Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 22, 2010 FBO #3162
SOLICITATION NOTICE

Z -- West Foss Trail Bridge Installation

Notice Date
7/20/2010
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-6 Western Washington Acquisition Area, Mt. Baker-Snoqualmie NF, 2930 Wetmore Avenue Ste 3A, Everett, Washington, 98201
 
ZIP Code
98201
 
Solicitation Number
AG-05M6-S-10-0072
 
Point of Contact
Bonnie L. Childs, Phone: (425) 446-2743, Peter Wagner, Phone: 360-856-5700
 
E-Mail Address
bchilds@fs.fed.us, pswagner@fs.fed.us
(bchilds@fs.fed.us, pswagner@fs.fed.us)
 
Small Business Set-Aside
N/A
 
Description
This project consists of the construction of an approximately 90 feet long, 4 foot wide trail bridge, including the removal of hazard trees, staking of the bridge site, and construction of concrete abutments and an approach stairway. The project is located within the Alpine Lakes Wilderness, approximately.75 miles from the trailhead. A waiver to utilize a helicopter to transport bridge materials from the trailhead to the bridge site is approved, however, no other motorized equipment will be allowed in the Wilderness. The steel bridge susbstructure, wooden decking and railings will be Government supplied to the West Fork Foss Trailhead between August 6 to August 13, 2011. The trail can be reached by driving WA State Highway 2 approximately 50 miles east from Everett, WA to the Skykomish Ranger Station then continuing east on Hwy 2 for.5 miles to Foss River Road. Turn right on Foss River Rd. (also known as Forest Service Road 68) and continue on FSR 68 for approximately 5 miles. Turn left onto FSR 6835 and continue 2.0 miles to the West Fork Foss Trail #1064. Continue approximately.75 miles on the West Fork Foss Trail to the bridge site marked with flagging. Estimated issue date for the solicitation is on or about August 4, 2010. Estimated start work date is October 15, 2010 with all work completed by October 30, 2011. The government estimated price range is between $25,000.00 and $100,000.00. The technical contacts for this project are Tom Davis who can be reached at 360-677-2414 in Skykomish and Peter Wagner who can be reached at 360-856-5700 in Sedro Woolley. Interested parties can download a copy of the Solicitation documents from this website when they are available.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/05M6/AG-05M6-S-10-0072/listing.html)
 
Place of Performance
Address: Mt. Baker Snoqualmie National Forest, Skykomish Ranger District, King County, Washington, United States
 
Record
SN02210779-W 20100722/100720234524-f469e2863f1d2e90877e50bbfd7a134e (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.