Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF AUGUST 21, 2010 FBO #3192
SOLICITATION NOTICE

W -- 800 Sq Ft Clear Span Structure w/HVAC and Power Generation

Notice Date
8/19/2010
 
Notice Type
Combined Synopsis/Solicitation
 
Contracting Office
904th CCBn, Ft Irwin, CA 92310
 
ZIP Code
92310
 
Solicitation Number
W9124B-10-T-1103
 
Response Due
8/25/2010
 
Archive Date
2/21/2011
 
Point of Contact
Name: Client Services, Title: Sourcing Agent, Phone: 1.877.9FEDBID, Fax: 703.442.7822
 
E-Mail Address
clientservices@fedbid.com;
 
Small Business Set-Aside
Total Small Business
 
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, in conjunction with FAR 13.5, as applicable, and as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; bids are being requested and a written solicitation will not be issued. The solicitation number is W9124B-10-T-1103 and is issued as an invitation for bids (IFB), unless otherwise indicated herein. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2005-44. The associated North American Industrial Classification System (NAICS) code for this procurement is 532292 with a small business size standard of $7.00M. This requirement is a [ Small Business ] set-aside and only qualified offerors may submit bids. The solicitation pricing on www.FedBid.com will start on the date this solicitation is posted and will end on 2010-08-25 12:00:00.0 Eastern Time or as otherwise displayed at www.FedBid.com. FOB Destination shall be Ft Irwin, CA 92310 The USA ACC MICC Fort Irwin requires the following items, Meet or Exceed, to the following: LI 001, The contractor shall provide the requested number of 800 Sq Ft Clear Span STRUCTURES for Forward Operating Base (FOB) Warrior, as outlined in this Statement of Work (SOW). These STRUCTURES must be equipped with related equipment (i.e. lighting, Astroturf flooring, doors, walls, and generators to power lights and ample outlets) throughout the STRUCTURE. The contractor shall be responsible for furnishing all materials, labor and equipment necessary to deliver, set-up, and maintain Clear Span structures. Each Clear Span Structure will include full sidewall panels, lighting, 120v GFCI protect Receptacles, Astroturf flooring, fire extinguishers, and power generation sufficient to power the lights, HVAC and provide an additional 20Kw of power per structure. Back-up power generation is required at all times. The period of performance is 16 Sep - 16 Oct 2010. See the attached SOW for additional information regarding this requirement., 1, EA; LI 002, The contractor shall provide the requested number of 800 Sq Ft Clear Span STRUCTURES for Forward Operating Base (FOB) King, as outlined in this Statement of Work (SOW). These STRUCTURES must be equipped with related equipment (i.e. lighting, Astroturf flooring, doors, walls, and generators to power lights and ample outlets) throughout the STRUCTURE. The contractor shall be responsible for furnishing all materials, labor and equipment necessary to deliver, set-up, and maintain Clear Span structures. Each Clear Span Structure will include full sidewall panels, lighting, 120v GFCI protect Receptacles, Astroturf flooring, fire extinguishers, and power generation sufficient to power the lights, HVAC and provide an additional 20Kw of power per structure. Back-up power generation is required at all times. The period of performance is 23 Sep - 19 Oct 2010. See the attached SOW for additional information regarding this requirement., 1, EA; LI 003, The contractor shall provide the requested number of 800 Sq Ft Clear Span STRUCTURES for Forward Operating Base (FOB) Denver, as outlined in this Statement of Work (SOW). These STRUCTURES must be equipped with related equipment (i.e. lighting, Astroturf flooring, doors, walls, and generators to power lights and ample outlets) throughout the STRUCTURE. The contractor shall be responsible for furnishing all materials, labor and equipment necessary to deliver, set-up, and maintain Clear Span structures. Each Clear Span Structure will include full sidewall panels, lighting, 120v GFCI protect Receptacles, Astroturf flooring, fire extinguishers, and power generation sufficient to power the lights, HVAC and provide an additional 20Kw of power per structure. Back-up power generation is required at all times. The period of performance is 23 Sep - 19 Oct 2010. See the attached SOW for additional information regarding this requirement., 1, EA; LI 004, The contractor shall provide the requested number of 800 Sq Ft Clear Span STRUCTURES for Forward Operating Base (FOB) Dallas, as outlined in this Statement of Work (SOW). These STRUCTURES must be equipped with related equipment (i.e. lighting, Astroturf flooring, doors, walls, and generators to power lights and ample outlets) throughout the STRUCTURE. The contractor shall be responsible for furnishing all materials, labor and equipment necessary to deliver, set-up, and maintain Clear Span structures. Each Clear Span Structure will include full sidewall panels, lighting, 120v GFCI protect Receptacles, Astroturf flooring, fire extinguishers, and power generation sufficient to power the lights, HVAC and provide an additional 20Kw of power per structure. Back-up power generation is required at all times. The period of performance is 23 Sep - 19 Oct 2010. See the attached SOW for additional information regarding this requirement., 1, EA; LI 005, The contractor shall provide the requested number of 800 Sq Ft Clear Span STRUCTURES for Forward Operating Base (FOB) Miami, as outlined in this Statement of Work (SOW). These STRUCTURES must be equipped with related equipment (i.e. lighting, Astroturf flooring, doors, walls, and generators to power lights and ample outlets) throughout the STRUCTURE. The contractor shall be responsible for furnishing all materials, labor and equipment necessary to deliver, set-up, and maintain Clear Span structures. Each Clear Span Structure will include full sidewall panels, lighting, 120v GFCI protect Receptacles, Astroturf flooring, fire extinguishers, and power generation sufficient to power the lights, HVAC and provide an additional 20Kw of power per structure. Back-up power generation is required at all times. The period of performance is 23 Sep - 19 Oct 2010. See the attached SOW for additional information regarding this requirement., 1, EA; LI 006, The contractor shall provide the requested number of 800 Sq Ft Clear Span STRUCTURES for Forward Operating Base (FOB) Seattle, as outlined in this Statement of Work (SOW). These STRUCTURES must be equipped with related equipment (i.e. lighting, Astroturf flooring, doors, walls, and generators to power lights and ample outlets) throughout the STRUCTURE. The contractor shall be responsible for furnishing all materials, labor and equipment necessary to deliver, set-up, and maintain Clear Span structures. Each Clear Span Structure will include full sidewall panels, lighting, 120v GFCI protect Receptacles, Astroturf flooring, fire extinguishers, and power generation sufficient to power the lights, HVAC and provide an additional 20Kw of power per structure. Back-up power generation is required at all times. The period of performance is 23 Sep - 19 Oct 2010. See the attached SOW for additional information regarding this requirement., 1, EA; Solicitation and Buy Attachments ***Question Submission: Interested offerors must submit any questions concerning the solicitation at the earliest time possible to enable the Buyer to respond. Questions must be submitted by using the 'Submit a Question' feature at www.fedbid.com. Questions not received within a reasonable time prior to close of the solicitation may not be considered.*** For this solicitation, USA ACC MICC Fort Irwin intends to conduct an online competitive reverse auction to be facilitated by the third-party reverse auction provider, FedBid, Inc. FedBid has developed an online, anonymous, browser based application to conduct the reverse auction. An Offeror may submit a series of pricing bids, which descend in price during the specified period of time for the aforementioned reverse auction. USA ACC MICC Fort Irwin is taking this action in an effort to improve both vendor access and awareness of requests and the agency's ability to gather multiple, competed, real-time bids. All responsible Offerors that respond to this solicitation MUST submit the pricing portion of their bid using the online exchange located at www.FedBid.com. There is no cost to register, review procurement data or make a bid on www.FedBid.com. Offerors that are not currently registered to use www.FedBid.com should proceed to www.FedBid.com to complete their free registration. Offerors that require special considerations or assistance may contact the FedBid Helpdesk at 877-9FEDBID (877-933-3243) or via email at clientservices@fedbid.com. Offerors may not artificially manipulate the price of a transaction on www.FedBid.com by any means. It is unacceptable to place bad faith bids, to use decoys in the www.FedBid.com process or to collude with the intent or effect of hampering the competitive www.FedBid.com process. Should offerors require additional clarification, notify the point of contact or FedBid at 877-9FEDBID (877-933-3243) or clientservices@fedbid.com. Use of FedBid: Buyers and Sellers agree to conduct this transaction through FedBid in compliance with the FedBid Terms of Use. Failure to comply with the below terms and conditions may result in offer being determined as non-responsive. Bid MUST be good for 30 calendar days after close of Buy. Shipping must be free on board (FOB) destination CONUS (Continental U.S.), which means that the seller must deliver the goods on its conveyance at the destination specified by the buyer, and the seller is responsible for the cost of shipping and risk of loss prior to actual delivery at the specified destination. Offeror must be registered in the Central Contractor Registration (CCR) database before an award can be made to them. If the offeror is not registered in the CCR, it may do so through the CCR website at http://www.ccr.gov. Delivery must be made within 30 days or less after receipt of order (ARO). The offeror must provide within its offer the number of days - not to exceed 30 - required to make delivery after it receives a purchase order from the buyer. The selected Offeror must comply with the following commercial item terms and conditions, which are incorporated herein by reference: FAR 52.212-1, Instructions to Offerors - Commercial Items, applies to this acquisition; FAR 52.212-3, Offeror Representations and Certifications - Commercial Items - the selected offeror must submit a completed copy of the listed representations and certifications; FAR 52.212-4, Contract Terms and Conditions - Commercial Items; FAR 52.212-5, Contract Terms and Conditions Required To Implement Statutes or Executive Orders-Commercial Items, paragraph (a) and the following clauses in paragraph (b): 52.222-21, 52.222-26, 52.222-35, 52.222-36, 52.222-37, 52.225-13, 52.232-34. The full text of the referenced FAR clauses may be accessed electronically at http://www.acqnet.gov/far.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/b8046f57eb3d9d24f29bc64b49580eb7)
 
Place of Performance
Address: Ft Irwin, CA 92310
Zip Code: 92310
 
Record
SN02247080-W 20100821/100819235608-b8046f57eb3d9d24f29bc64b49580eb7 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.