal Acquisition Regulations (FAR) Part 12.6 as supplemented with additional information included in this notice. This is a solicitation from the U. S. Department of Commerce (DOC), National Oceanic and Atmospheric Administration (NOAA), Eastern Acquisition Division - Kansas City Office. The requirement is for the Base Year compliance of the NOAA Five Year Corrosion Package of Twin Otter aircraft N48RF for the NOAA Aircraft Operations Center (AOC) at MacDill AFB, Tampa FL. This notice constitutes the only Request for Quote (RFQ). Written offers are being requested. A hardcopy written RFQ will not be issued. DOC, Eastern Acquisition Division - Kansas City Office requires that all contractors doing business with this office be registered with the Central Contractor Registry (CCR). No award can be made to a company not registered in CCR. For additional information and to register in CCR please access the following web site: http://www.ccr.gov. In order to register, all offerors must have a Dunn & Bradstreet Number. A Dunn & Bradstreet number may be acquired free of charge by contacting Dunn & Bradstreet on-line at http://www.dnb.com/eupdate or by phone at (800) 333-0505. All contractors are also required to complete online Representations and Certifications at http://ORCA.BPN.GOV. This notice is hereby issued as RFQ WC133M-10-RQ-0801. This RFQ and the following incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2005-43. CLAUSES AND PROVISIONS The FAR and CAR clauses incorporated into this acquisition are: 52.212-1 Instructions to Offerors - Commercial Items (JUN 2008) [Paragraph (c) is amended from 30 days to 60 days] 52.212-2 Evaluation-Commercial Items (JAN 1999) (Evaluation Criteria: Technical & Past Performance) 52.212-3 Offeror Representations and Certifications Commercial Items (AUG 2009) 52.212-4 Contract Terms and Conditions (MAR 2009) 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders-Commercial Items (DEC 2009), Section (b) (18) (19), (20), (21), (22), (24), (33), (38) (c) (1) (2) (Equivalent Rate: Air Craft Mechanic $33.50/hour) 52.216-1 Type of Contract (APR 1984) (Firm Fixed Price) 52.222-49 Service Contract Act -Place of Performance Unknown (MAY 1989) (Wage Determination will be incorporated at time of award) 52.232-18 Availability of Funds (APR 1984) 1352.201-70 Contracting Officer's Authority (APR 2010) 1352.201-72 Contracting Officer's Representative (COR) (APR 2010) (To be designated at time of award) 1352.209-73 Compliance with the Laws (APR 2010) 1352.209-74 Organizational Conflict of Interest (APR 2010) 1352.228-70 Insurance Coverage (APR 2010) (See Insurance paragraph in Statement of Work) 1352.228-72 Deductibles Under Required Insurance Coverage - Fixed Price (APR 2010) 1352.233-70 Agency Protests (APR 2010) (b) Donita McCullough, DOC/NOAA/Eastern Acquisition Division-KC Office, 601 E. 12th Street, Room 1756, Kansas City, MO 64106 (c) DOC/NOAA/Eastern Acquisition Division-KC Office, 601 E. 12th Street, Room 1756, Kansas City, MO 64106 (e) US Department of Commerce, Office of the General Counsel, Chief, Contract Law Division, Room 5893, Herbert C. Hoover Building, 14th Street and Constitution Avenue, NW., Washington, DC 20230. FAX: (202) 481-5858. 1352.233-71 GAO and Court of Federal Claims Protests (APR 2010) 1352.245-70 Government Furnished Property (APR 2010) (See B.2 #9) 1352.246-70 Place of Acceptance (APR 2010) (DOC/NOAA/AOC/MacDill AFB, FL) FAR clauses and provisions are available on the internet website: http://www.acquisition.gov/far. CAR clauses and provisions are available on the internet website: http://oam.ocs.doc.gov/CAPPS_car.html PRICE/QUOTE: This is an order for commercial services. The lines item will be quoted and completed in accordance with the terms and conditions and statement of work specified herein. Prices quoted for the contract line items shall be firm-fixed price inclusive of all costs. SCHEDULE OF PRICES: LINE ITEM 0001: INITIAL CORROSION INSPECTION (per B.1 of Statement of Work) Quantity: 1 Unit: EA Unit Price: $_______ Amount: $_______ LINE ITEM 0002: SCHEDULED AND UNSCHEDULED MAINTENANCE, REPAIRS, INSPECTIONS, AND UPGRADES TO INCLUDE THE FOLLOWING: REPAINT COMPLETE AIRCRAFT (per B.2 of Statement of Work) Amount: $_______ PERFORM EMMA #48 NON EQUALIZED PROGRAM IN ACCORDANCE WITH PSM 1-7-6 (IC) (per B.2 of Statement of Work) Amount: $_______ PERFORM SB 6/523 PRIMARY FLIGHT CONTROL CABLE REPLACEMENT (per B.2 of Statement of Work) Amount: $_______ COMPLETE FIVE YEAR HYDRO OF RIGHT AND LEFT ENGINE FIRE BOTTLES (per B.2 of Statement of Work) Amount: $_______ REPLACE BOTH A-701 REVERSE CURRENT RELAYS (per B.2 Statement of work) Amount: $_______ OVERHAUL OF BOTH LEFT AND RIGHT GEAR LEGS (per B.2 of Statement of Work) Amount: $_______ FAR 91.411 PITOT, STATIC, ALTIMETER, TRANSPONDER RECERTIFICATION AND COMPASS SWING (per B.2 of Statement of Work) Amount: $_______ OVERHAUL OF LEFT PROPELLER ASSEMBLY (per B.2 of Statement of Work) Amount: $_______ INSTALL FUEL TANK KIT (per B.2 of Statement of Work) Amount: $_______ SKY CONNECT UPGRADE/INSTALL (per B.2 of Statement of Work) Amount: $_______ OXYGEN BOTTLE AND REGULATOR (per B.2 of Statement of Work) Amount: $_______ LINE ITEM 0003: OVER AND ABOVE DISCREPANCIES FROM INITIAL INSPECTION AS WELL AS ANY OTHER SCHEDULED OR UNSCHEDULED MAINTENANCE, REPAIRS, UPGRADES, AND INSPECTIONS - PARTS AND LABOR. (Per B.3 of Statement of Work) (Not to exceed amount to be determined by the Government at time of award.) LOADED LABOR RATE PER HOUR (Regular rate) $_______________ LOADED LABOR RATE PER HOUR (Overtime rate) $_______________ NEW PARTS DISCOUNT ___________% OVERHAULED PARTS DISCOUNT __________% SUPPLIES & CONSUMABLES DISCOUNT __________% Statement of Work for DHC-6-300 Five Year Corrosion Inspection and Scheduled/Unscheduled Maintenance Introduction: The National Oceanic and Atmospheric Administration (NOAA) owns/operates four deHavilland Twin Otters. This statement of work is for the compliance of the NOAA Five Year Corrosion Package of the Twin Otter. The aircraft requiring work is DHC-6-300 S.N. 740, current tail number N48RF with approximately seventeen thousand hours and fourteen thousand cycles. Aircraft will require complete repainting after the following work scope. Complete repaint was done in January 2006. A. Scope: The contractor shall comply with applicable Federal Aviation Regulations (FAR) and all aircraft manufacture's requirements. The Contractor will provide all special tools, facilities, equipment, and certified technical staffing to perform tasks. Maintenance Contractors must be an FAA approved repair station or equivalent Approved Maintenance Organization (AMO) if Canadian for the Twin Otter. The Government shall be responsible for scheduling all work against this contract. The Government reserves the right to exercise or cancel any part of this agreement. Once the aircraft arrives at the Contractors facility, no work shall begin until AOC has given the approval for such work to begin. Only the work that is being requested shall be done. Any additional work or discrepancies must have prior approval from the Contracting Officer. The Contractor shall provide a list of discrepancies/tear down inspection report to AOC. The report shall include the extent of the inspection, condition found on all major components, outstanding service bulletins and airworthiness directives that must be complied with, and any recommendations for maintenance that would prevent future failures if applicable. The Contractor may sub-contract out inspection, maintenance, overhaul, and repair work. The Government reserves the right to approve or disapprove, any sub contractor. The Contractor will be responsible for all FAA and AOC required documentation to include but not limited to approval for return to service. A.1 Delivery Requirements: A government flight crew shall fly the aircraft to the Contractor's facility. AOC and/or the flight crew shall notify the Contractor as soon as the need for service, inspection, and repair has been identified. If requested, all scheduled events and required services will be brought to the contractor's attention before award of the contract. Government owned parts, equipment, and property shall be returned to the Government. The cost of shipping the returnables shall be the responsibility of the Government. A.2 Quality Assurance: NOAA/AOC may desire to have a representative witness any part of this contract. The Contractor shall keep the NOAA/Contracting Officer's Technical Representative (COTR) apprised of the progress and schedule. Any repairs outside of this contract must be approved by the Contracting Officer before repairs are started. NOAA shall have access to the aircraft throughout the terms of this contract. NOAA will provide representative for final acceptance and test flight. A.3 Insurance Against Loss or Damage to Government Property: The Contractor shall, at its own expense, provide and maintain hull liability insurance of not less than $2,500,000.00 to cover the aircraft on which this work will be performed. The policies evidencing the required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Governments interest shall not be effective: - For such a period as the laws of the State in which this work is to be performed prescribe; or Until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer. A.4 Parts, Discounts, and Warranties: The Contractor shall provide all replacement parts, materials, and consumables. However, the Government reserves the right to provide the same, if advantageous at any time during the contract. The Government will make the final determination on whether new, new surplus, overhauled, repaired, or serviceable parts will be installed on the aircraft. Parts and components in an "as removed" status will not be installed on the aircraft. Any part or component that has not reached its recommended