MODIFICATION
Z -- At the site visit the A&E made reference to two inspections. I am posting information regarding those inspections.
- Notice Date
- 8/25/2010
- Notice Type
- Modification/Amendment
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- USPFO for Ohio, 2811 West Dublin-Granville Road, Columbus, OH 43235-2788
- ZIP Code
- 43235-2788
- Solicitation Number
- W91364-10-B-0002
- Response Due
- 9/9/2010
- Archive Date
- 11/8/2010
- Point of Contact
- Joseph Miracle, 614-336-7208
- E-Mail Address
-
USPFO for Ohio
(joseph.miracle@us.army.mil)
- Small Business Set-Aside
- N/A
- Description
- A. Construction Compliance Inspection (CCI) 1. The Government will perform a Construction Compliance Inspection (CCI) to assess construction progress and to identify problem areas with target interface items early to avoid costly and extensive corrective actions and project delays at the Target Interface Inspection (TII). Target interface items include all portions of construction that physically connect to the target equipment or provide for the protection of the equipment. The U.S. Army Training Support Center (ASTC) will schedule the CCI in conjunction with the RTLP MCX (HNC), the applicable Corps of Engineers District, PEO-STRICOM, the installation, and the Major Command (MACOM) when construction has reached the point that the following items can be checked (usually about midpoint of construction). A minimum of one of each type of target emplacement shall be complete, including the installation of electrical power equipment, all data equipment including power and data cables and conduits. In all cases, the fiber termination racks and samples of the power and data cables and associated connectors shall be on site and available for inspection, but they do not have to be installed. Space shall be shown for the master fiber panel(s) and cable trays or wireways for routing cables to range operating system(s). A CCI Checklist has been developed to conduct this inspection, Any required items noted during the CCI shall be corrected prior to continuing to the next phase. All other items shall be corrected in a timely manner. B. Target Interface Inspection (TII) 1. The Government will perform a Target Interface Inspection (TII) when all target equipment interface points are completed and ready for inspection (usually around the 90 95 percent construction completion or about 30 days prior to the end of construction). The U.S. Army Training Center (ATSC) will schedule the TII in conjunction with the RTLP MCX (HNC), the applicable Corps of Engineers District, the installation, the MACOM, PEO-STRICOM, and the target installation contractor. All target emplacements shall be complete, including the installation of all electrical power equipment, and all data equipment including power and data cables and conduits. Power cables shall be connected to all associated electrical equipment and tested. At the target emplacements, fiber data cables shall be terminated/connected in the TPP (target patch panel) and tested. At the range operations center, fiber data cables shall be terminated/connected in the fiber termination rack (FTR) and tested. Cable tray(s) or wireway(s) for routing cables to range operating system(s) shall be installed. 120/240V, 20A circuits shall be installed in junction boxes near the master fiber panel or the fiber termination rack. A TII Checklist has been developed to conduct this inspection. Any items noted during the TII shall be corrected prior to closeout of the construction contract.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/NGB/DAHA33/W91364-10-B-0002/listing.html)
- Place of Performance
- Address: USPFO for Ohio 2811 West Dublin-Granville Road, Columbus OH
- Zip Code: 43235-2788
- Zip Code: 43235-2788
- Record
- SN02254904-W 20100827/100825235803-fca28b7a2b4e9f4d750dc8b3009b67fa (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |