SOLICITATION NOTICE
Z -- Road 2153375 Reconstruction
- Notice Date
- 8/24/2010
- Notice Type
- Presolicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Agriculture, Forest Service, R-6 Western Oregon ZAP, Willamette NF, 3106 Pierce Parkway, Suite D, Springfield, Oregon, 97477, United States
- ZIP Code
- 97477
- Solicitation Number
- AG-04R4-S-10-0031
- Archive Date
- 8/24/2011
- Point of Contact
- Lorenzo R Montoya, Phone: 541-225-6334, Jeri L Ledgerwood, Phone: (541) 225-6475
- E-Mail Address
-
lrmontoya@fs.fed.us, jledgerwood@fs.fed.us
(lrmontoya@fs.fed.us, jledgerwood@fs.fed.us)
- Small Business Set-Aside
- N/A
- Description
- Work includes reconditioning of roadway, cleaning of ditches, culvert inlets and outlets and the removal of a large volume of slough and slide material including material from old disposal sites. In addition there is roadside brushing, falling of danger trees, supply and placement of aggregate, repair of existing culverts and the placement of riprap. Removal and/or placement of 18, 24, 30 and 36-inch culverts (dewatering is required in any culvert work with water present) is also included in work. The successful Contractor shall furnish all labor, equipment, supervision, transportation, supplies (except those designated as Government-furnished), and incidentals to accomplish all work necessary. The Government estimate is between $25,000 and $100,000. The successful offeror shall be required to submit Alternative Payment Protection (100% of contract amount) prior to start of work. Contract time is 45 calendar days. Estimated start work date is October 4, 2010. The solicitation packet will be posted to FedBizOpps on or about September 8, 2010. For technical questions, contact Mary Lee Sayre at 541-782-5357.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/04R4/AG-04R4-S-10-0031/listing.html)
- Place of Performance
- Address: This project is located on the Middle Fork Ranger District, Willamette National Forest, in Lane and Douglas Counties, Oregon. To access the project site from Oakridge, Oregon travel east on highway 58 for 2.46 miles, turn right onto County Road 0736-1229 (Hills Creek Resevoir). Travel 0.54 miles, turn right onto Forest Service Road 21, road is double laned paved. Travel 31.90 miles to the end of Road 21. Road 21 turns into Road 2153 at this point. It is a single lane paved road. Proceed ahead 3.72 miles to Road 2153375 on right, this is the beginning of project., Oregon, United States
- Record
- SN02252168-W 20100826/100824234900-4989f4ab60554ce620eed7b9f0415a7a (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |