SOLICITATION NOTICE
41 -- Main Boiler System inspection and start up at the Joliet Job Corps Center
- Notice Date
- 8/25/2010
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 611430
— Professional and Management Development Training
- Contracting Office
- Department of Labor, Employment Training Administration, Joliet Job Corps center, 1101 Mills Road, Joliet, Illinois, 604533
- ZIP Code
- 04533
- Solicitation Number
- BOIL2010
- Archive Date
- 9/24/2010
- Point of Contact
- Ron M. Schell, Phone: 8157688877, Steven Veasey, Phone: 815-768-8908
- E-Mail Address
-
schell.ron@jobcorps.org, veasey.steven@jobcorps.org
(schell.ron@jobcorps.org, veasey.steven@jobcorps.org)
- Small Business Set-Aside
- N/A
- Description
- Scope of Work Table of Contents I. Proposal Information II. Project Description III. Specific Requirements IV Construction Requirements V. Proposal Form I. Proposal Requirements Project: The intent of this scope of work is to provide start up and inspection of main boiler systems at the Joliet Job Corps Center. Owner: US Department of Labor (DOL) Employment and Training Administration Center Operator : Adams and Associates, Inc Mailings address 1101 Mills Rd. Joliet, IL 60433 Proposal Due Date: September 9 th 2010 by 4:00pm Evaluation Criteria: Cost Experience/Service Quality Payment: The Center will make payment within 30 days of completion. Site Visit Date: September 3 rd 2010 @ 10:00am a) Contractor shall visit the site and familiarize himself with the condition under which the work will be performed. No allowance will be made for any error on the contractors part for failure to take into account any conditions or circumstance existing at the site which might affect the contemplate work. The fact that a bid is submitted will be taken as evidence that the contractor has full knowledge of the extent and character of the contemplate work and any problem to be encountered in the performing same. II. Project Description Scope of Project: This project consists of but not limited to inspection/repairs and cleaning of Boiler burner tubes, pressure testing tubes, replacement feed water valves, Low water cut off and inspection of control valves. III Specific Requirements: Clean and inspect boiler burner tubes to make sure of proper running condition. Pressure test tubes to make sure they do not have leaks. Make full report on if tubes need to be replaced or punched. Replace feed water valves for chiller water. Replace feed water valves for boiler. Replace low water cut off. Replace south boiler isolation gate valve 8". Replace butterfly feed valves boilers. Replace drain/blow down valves. Check and Adjust firing rate controls to controls gas to boiler (safety issue) Warrantees: •a) The contractor is to provide written warranty for the above statements at time of completion of job IV Construction Requirements Center Regulations: Contractor and his employees shall abide by all of the Center's rules and regulations. There shall be no fraternization between contractor personnel and Job Corps Center students or personnel. The Contractor will be required to follow all Center safety and security requirements. Management of Jobsite: The Contractor shall maintain a clean and safe workplace that is secured at the end of each working day. The Contractor shall clear all deliveries with the Center's security personnel. Wage Rates: The bidders shall conform to the latest Davis-Bacon prevailing wage rate decisions for the area. Insurance: The Contractor shall obtain and maintain insurance as follows: Workman's Compensation/Employers Liability insurance, to meet New York statutory requirements Comprehensive General Liability ($1,000,000 per occurrence) Comprehensive Automobile Liability ($1,000,000/combined single limit) Fire Legal Liability ($500,000 per occurrence) The Contractor must cover any deductible costs. Upon contract award, the Contractor must add Joliet Job Corps Center as additional named insured to the policies. Schedule: The Contractor shall submit a schedule for the work. The project shall be completed within 30 days of the award of the contract. Written authorization is required to extend the 30 day completion requirements. Final Acceptance The Contractor shall notify the Center's facility manager when the project is substantially complete, and shall request an inspection. The completion of this inspection shall determine the date for the commencement of the warrantees, and the date for payment. V. Proposal Form The Contractor shall submit the following information with the proposal: A list of materials and product data sheets proposed for use. References Copies of Insurance Certificates
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOL/ETA/ETA/BOIL2010/listing.html)
- Record
- SN02254026-W 20100827/100825235032-0b8ea3af8c3a509247a032fee625fd47 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |