AWARD

Y -- ADD/ALTER DEPLOYMENT CENTER, FY10 (CI) FXBM013004, Ellsworth AFB, SD

Notice Date
9/8/2010
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
USACE District, Omaha, 1616 Capital Ave, Omaha, NE 68102-4901
 
ZIP Code
68102-4901
 
Solicitation Number
W9128F10R0044
 
Response Due
8/6/2010
 
Archive Date
10/8/2010
 
Point of Contact
Polina Poluektova, 402-995-2091
 
E-Mail Address
USACE District, Omaha
(polina.a.poluektova@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W9128F10C0072
 
Award Date
9/7/2010
 
Awardee
BIG-D CONSTRUCTION CORP. (047114848)<br> 404 W 400 S<br> SALT LAKE CITY, UT 84101-1108
 
Award Amount
$14,350,300.00
 
Line Number
All Basic and Option Items excl O-5
 
Description
Deployment Center will consist of a renovated area and a new addition and will provide for the deployment of approximately 330 personnel with their associated gear and cargo. Approximately 100 staff members will be involved in the deployment process as well with operations and associated office spaces. Design scope will include 60%, 100% and 100% Corrected Final design documents (plans and specifications) prior to placing construction. Approximately 31,000 SF of the existing Deployment Center will be redesigned and renovated to allow for more efficient area use. Functions within the renovated processing facility area include: Receiving, ID Check and processing, holding and amnesty, conveyance operating equipment (GFGI), X-Ray Equipment (GFGI), baggage handling, air mobility warehouse upgrades, counseling and briefing, medical examination, classrooms, computer rooms, weapons vault, kitchen, storage, toilet/showers, laundry, offices, mechanical and electrical room upgrades. The structural addition will be approximately 20,000 SF in size, including a canopy area. This area will be utilized primarily for personnel and baggage deployment and cargo operations, but will have a dedicated area for new administrative offices as well. Area functions will include personnel interviewing, filing, toilets/showers, and administration and storage. The cargo area will contain conveyance operating equipment (GFGI) and baggage handling operations for loading and transport through truck bays w/sectional doors. Structural Systems (new construction), footings will consist of isolated spread footings of reinforced concrete below structural columns and continuous footings below bearing walls and building perimeter of reinforced concrete; slab-on-grade reinforced concrete with crushed rock capillary and non-expansive engineered fill, steel framing and roof secondary framing consisting of LH-series open web steel joists and wide rib roof decking. The roof system will consist of two types of structural standing seam metal roofs. The roof over the existing building will be replaced with a retro-fit metal roof system to provide adequate slope and drainage to the east side of the facility. The new addition roof will be a metal roof sloped to the west side of the new building. Both metal roof systems will provide for R-30 insulating value thru the roof envelope. The roof slopes will be a minimum of 1/2-inch per foot. Windows shall be 1-inch-thick insulated units installed in thermally broken color-coated aluminum frames. Exterior walls will be constructed of a combination of composite insulated metal panels with factory finish and decorative masonry veneer. Wall system will be a combination of non load-bearing cold-formed steel studs and CMU. Walls between classrooms, offices and toilet rooms and interior corridor walls shall be full height partitions with acoustical insulation constructed of metal studs and gypsum board. All other interior walls will consist of metal studs and 5/8-inch gypsum board partitions. Office spaces, classrooms, computer labs and counseling rooms shall receive carpet tile on floors, paint on walls and rubber base. All main corridors will have resilient flooring and base. Some walls will have wainscot of proactive wall covering (either vinyl wall covering or panel system) with paint above. Toilet Rooms, Showers and the Kitchen will have porcelain and ceramic tile. Janitor closets, mechanical rooms, electrical rooms, and weapons vault will receive sealed concrete floors and paint on walls. The Cargo Area floor will be a high performance epoxy coating, with gray color. Millwork shall typically be plastic laminate cabinets with solid surface material counters and back splashes. Stainless steel cabinets and counters will be required in the kitchen area. Interior doors and trim will be wood finish. Mechanical and Electrical work includes HVAC, EMCS digital control system, plumbing, fire protection, fixtures, power panels and fiber optic communications. Equipment includes X-Ray, refrigerators, range, microwave, freezer, dishwasher, ice machine, ovens, flat screen monitors, overhead projectors and a facility furniture package. Site work includes parking, paving, grading, exterior lighting, gas, electrical, water and communications.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA45/W9128F10R0044/listing.html)
 
Record
SN02272423-W 20100910/100908235153-46fec39272f9ca3e49d07ab90560bfbb (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.