service life but fails inspection and needs to be replaced will be treated as an over and above. Since the government cannot determine which parts or components if any meet this criteria, maintenance contractors shall provide what labor rate they will charge the government, per hour for "over and above" discrepancies. Secondly, contractors are asked to provide what percent discount off list price or the cost plus percentage for replacement parts. Parts Manufacturer Approval (PMA) parts are acceptable. The Contractor shall provide the industry standard implied warranty on all products and service. A.5 Submittal of Invoices: The contractor shall prepare and submit invoices to NOAA/AOC at the address shown in block 15 of the Solicitation/Contract/Order for Commercial Items-Standard Form 1449. All invoices shall be based on work completed as of the end of the contractor's most recent billing period and shall be submitted to NOAA/AOC by the 10th day of the subsequent month. The Contractor shall be required to facsimile bi-weekly financial progress reports/partial invoice on all expenditures that will be invoiced to the Government. This report may not be the final invoice. However, the format may be the same. Partial invoices will only be processed after NOAA/AOC acceptance. B. Required Maintenance: B.1 The Contractor shall perform Initial Corrosion Inspection DHC-6-300 IAW Process Safety Management (PSM)1-6-5 Years 1 THRU 5 to include but not limited to the flowing: 1. Remove wing flight controls 2. Remove main landing gear, gear teardown and build up. (Overhaul of both Left and Right Gear legs required. see B.7) 3. Remove all interior 4. Remove floors-Repaint floor boards before reinstall. 5. Remove complete fuel tunnel and components 6. Remove all fuel bags and tape. New or Overhauled bags to be provided by Contractor. 7. Strip paint to bare metal on upper and lower wing surfaces in the exhaust paths. All seams will be resealed and all bare metal is to be spot primed for transit to paint shop. 8. Service Bulletins (SB) and Airworthiness Directives (AD's) to be included due to overlapping of inspection Areas: AD2009-04-09 SB V6/540 Front Spar Adaptor inspection AD95-21-14 SB 6/421 Post mod outboard elevator hinge arm AD 94-14-22 SB 6/512 Horizontal center hinge AD94-08-10 SB 6/492 Wing main spar lower cap angles AD89-24-06R1 SB 6/511 Elevator quadrant AD87-04-23 SB 6/474 Wing strut inspection AD80-03-08 SB 6/388 & 6/502 Inspection of post 502 Flight and Flap control rods. AD80-13-11 SB 6/390 & 6/502 Inspection of post 502 Flight control rods SB 6/454 Part A and Part B Tail adapter inspection. SB 6/507 Aileron cut channel SB 6/509 & 6/386 Nacelle longeron Inspection SB 6/513 & 6/438 Inspection horizontal attach bracket SB 6/521 Sta. 239 Inspection for cracks SB 6/528 Stay strut pin B.2 Scheduled and unscheduled maintenance, repairs, inspections, and upgrades to include the following: 1. Repaint of complete aircraft along with Contractor's choice and location of sub contractor, if applicable. Quote to include new Weight and Balance Computation. Statement of Work for paint will be provided upon request. 2. Equal Maintenance for Maximum Availability (EMMA) #48 Non Equalized Program in accordance with PSM 1-7-6(IC) and the following Special inspections: a. Wing & wing strut/ strut link attach bolts IAW PSM1-6-7 part2 SP2 items 5, 6, and 7 b. Wing Fail Safe inspection Stn. 152.IAW PSM 1-6-7 Part3 Page 16 c. Engine Nacelle Structure IAW PSM 1-6-7 Part 3 Page 17 3. Perform SB 6/523 Primary Flight Control Cable replacement. 4. Five year hydro of right and left engine fire bottles. New squibs to be installed on fire bottles. 5. Replace Both A-701 Reverse Current Relays with new or overhauled units. 6. Overhaul of both Left and Right Gear legs, Any repairs required other than standard overhaul and minor cleaning of corrosion and repaint will be treated as an over and above item. 7. Federal Aviation Regulations (FAR) 91.411 Pitot, Static, Altimeter, Transponder Recertification and Compass Swing 8. Overhaul of left propeller assembly part number HC-B3TN-3DY. 9. Install DeHavilland Aircraft Engineering Order E.O. 68965 Cabin Long Range fuel tank (L.H. Side Only). Viking Air Part Number C6PF1189-1 Kit, Long Range Fuel Tank to be provided by NOAA and installed by Contractor. 10. Sky Connect, Upgrade/Install of Flightdeck 7000 System. Transceiver PN 1616-450-01A, Antenna PN 1616-880-13, NAT PT12-100 PN 1616-301-01A and installation kit to be supplied by Contractor. 11. Hydrostatic check of oxygen bottle PN 80112-17 SN ST2315 and overhaul or replacement of regulator PN 800114-04 SN9193. B.3 Over and above discrepancies from initial corrosion inspection as well as any other scheduled or unscheduled maintenance, repairs, upgrades, and inspections. The Contractor is responsible for documenting and reporting, at intervals acceptable to the COTR, all discrepancies found during the inspection. Discrepancies that are not a part of the inspection will be known as "over and above." Corrective actions as a result of the inspection are considered "over and above" items. Any part or component that has not reached its recommended service life, but fails inspection and needs to be replaced, is considered an "over and above" item. "Over and Above" discrepancy report must include (as a minimum): • Description of each discrepancy found; • Number of person-hours per discipline required to complete each discrepancy; • Hourly rate for personnel performing the work; • Parts cost less the percentage discount, if any; • Total dollar amount for the complete list of discrepancies. The COTR will be responsible for reviewing the list of "over and above" discrepancies and making a recommendation to the Contracting Officer, to either accept or decline the contractor's proposal. The contractor shall not proceed with correcting any "over and above" discrepancies without prior approval from the Contracting Officer. The contractor shall bill all charges for "over and above" items on a separate invoice at the conclusion of repairs. Funds for the "over and above" items will be specified at the time of award and included in the Contract Line Item Number (CLIN) 0003. The dollar amount stated in the contract represents an estimated total, not to exceed amount to cover charges for the "over and above". The Government will pay invoices for "over and above "services out of the funds allocated and authorized on CLIN 0003. This paragraph applies only to CLIN0003. It is not possible prior to contract award to accurately estimate the extent and duration of work or to anticipate costs for CLIN0003 with any reasonable degree of confidence. Time and materials provide for acquiring these services will be on the basis of direct labor hours and cost of materials. Direct labor hours are at specified fixed hourly rates that include wages, overhead, general and administrative expenses, and profit. Cost of materials includes appropriate material handling cost as part of material costs. The price to be paid for material shall be based on an established catalog or list price in effect when material or other product is furnished, less all applicable discounts to the Government. In no event shall the price exceed the Contractor's sales price to its most favored customer for the same item in like quantity, or the current market price, whichever is lower. C.1 Evaluation Criteria: All contractors that have responded to the solicitation shall be evaluated under the following criteria: FACTOR 1 - TECHNICAL • Ability to accomplish the corrosion inspection plus scheduled maintenance items listed in Section B for Twin Otter aircraft IAW manufacturer's manual. • Ability to complete all items in required performance period (See D.1 for requirements). • Submitted proof of having maintained or repaired the same model aircraft within the past six months. • Submitted copy of FAA Repair Station Certificate, or Canadian AMO Center documentation. • Submitted proof of insurance documentation (see A.3 for requirements). • Submitted proof of factory trained technicians on staff. • Location of FBO and maintenance facility. • Number of work shifts in a 24 hour day (non-overtime), total service hours per day, and days of operation per week. • Name and location of Contractor's preferred paint shop and price of painting. (See B.2 #1.) FACTOR 2 - PAST PERFORMANCE: Must submit up to three references for recent and relevant contracts for the same or similar items and other references including contract numbers, points of contact with telephone numbers, and other relevant information. Technical and past performance, when combined, is slightly more important than price. As the technical ratings become more equal, price becomes more important. Conversely, as price proposals become more equal to one another, technical proposals will become a more important determining factor. NOAA will evaluate the offeror's proposed prices for fairness and reasonableness in relation to the solicitation's requirements. A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award. C.2 Basis for Award: The Government will evaluate the offer for award purposes on the basis of best value. D.1 Schedule: It is desired that this contract be started on or about October 1st 2010 and that the corrosion inspection along with the discrepancies as well as all scheduled maintenance, repairs, inspections, and upgrades listed in section B will be completed within two months. Actual schedule start and completion dates are to be negotiated between NOAA/AOC, Contracting Officer, and the Contractor.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOC/NOAA/CASC/WC133M-10-RQ-0801/listing.html)
 
Place of Performance
Address: Contractor's Facility, United States
 
Record
SN02206511-W 20100717/100715234756-9be9103f45c72ecc117fa8b9f61d7bca (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.