Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF AUGUST 20, 2010 FBO #3191
AWARD

46 -- RECOVERY--46--PROJECT NUMBER 4990, Dry Creek (Warm Springs) Lake & Channel, CA Installation of a Water Filtration System at Dry Creek (Warm Springs) Lake & Channel, CA.

Notice Date
8/18/2010
 
Notice Type
Award Notice
 
NAICS
238990 — All Other Specialty Trade Contractors
 
Contracting Office
USACE District, San Francisco, ATTN: CESPN-CT, 1455 Market Street, San Francisco, CA 94103
 
ZIP Code
94103
 
Solicitation Number
W912P7-09-R-0024
 
Archive Date
9/17/2010
 
Point of Contact
Rolando Z. Camerino, (415) 503-6959
 
E-Mail Address
USACE District, San Francisco
(rolando.z.camerino@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912P7-10-C-0004-P00001
 
Award Date
8/17/2010
 
Awardee
B C SCHMIDT CONSTRUCTION, INC (101065329)<br> 5525 TURNER ROAD<br> WILLIAMS, CA 95987-5148
 
Award Amount
$253,481.00
 
Line Number
0005
 
Description
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): B C Schmidt Construction, Inc. Contract No W912P7-10-C-0004 This contract action was accomplished using other than competitive procedures because a statute exists that expressly authorizes or requires that the acquisition be made from a specific source or through another agency (FAR 6.302-5); specifically, Sole source awards under the 8(a) Program. Per FAR 6.302-5 a J&A is not required for this award. Furnish the U.S. Army Corps of Engineers (COE)San Francisco District with labor, materials, equipment and supplies necessary to perform the following additional work items (modification to contract W912P7-10-C-0004) for WSD Liberty Glen Campground Water Treatment Plant Replacement: 1. Miscellaneous design work - $ 14,730.00. 2. Design and construct new control system since existing control system would not be compatible with new filtration system without costly modifications -$61,768.00 3. Replace undersized pumps, i.e. existing pumps would not provide high enough water pressures to properly operate new filtration system - $ 30,143.00. 4. Design and construct new chlorination system to satisfy current State of California Regional Water Quality Control Board requirements, i.e. required to secure permit from Regional Board to operate new water treatment plant - $ 122,917.00. 5. Process water permit application - $ 14,420.00. 6. Install pre-filtration system recommended to extend life of main filters, particularly during seasonal periods of high lake turbidity levels - $ 9.503.00 TOTAL FOR ALL WORK ITEMS IS $ 253,481.00.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACAW07/Awards/W912P7-10-C-0004-P00001.html)
 
Record
SN02245856-W 20100820/100819000020-2bce122180dbfcdc2320b7d75e93d991 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.