Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 22, 2010 FBO #3162
AWARD

R -- RECOVERY ACTION: Field Engineer to provide support to the assistant manager for closure projects for the Recovery Act operations, maintenance, construction, and project oversight.

Notice Date
7/20/2010
 
Notice Type
Award Notice
 
NAICS
541330 — Engineering Services
 
Contracting Office
Department of Energy, Savannah River Nuclear Solutions, LLC, Savannah River Nuclear Solutions, LLC, Savannah River Site, Bldg 730-2B, Aiken, South Carolina, 29808, United States
 
ZIP Code
29808
 
Archive Date
7/31/2010
 
Point of Contact
Everlean Rutherford, Phone: 8038195467
 
E-Mail Address
everlean.rutherford@srs.gov
(everlean.rutherford@srs.gov)
 
Small Business Set-Aside
N/A
 
Award Number
DE-DT0001729
 
Award Date
7/16/2010
 
Awardee
PAI Corporation, 116 Milan Way, Oak Ridge, Tennessee 37830, United States
 
Award Amount
$325,593.60
 
Description
RECOVERY ACTION: 1.0 PURPOSE The purpose of this work activity is to provide support to the Assistant Manager for Closure Project (AMCP), in performing oversight of Recovery Act (ARRA) Operations, Maintenance, Construction and/or Project Oversight. 2.0 BACKGROUND With the Recovery Act funding allocation of more than $1.6 Billion, SRS will decommission surplus nuclear reactor facilities and non-nuclear facilities, accelerate transuranic (TRU) waste disposition, remediate soil and groundwater, and complete area closure. 3.0 SCOPE The contractor will provide support to DOE-SR in performing oversight and support functions for the ARRA project including, but not limited to, assisting DOE with oversight of work conducted at the Savannah River Site under the ARRA, and reviewing Safety Basis Documents, Technical Safety Requirements (TSRs), Auditable Safety Analyses, and other supporting documents, as applicable. The work will consist of a variety of ARRA Operations, Maintenance, Construction and/or Project Oversight work conducted at various nuclear and non-nuclear facilities at the SRS. The contractor must provide qualified personnel and supporting resources, as appropriate, to deliver efficient and cost effective support services for the requirements described below. Performance of these services requires the contractor to produce specific Work Products as identified below. The contractor will serve as facilitator to track progress on ARRA initiatives, prepare and submit reports per the requirements of the Act.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/89449ae80e1818ef1c7717865c38eb8f)
 
Record
SN02211498-W 20100722/100720235119-89449ae80e1818ef1c7717865c38eb8f (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.